철골세우기의 현장생산성 측정 및 영향요인 분석 (Productivity Measurement and Analysis on Factors in Steel Erection)

  • 이지용;허영기;안방률
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究) (The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction)

  • 김준호;김광희;조형근
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

네트워크를 이용한 AM1 로봇의 원격 동적 제어 (Remote Dynamic Control of AMl Robot Using Network)

  • 김성일;배길호;김원일;한성현
    • 한국공작기계학회:학술대회논문집
    • /
    • 한국공작기계학회 2001년도 춘계학술대회 논문집(한국공작기계학회)
    • /
    • pp.229-233
    • /
    • 2001
  • In this paper, we propose a remote controller for robot manipulator using local area network(LAN) and internet. To do this, we develope a server-client system as used in the network field. The client system is in any computer in remote place for the user to log-in the server and manage the remote factory. the server system is a computer which controls the manipulator and waits for a access from client. The server system consists of several control algorithms which is needed to drive the manipulator and networking system to transfer images that shows states of the work place, and to receive a Tmp data to run the manipulator. The client system consists of 3D(dimension) graphic user interface for teaching and off-line task like simulation, external hardware interface which makes it easier for the user to teach. Using this server-client system, the user who is on remote place can edit the work schedule of manipulator, then run the machine after it is transferred and monitor the results of the task.

  • PDF

철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발 (Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE)

  • 박상민;손창백;이동은
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

공동주택 설비공사 계획 업무의 중요도 분석에 관한 연구 (Analyzing Construction Planning Tasks for Performance Improvement)

  • 강상훈;김대영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.165-166
    • /
    • 2018
  • The main focus of this study is the analysis of the importance of the planning work of apartment housing projects. Group the detailed work of the facility into five major tasks, categorize each into five major categories, organize the construction plans (P1 through P 6), name the plans (C4), and analyze the quality of the environmental management plans (E1 through E 4) Finally, this study derived major planning tasks from the correlation between planning and cost metrics and from the T-test.

  • PDF

병원간호사의 탄력적 근무형태적용에 대한 인식 및 선호하는 근무형태 조사 (A Study for Perception and Preference on Flexible Working Pattern of Nurses in Hospital)

  • 김영혜;양영옥
    • 간호행정학회지
    • /
    • 제13권2호
    • /
    • pp.167-175
    • /
    • 2007
  • Purpose: The Purpose of this study was to identify for perception and preference on Flexible working pattern of Nurses in hospital. Method: The subjects were 260 nurses enrolled in 11 hospitals located in S and P city. Questionnaire method was utilized for data collection. Data was analyzed by SPSS statistical program. Results: 86.5% of the nurses were working 3 shifts. 70.8% of nurses agreed that they decided to give up nurses because of very irregular working pattern. They want to work 40hrs/weeks, and agree to applying to Flexible working pattern. There was statistically significant between career(F=2.839, p=.039), working place(F=3.086, p=.047), the mind of change of occupation(F=.479, p=.002) and expected life pattern change after applicating for Flexible working pattern. Conclusion: We need to Various Flexible working pattern model. As well as we need to public information about nurses' Flexible working pattern.

  • PDF

혼류 조립 공장을 위한 계층적 생산 계획 및 통제 시스템 개발 - 냉장고 공장 사례 (Development of Hierarchical Production Planning and Control System for Mixed-Model Assembly Manufacture-an Application in Refrigerator Factory)

  • 신현준
    • 산업공학
    • /
    • 제19권1호
    • /
    • pp.34-42
    • /
    • 2006
  • This paper presents a scheme for a hierarchical production scheduling and control system for a refrigerator factory with mixed model assembly lines. The setting of the factory is as follows. There are three mixed-model assembly lines called main line A, B and C and two batch lines that supply parts to the main lines. For each of the main lines, three work-centers are dedicated to them. The sub-lines and work-centers produce parts in batch type. An incoming production order from the master planner is characterized by its product type, amount, and due date. Under this situation, the proposed scheme has several features to schedule and control the above mentioned factory; 1) select the starting time and the place (assembly line) for an order processing, 2) devise a way to control orders to be processed as scheduled, and 3) reschedule orders when something unexpected happen. Finally, this paper provides a case study where the proposed scheme is applied to.

A STUDY ON SPACE ZONING BY COMPUTING IDLE-TIMES IN CONSTRUCTION PROCESSES

  • Sang-Min Park;Won-Suk Jang;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.509-512
    • /
    • 2013
  • An inappropriate space zoning plan causes the unnecessary transportation of construction material and equipment among work areas and increases the disorder of work space. Space zoning is an essential operation management technique which contributes to reduce the process and/or operation idle-time. This paper introduces a method that computes the idle-times between construction operations (or processes) by using Web-CYCLONE. It allows computing with idle-times that affect the construction productivity. Using the idle time between operations and between processes, it computes the optimal number of zones and finds the optimal combination of zones that minimize the idle times. The method contributes to minimize the idle times relative to the operation schedule using complete enumeration. This paper presents the system prototype in detail. A case study is presented to demonstrate the system and verifies the validity of the model. It allows a project manager to establish space zoning plan that effectively segregates a project into optimal number of construction zones and to assign the constrained resources (e.g., laborer, equipment).

  • PDF

A parallel tasks Scheduling heuristic in the Cloud with multiple attributes

  • Wang, Qin;Hou, Rongtao;Hao, Yongsheng;Wang, Yin
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제12권1호
    • /
    • pp.287-307
    • /
    • 2018
  • There are two targets to schedule parallel jobs in the Cloud: (1) scheduling the jobs as many as possible, and (2) reducing the average execution time of the jobs. Most of previous work mainly focuses on the computing speed of resources without considering other attributes, such as bandwidth, memory and so on. Especially, past work does not consider the supply-demand condition from those attributes. Resources have different attributes, considering those attributes together makes the scheduling problem more difficult. This is the problem that we try to solve in this paper. First of all, we propose a new parallel job scheduling method based on a classification method of resources from different attributes, and then a scheduling method-CPLMT (Cloud parallel scheduling based on the lists of multiple attributes) is proposed for the parallel tasks. The classification method categories resources into different kinds according to the number of resources that satisfy the job from different attributes of the resource, such as the speed of the resource, memory and so on. Different kinds have different priorities in the scheduling. For the job that belongs to the same kinds, we propose CPLMT to schedule those jobs. Comparisons between our method, FIFO (First in first out), ASJS (Adaptive Scoring Job Scheduling), Fair and CMMS (Cloud-Minmin) are executed under different environments. The simulation results show that our proposed CPLMT not only reduces the number of unfinished jobs, but also reduces the average execution time.

경기도지역 학교급식시스템 유형별 생산관리 실태조사 (Analysis on Production Processes between Conventional and Commissary School Foodservice Systems in Kyunggi-do)

  • 양일선;이진미;이보숙;한경수
    • 대한지역사회영양학회지
    • /
    • 제2권2호
    • /
    • pp.206-217
    • /
    • 1997
  • This study was designed to analyze and compare production management practices and labor productivity between conventional and commissary school foodservices and 46 dietitians of commissary school foodservices in Kyunggi-do. The response rates were 89.7% and 91.3$\%$, respectively. The number of meals served was ranged from less than 100 to over 1, 900 in conventional school foodservices and from 200 to 1, 600 in commissary foodservices. Thirty three conventional foodservices(42.3%) produced less than 300 meals per day. Numbers of satellite school per central kitchen were ranged from 1 to 5 schools ; fifty percent of commissary foodservices have contained 3 satellite schools. Meals for satellite schools were transported between 11:00 a.m.and 12:00 a.m ; transportation time was from 10 to 90 minutes. Waiting time before service in satellite schools was between 10 minutes and 80 minutes. Part time employees supported by parents were hired in 37.3$\%$ of conventional and 50$\%$ of commissary school foodservices. Voluntary workers were supplied for 64.9$\%$ of conventional and 52.4$\%$ of commissary school foodservices. Labor productivity was calculated from work schedule. Labor productivity(labor minutes per meal)was lowest in foodservices with 101-4-- meals(8.48 min)was lower than that of foodservices with above 401 meals ; no significant differences were found among 401-700(6.02 min), 701-1, 100(4.01 min), 1, 101-1, 500(3.41 min), and 1, 501-1, 900(3.15 min)meals in conventional foodservices. Labor minutes per meal of foodservices which served less than 400 meals(6.90 min) per day was significantly lower than those of foodservices which served 401-1, 900 meal(3.41-4.92 min) in commissary foodservices(p<0.05)

  • PDF