1 |
Kotani, S., Ito, T., and Ohno K. (2004), Sequencing problem for a mixed-model assembly line in the Toyota production system, International Journal of Productoin Research, 42(23), 4955-4974
DOI
ScienceOn
|
2 |
Miltenburg, G. J,. and Sinnamon, G. (1989), Scheduling Mixed-Model Multi-Level Just In Time Production Systems, International Journal of Production Research, 29, 1478-1509
|
3 |
Baek, J. K. (1996), A batch scheduling scheme for the work-center that supplies parts to mixed-model assembly line, M.S. Thesis, Korea University
|
4 |
Jin, M., and David, W. S. (2003), A new heuristic method for mixed model assembly line balancing problem, Computers and Industrial Engineering, 44(1), 375-392
|
5 |
Ding, F. Y., and Tolani, R. (2003), Production planning to support mixed-model assembly, Computers and Industrial Engineering, 45(3), 375-392
DOI
ScienceOn
|
6 |
Moon, D. H., Song, S., and Ha, J. H. (2005), A simulation study on the operation of the painted body storage in an automobile factory, IE Interfaces, 18(2), 136-147
|
7 |
Webster, S., and Baker, K. R. (1995), Scheduling groups of jobs on a single machine, Operations Research, 43(4), 692-703
DOI
ScienceOn
|
8 |
Shin, H. J., and Leon, V. J. (2004), Scheduling with product family set-up times: an application in TFT LCD manufacturing, International Journal of Productoin Research, 42(20), 4235-4248
DOI
ScienceOn
|
9 |
Okamura, K., and Yamashina, H. (1979), A Heuristic Algorithm for the Assembly Line Model-Mix Sequencing Problem to Minimize the Risk of Stopping the Conveyor, International Journal of Production Research, 17(3), 233-247
DOI
|
10 |
Kim, S. L., Hayya, J. C., and Hong, J. (1995), Setup reduction and machine availability, Production and Operations Management, 4(1), 76-90
DOI
|
11 |
Miltenberg, G. J. (1989), Level schedules for mixed-model assembly lines in just-in-time production systems, Management Science, 35(2), 192-207
DOI
ScienceOn
|