• Title/Summary/Keyword: work schedule

Search Result 591, Processing Time 0.022 seconds

a linear system approach

  • 이태억
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.10a
    • /
    • pp.118-118
    • /
    • 1993
  • We consider a discrete event dynamic system called periodic job shop, where an identical mixture of items called minimal part set(MPS) is repetitively produced in the same processing order and the primary performance measure is the cycle time. The precedence relationships among events(starts of operations) are represented by a directed graph with rocurront otructure. When each operation starts as soon as all its preceding operations complete(called earliest starting), the occurrences of events are modeled in a linear system using a special algebra called minimax algebra. By investigating the eigenvalues and the eigenvectors, we develop conditions on the directed graph for which a stable steady state or a finite eigenvector exists. We demonstrate that each finite eigenvector, characterized as a finite linear combination of a class of eigenvalue, is the minimum among all the feasible schedules and an identical schedule pattern repeats every MPS. We develop an efficient algorithm to find a schedule among such schedules that minimizes a secondary performance measure related to work-in-process inventory. As a by-product of the linear system approach, we also propose a way of characterizing stable steady states of a class of discrete event dynamic systems.

  • PDF

Factors Affecting Selection & Combination of Earthwork Equipments (토공장비 선정 및 조합을 위한 영향요인 연구)

  • Choi, Jae-Hwi;Lee, Dong-Hoon;Kim, Sun-Hyung;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.201-205
    • /
    • 2010
  • Earthwork is an essential initial work discipline in construction projects and open to significant impacts of several factors such as weather, site conditions, soil conditions, underground installations and available construction machinery, calling for careful planning by managers. However, selection and combination of construction machinery and equipment for earthwork still depends on experience or intuition of managers in construction sites, with much room left for proper management in terms of cost, schedule and environmental load control. This research aims to analyze the performance of earthwork equipment and establish relations among various factors affecting a model for optimizing selection and combination of earthwork equipment as a precursor to the development of such model. We expect the conclusions herein to contribute to optimizing selection and combination of earthwork equipment and provide basic inputs for the development of applicable model that can save costs, reduce schedule and mitigate environmental load.

  • PDF

A Study on Determination of Starting Temperature for the Method of Simulated Annealing (Simulated Annealing법의 적용시 Starting Temperature 결정에 관한 연구)

  • Lee, Young-Jin;Lee, Kwon-Soon
    • Proceedings of the KIEE Conference
    • /
    • 1992.07a
    • /
    • pp.288-289
    • /
    • 1992
  • The method of simulated annealing is a technique that has recently attracted significant attention as suitable for optimization problem of very large scale. If the temperature is too high, then some of the structure created by the heuristic will be destroyed and unnecessary extra work will be done. If it is too low then solution is lost, similar to the case of a quenching cooling schedule in the Simulated Annealing (SA) phase. Therefore, a crucial issue in this study is the determination of the starting temperature and cooling schedule for SA phase.

  • PDF

A study on mathematical modeling by neural networks (신경회로망을 이용한 수학적 모델에 관한 연구)

  • 이영진;이권순
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10a
    • /
    • pp.624-627
    • /
    • 1992
  • Mathematical modeling is majorly divided into three parts: the derivation of models, the fitting of models to data, and the simulation of data from models. This paper focuses on the parameter optimization which is necessary for the fitting of models to data. The method of simulated annealing(SA) is a technique that has recently attracted significant attention as suitable for optimization problem of very large scale. If the temperature is too high, then some of the structure created by the heuristic will be destroyed and unnecessary extra work will be done. If it is too low then solution is lost, similar to the case of a quenching cooling schedule in the SA phase. In this study, therfore, we propose a technique of determination of the starting temperature and cooling schedule for SA phase.

  • PDF

자동화 공정에서 워크스테이션 컨트롤러의 스케줄러 개발

  • 이원배;도성희;박경진;강무진
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1992.04a
    • /
    • pp.359-363
    • /
    • 1992
  • As the demands of manufacturing automation is increasing, lots of efforts are devoted to the applications of Computer Integrated Manufacturing(CIM) concept in manufacturing shop floor. A workstation is a computer which controls differnet machines in the low level of factory(shop floor). A workstation can be utilized efficiently to enhance the coopetative work of machines. A scheduler is a component program in a workstation and it controls the operation of machines according to a fixed plan. A scheme for the scheduler has been developed for selected machines and software has been made. The fixed plan is stored in a schedule file which keeps machine names, communications methods, information for communications and time for the usages, etc. The scheduler carries out its role by the information in the schedule file. Although the developed software has some Iimitations, the test results show that the scheduler can be applied easily to the automation of the low level of factory.

A Comparison of Dispatching Rules for Auxiliary Resource Constrained Job Shop Scheduling (추가자원제약을 갖는 Job Shop 작업계획의 성능 비교)

  • Bae Sang-Yun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.1
    • /
    • pp.140-146
    • /
    • 2005
  • This study presents the new dispatching rules of job shop scheduling with auxiliary resource constraint to improve the schedule performance measures related to completion time and due dates. The proposed dispatching rules consider the information of total work remaining and machine utilization to decrease mean flowtime and mean tardiness. The results of computer experiments show that those schedule performances are significantly improved by using the new dispatching rules. The results provide guidance for the researchers and practitioners of auxiliary resource constrained job shop scheduling to decrease mean flowtime and mean tardiness.

Sequencing for Mixed-model Assembly Lines Considering Part Supplier in Just-in-time Production Systems (JIT생산시스템에서 부품공급업자를 고려한 혼합조립순서결정에 관한 연구)

  • 남궁석;이상용
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.1-16
    • /
    • 1997
  • This paper improves the autonomy for supplier's schedule and the flexibility of the final assembly line. The final assembly line is a single work station and each product taking different assembly time is considered. In the assembly schedule, the heuristic method based on the goal chasing method is used. Consequently, suppliers can independently determine their output rates and thus, change their workload pattern according to their needs and priorities. Moreover, this flexibility can help to avoid expensive final-assembly-line stoppages in case of sudden part supply disruptions. The sequencing method can be easily implemented into an existing just-in-time system. In addition, the mathematical model was formulated and the algorithm was explained through the flow chart. The numerical example was given and the efficiency of this method is shown through the analysis of computational results of that example.

  • PDF

Nanostructure Ceramics of Silicon Nitride Produced by Spark Plasma Sintering

  • Hojo, Junichi;Hotta, Mikinori
    • Proceedings of the Korean Powder Metallurgy Institute Conference
    • /
    • 2006.09a
    • /
    • pp.323-324
    • /
    • 2006
  • The nanostructure control of $Si_3N_4$ ceramics can be achieved by using fine starting powder and retardation of grain growth. The spark plasma sintering technique is useful to retard the grain growth by rapid heating. In the present work, the change of microstructure was investigated with emphasis on the particle size of starting powder, the amount of sintering additive and the heating schedule. The rapid heating by spark plasma sintering gave the fine microstructure consisting of equiaxed grains with the same size as starting particles. The spark plasma sintering of $Si_3N_4$ fine powder was effective to control the microstrucutre on nano-meter level.

  • PDF

A JIT Production Scheduling in Multi-Level Parallel Machine Flow Shops (다단계 병렬기계(多段階 竝列機械) 흐름생산에서 JIT 일정계획)

  • Yoo, Chul-Soo;Lee, Young-Woo;Chung, Nam-Kee
    • IE interfaces
    • /
    • v.7 no.3
    • /
    • pp.171-180
    • /
    • 1994
  • Defined is a Multi-level Parallel Machine Flow-Shop (MPMFS) which reflects some real world manufacturing situations. Just-In-Time (JIT) philosophy is applied to the MPMFS scheduling in order to achieve lowering work-in-process inventory level as well as meeting due dates. A schedule generating simulator is developed. The latest start time of each operation is determined by a backward simulation followed by another forward simulation to analyze the schedule feasibility and actual inventory level. Reasonable schedules are available through adjusting some parameters for allowance factors such as set-up times of machines and other environmental changes. The SLAMSYSTEM under Window is employed for this processing with some input/output data handling processes devised under DOS.

  • PDF

Integrated Planning Process Implementation Method Based on the Cost, Schedule, and Technical Performance (비용, 일정 및 기술적 성과를 고려한 통합 계획수립 프로세스 구현 방안)

  • You, Yi-Ju;Park, Young-Won
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.10 no.3
    • /
    • pp.100-108
    • /
    • 2007
  • The purpose of the research is to propose an integrated project planning process and its implementation method. Although there is increasing interest in the application of the Earned Value Management(EVM) method in the project management area, the progress and maturity of the technical performance have not been included in assessing the Earned Value. The main concept of the planning process is to use cost, schedule, as well as the technical performance in the assessment of the Earned Value Management for Military R&D project management practices. The resulting process can enhance the efficiency of the project work by eliminating the currently duplicated activities between traditional project planning process and the newly implemented Earned Value Management process and by shortening the early planning process duration of projects adopting EVM practices.