• Title/Summary/Keyword: work process analysis

검색결과 2,821건 처리시간 0.271초

상용차용 액셀 케이싱의 너트부 용접공정 자동화 시스템 개발 (Development about Welding-process Automatic System on the department of Axle Casing Nut for Commercial Vehicle)

  • 김재열;유신;오성민;장종훈
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 1996년도 추계학술대회 논문집
    • /
    • pp.810-814
    • /
    • 1996
  • The purpose of this exclusive welding-machine process using the welding Torch-rotation form is to develop a mechanism which can solve the problem of twisted welding wires and cables. The technique was developed by revising the torch position and smooth controlling of both the formal and reverse rotation. Some of the advantages of using the Torch-rotation form over the Work-rotation technique are the practical uses of increased work space and link work with the automation system of the plant. Using this welding machine process, It is possible to design a specific tool in order to solve the implemental problem. And I produced a control plate which can manipulate the progress of the entire process at the work place. Even if another kind of axle casing's welding work is used this process can be utilized if the fixed tip and work is produced and changed. The development if this exclusive welding-machine could reduce the manpower of skilled welding labor and after considerable analysis, this machine was found to increase productivity and better quality product in comparison to the handmade product.

  • PDF

조선소 판넬라인의 위험요인 분석 및 안전관리 Application 개발 (Analysis of the Risk Factors and Design of the Safety Management Application for the Panel Line in a Shipyard)

  • 오현수;장성록
    • 한국안전학회지
    • /
    • 제27권6호
    • /
    • pp.160-165
    • /
    • 2012
  • The process of panel line in the shipyard produce the panel of outside planking which is located the side and bottom of a ship. The stiffeners or plates are welded onto the plates in this process. In this study, the panel line was performed to work process analysis and was analyzed into the IDEF0(Integration Definition) model that is functional modeling methodology. Also the panel line was analyzed to find out the risk factor and expected accident/safety guide from each process. And then this outputs were applied to the IDEF0 model. The mobile application which is designed by ooCBD(Object-oriented Component Based Development) method is able to use the output data of the process analysis in the panel line. This mobile application could be used by employees and safety managers without regard for working location and time.

국내 의류상품개발과정에서 직종별 업무관여도 비교 - 테크니컬 디자인 업무 중심으로 - (Work Involvement Study of Each Job on Technical Design in Garment Development Process in South Korea)

  • 김보아;남윤자;이재일;윤미경
    • 한국의류산업학회지
    • /
    • 제18권5호
    • /
    • pp.658-667
    • /
    • 2016
  • The purpose of this study is 1) to research how practitioners in fashion industry in South Korea perceive concepts of Technical Design/Designer, 2) to compare and analyze issues at work by occupation, 3) to research specific works in garment development process, and 4) to compare and analyze work involvement by occupation, type of a company and etc, and 5) to propose the role of Technical Designers in apparel companies in South Korea. There were two methods to conduct this study, which were in-depth interview and survey. Both methods were conducted to designers, merchandisers, pattern makers, technical designers, and production coordinators. Frequency analysis, ANOVA, Duncan test, and Factor analysis were performed to get results by using SPSS 18.0 program. The results are following. There were 50 works during garment development process from the result of in-depth interview, and 6 factors were obtained from the result of Factor analysis, which were 'Works about Sample in Sample Development Process', 'Works about Product's Pattern and Size Spec', 'Works about Development of Garment's Design', 'Works about Planning of Product Development and Management of Product in Stock', 'Works about Production Process', and 'Preparation Works for Sample Development'. In conclusion, technical designer in apparel companies in South Korea should be in charge of works about sample in sample development process and decision making of product' size spec, which is included in works about product's pattern and size spec. Also, they should complete technical package after product is developed by designers.

공업화자재의 활용을 통한 공정합리화 (Building construction process improvement using prefabricated materia)

  • 윤유상;이형수;서상욱
    • 한국건설관리학회논문집
    • /
    • 제4권1호
    • /
    • pp.90-96
    • /
    • 2003
  • 도심지 건축공사가 증가하고 있는 우리나라에서 작업공간의 부족 및 자재의 적시공급에 대한 문제는 반드시 해결해야 할 과제이다. 이 중에서도 주택건설에 있어 가장 큰 비중을 차지하고 있는 아파트 시공의 경우, 초고층화로 골조공사의 중요성과 함께 친환경적 공법과 합리적 공정개선 및 원가절감을 구현할 새로운 공법이 요구되고 있다. 본 연구에서는 국내 건설현장의 사례조사를 통해 슬래브 거푸집공사와 마감공사의 프로세스에서 불필요한 요소를 최소화하고자 공업화 자재를 활용한 (골조-마감공사)통합공법을 제시한다 가치흐름분석기법(Value Stream Mapping)을 활용하여 기존 프로세스에서의 비 가치 창출작업을 가치창출작업에 통합시키거나 제거하여 슬래브 공사 내에서 공기 및 투입인력의 절감 가능성을 확인하고, 공기단축과 원가절감 효과를 측정하였다. 이와 같이 공업화 자재의 활용으로 현장작업에 따른 변이를 최소화하여 공정의 안정성 및 공정계획의 신뢰성을 확보 등 공정의 합리화를 구현하고자 한다.

계층분석방법을 이용한 IPv6 멀티네트워킹 표준화항목 우선순위 결정 (Setting Priorities on Standardization Work Items of IPv6 Multi-networking Using Analytical Hierarchy Process)

  • 우훈식
    • 산업경영시스템학회지
    • /
    • 제34권1호
    • /
    • pp.25-32
    • /
    • 2011
  • Under limited resources such as budgets and experts, it is essential to set promotion priorities for standardization work items on IPv6 (Internet Protocol version 6) multi-networking technologies. Opinions of domain experts are surveyed and analyzed utilizing a multi-criteria decision making tool, the Analytic Hierarchy Process (AHP). Weights of ten evaluation criteria are identified and applied to calculating importance degree of eight work items. According to descending order of importance degree, priorities of work items are determined. The processes and results of this study may provide not only an approach of setting promotion priorities for standardization work items but also a practical guide of implementing of a multi-criteria decision analysis.

A Framework of Function Analysis for the Construction Robotics Design

  • Yi, Chang-Yong;Park, Young-Jun;Park, Jin-Young;Park, Chan-Young;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.370-374
    • /
    • 2022
  • Construction is a labor-intensive industry that heavily relies on skilled construction workers. However, the aging of the workforce is rapidly growing, and the shortage of skilled workers is intensifying. The application of construction robotics technology can solve the problem of workforce shortage and guarantee construction productivity, safety, and quality improvement. This study presents a framework of the functional analysis for construction processes and work tasks that classifies and analyzes processes and work tasks for construction robotics design. The framework presents the functional analysis process, which analyzes workers' attributes and identifies functions of construction robotics.

  • PDF

Work Productivity Analysis of High-performance PC Slab Installation

  • Shin, Young-su;Cho, Kyuman;Cho, Chang-geun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-617
    • /
    • 2015
  • Demand is increasing for large, high-rise, and complex buildings, which is leading to advances in the development of high-performance structural systems. In this context, precast concrete (PC) technology has received a large amount of attention owing to its benefits in terms of schedule reduction, high quality, and easy installation. In addition, advanced methodologies that improve the PC performance by the addition of various materials have recently been reported. Research on analyzing the effects of such high-performance PC on the construction process and productivity is very limited. This makes it difficult for decision-makers to apply PC to particular projects. Thus, the aim of this research was to analyze the work productivity of the high-performance PC slab installation process by using a construction simulation tool to resolve critical issues. In this study, a real construction project that adopted PC slab installation work was analyzed, and a sensitivity analysis was performed to confirm the reliability of the analysis results.

  • PDF

적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 - (A Study on Prototype of Just In Time Production Management System)

  • 이규현;최인성
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

안전한 도로 공사구간 환경 구축에 필요한 기술의 우선순위 선정 (Prioritization of Potential Technology for Establishing a Safe Work Zone Environment)

  • 김진국;양충헌;윤덕근
    • 한국도로학회논문집
    • /
    • 제17권6호
    • /
    • pp.117-126
    • /
    • 2015
  • PURPOSES : This study prioritizes potential technology for establishing a safe work zone environment on roadways. We consider almost all conceivable technologies that enable mitigation of unexpected accidents for both road workers and drivers. METHODS : This study suggests a methodology to set the priority of potential technology for establishing a safe work zone environment by using the analytical hierarchy process (AHP). For this purpose, the AHP structure was first developed. Thereafter, a web-based survey was conducted to collect experts' opinions. Based on the survey results, weights associated with the relevant criteria of the developed structure were estimated. With the consistency index (CI) and consistency ratio (CR), we verified the estimated weights. In addition, a sensitivity analysis was performed to confirm whether the estimated weights were reliable. We finally proposed the priority for potential technology for establishing a safe work zone environment on roadways. RESULTS : In the first level, safety technology has the highest priority, and real-time information delivery for work zone, hazard warning for drivers, and temporal automated operation for traffic facilities were selected in the second level of hierarchy. CONCLUSIONS : The results imply that establishing the priority will be useful to establish a future road map for improving the work environment for road workers and drivers by employing appropriate protection facilities and developing safety systems.

플랜트 건설공사의 안전관리 정보시스템 개발 (Safety Management Information System in Plants Construction Work)

  • 박종근
    • 대한안전경영과학회지
    • /
    • 제14권4호
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.