• 제목/요약/키워드: wind power generator

검색결과 705건 처리시간 0.034초

풍력 터빈 모의 실험을 위한 가변 토오크 입력형 시뮬레이터 (A Wind Turbine Simulator with Variable Torque Input)

  • 정병창;송승호;노도환;김동용
    • 대한전기학회논문지:전기기기및에너지변환시스템부문B
    • /
    • 제51권8호
    • /
    • pp.467-474
    • /
    • 2002
  • In this paper, a wind power simulator is designed and implemented. To realize the torque of wind blade, a DC motor is used as a variable torque input device. An induction machine is used as a generator of which speed is controlled to maintain the optimal tip speed ratio during wind speed change. Input torque of system is controlled by armature current of DC motor and speed is controlled by generator control unit using field oriented control algorithm. Various control algorithms such as MPPT, soft start up, the simulator reactive power control, can be developed and tested using the simulator.

MATLAB&SIMULINK에서 변압기 결선에 따른 풍력발전 시스템의 영향 평가 (Evaluation on Effect of Wind Power Generation System According to Transformer Winding Connection at Matlab&Simulink)

  • 안해준;노경수
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.772-773
    • /
    • 2007
  • This study suggests a modeling of grid-connected wind power generation system that has induction generator, and aims to perform simulations for outputs by the variation of actual wind speed and for fault current of wind generation system by the transformer winding connection. This study is implemented by matlab&simulink. The simulation shall be performed by assuming single line to ground fault generated in the system. Generator power, rotor speed, terminal voltage, system voltage, and fault current shall be observed following the performance of simulation. The fault current change will be dealt through the simulation results for fault current of wind generation system following the grid-connected transformer winding connection and the simulation result by the transformer neutral ground method.

  • PDF

풍력발전단지가 연계된 전력계통에서 상정고장을 고려한 발전력 재조정에 관한 연구 (A Study on the Rescheduling of Generation Considering Contingency in Power System with Wind Farms)

  • 최수현;김규호
    • 전기학회논문지
    • /
    • 제66권2호
    • /
    • pp.255-260
    • /
    • 2017
  • This paper studies on effective rescheduling of generation when the single line contingency has occurred in power system with wind farm. The suggested method is formulated to minimize the rescheduling cost of conventional and wind generators to alleviate congestion. The generator rescheduling method has been used with incorporation of wind farms in the power system. Since all sensitivity is different about congestion line, Line Outage Distribution Factor(LODF) and Generator Sensitivity Factor(GSF) is used to alleviate congestion. The formulation have been proccessed using linear programming(LP) optimization techniques to alleviate transmission congestion. The effectiveness of the proposed rescheduling of generation method has been analyzed on revised IEEE 30-bus systems.

종축 자속형 영구자석 동기 발전기의 전자기적 구조 변경에 따른 출력특성 비교 (The Comparison of Output Characteristic by the Electro-magnetic Structure Modification of the Axial Flux Type Permanent Magnet Synchronous Generator)

  • 정태욱;배병덕;김회천
    • 조명전기설비학회논문지
    • /
    • 제25권6호
    • /
    • pp.42-48
    • /
    • 2011
  • Generally, the structure without the stator core Axial Field Permanent Magnet (AFPM) generator was simple and there was nearly no cogging toque. And because it had the wide driving rate area, it had been being mainly used in the small wind power generation system. However, AFPM generator with non-slotted stator can't generate high voltage at low wind speed due to long air-gap. It is the reason of output efficiency drop. Therefore, in this paper, the AFPM synchronous generator with internal rotor and dual slotted stators for the small wind turbine is studied, and deal with a cogging torque minimization through the determination of optimum pole-arc ratio.

PI-CCC Based Switched Reluctance Generator Applications for Wind Power Generation Using MATLAB/SIMULINK

  • Kaliyappan, Kannan;Padmanabhan, Sutha
    • Journal of Electrical Engineering and Technology
    • /
    • 제8권2호
    • /
    • pp.230-237
    • /
    • 2013
  • This paper presents a novel nonlinear model of Switched Reluctance Generator (SRG) based on wind Energy Conversion system. Closed loop control with based Proportional Integrator current Chopping Control machine model is used. A Power converter in SRG can be controlled by using PI-CCC proposed model, and can be produced maximum power efficiency and minimize the ripple contents in the output of SRG. A second power converter namely PI based controlled PWM Inverter is used to interface the machine to the Grid. An effective control technique for the inverter, based on the pulse width modulation (PWM) scheme, has been developed to make the line voltage needs less power switching devices and each pair of turbine the generated active power starts increasing smoothly. This proposed control scheme feasibility and validity are simulated on SIMULINK/SIM POWER SYSTEMS only.

가정용 태양광/풍력 Hybrid 발전시스템의 모니터링에 관한 연구 (A Study on Monitoring for based-Photovoltaic/Wind power Hybrid Generation System)

  • 정병영;차인수;임중열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.365-368
    • /
    • 2006
  • The objective of this research is to investigate usage of 3KW photovoltaic-wind power hybrid generation system composed of 500W solar power generator and 400W wind power generator in a parallel circuit. In addition, solar radiation meter and wind monitor have been installed into each generation system to obtain the practical operating data that monitored in monthly, daily and hourly. These data that are independent to weather change and location would provide adequate generation output on average and cope with emergency situation in generation system In conclusion, based on this study, it could be considered for 3KW combined generation system to be gradually propagated to houses and small-size public facilities.

  • PDF

풍력기반의 하이브리드 발전시스템의 실증연구 (The Demonstration Research on Hybrid Power Generation System Based on Wind Power)

  • 안재영;이화춘;송성근;이상훈;조수억;박성준;김광헌
    • 조명전기설비학회논문지
    • /
    • 제24권10호
    • /
    • pp.106-113
    • /
    • 2010
  • In this paper, the empirical study for a hybrid generation system based on wind power which is leading renewable energy was performed. The simulation for the overall operation of the wind generator, diesel generators, monitoring system and a central controller operated in Demonstration Complex was carried out. In addition, the adequacy of the control algorithm was examined through the experiments.

가변 풍력시스탬의 시뮬레이션 (Simulation of Variable Wind Energy System)

  • 김재곤;구자봉;허욱열
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 D
    • /
    • pp.2268-2270
    • /
    • 2003
  • In this paper, mathematically modeled equations were derived for wind turbine under the analysis of aerodynamics. On the basis of these equations, maximum power controller is implemented by simulink in matlab. In order to achieving maximum power, variable speed control method is used for obtaining maximum power coefficient in the variable wind speed because we can have maximum changing efficiency in these coefficients. Also, the maximum power control of wind generator system uses a synchronous generator and a invertor circuit.

  • PDF

배전선로 전압강하에 대한 이중 여자 풍력발전시스템 특성 해석 (Analysis of doubly-fed induction generator based wind power system for voltage sag)

  • 차한주;이상회
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.1234-1235
    • /
    • 2007
  • This paper represents the generating principles of the doubly-fed induction generator (DFIG) based wind power system and developes a simulation model of DFIG by using PSCAD/EMTDC. In addition, this paper analyzes the steady state operation and the transient operation during the voltage sags in the power common coupling. The voltage sags are occurred by three phase line-to-ground faults and full-voltage startup of an induction motor in the simulation.

  • PDF

발전용량 및 풍속에 따른 국내 풍력 발전단지의 효율성 분석 (The Effect of Power Generation Capacity and Wind Speed on the Efficiency of the Korean Wind Farms)

  • 이중우;고광근;이기광
    • 경영과학
    • /
    • 제30권2호
    • /
    • pp.97-106
    • /
    • 2013
  • Of the new and renewable energies currently being pursued domestically, wind energy, together with solar photovoltaic energy, is a new core growth driver industry of Korea. As of May 2012, 33 wind farms at a capacity of 347.8MW are in operation domestically. The purpose of this study was to compare and analyze how efficiently each operational wind farm is utilizing its power generation capacity and the weather resource of wind. For this purpose, the study proceeded in 3 phases. In phase 1, ANOVA analysis was performed for each wind farm, thereby categorizing farms according to capacity, region, generator manufacturer, and quantity of weather resources available and comparing and analyzing the differences among their operating efficiency. In phase 2, for comparative analysis of the operating efficiency of each farm, Data Envelopment Analysis (DEA) was used to calculate the efficiency index of individual farms. In the final phase, phase 3, regression analysis was used to analyze the effects of weather resources and the operating efficiency of the wind farm on the power generation per unit equipment. Results shows that for wind power generation, only a few farms had relatively high levels of operating efficiency, with most having low efficiency. Regression analysis showed that for wind farms, a 1 hour increase in wind speeds of at least 3m/s resulted in an average increase of 0.0000045MWh in power generation per 1MW generator equipment capacity, and a unit increase in the efficiency scale was found to result in approximately 0.20MWh power generation improvement per unit equipment.