• 제목/요약/키워드: wind farm

검색결과 519건 처리시간 0.029초

다공 원반 CFD 모델을 이용한 풍력발전기 후류 해석 연구 (Wind Turbine Wake Model by Porous Disk CFD Model)

  • 신형기;장문석;방형준;김수현
    • 풍력에너지저널
    • /
    • 제4권1호
    • /
    • pp.68-74
    • /
    • 2013
  • Offshore wind farm is being increased since there are much trouble to develop onshore wind farm. But in the offshore, wind turbine wake does not dissipate less than onshore wind turbine because of low turbulence level. Thus this remained wake interacted to other wind turbine. This interaction reduces energy production in wind farm and have a bad influence on fatigue load of wind turbine. In this research, CFD model was constructed to analyze wake effect in offshore wind farm. A method that wind turbine rotor region was modelled in porous media was devised to reduce computation load and validated by comparison with Horns Rev measurement. Then wake interaction between two wind turbine was analyzed by devised porous model.

풍력-기상자원지도에 기반한 제주 행원 풍력발전단지 효율성 평가 (Evaluation of Wind Turbine Efficiency of Haengwon Wind Farm in Jeju Island based on Korean Wind Map)

  • 변재영;강미선;정현숙
    • 한국지구과학회지
    • /
    • 제34권7호
    • /
    • pp.633-644
    • /
    • 2013
  • 풍력 발전단지의 효율성 평가를 위하여 풍력-기상자원지도로부터 이론적 잠재량을 계산하고 행원 발전단지 발전량과 비교하였다. 풍력-기상자원지도는 기상청 국립기상연구소에서 개발된 1 km 해상도 자료를 이용하였다. 풍력-기상자원지도와 AWS(구좌) 풍속의 비교 검증 결과는 풍속이 과대 모의되었으며, 행원 발전단지 풍속의 일 변동성은 해륙풍의 영향으로 오후에 최대가 되는 일 변동 특성을 보였다. 풍력-기상자원지도로부터 산출된 발전량과 행원 발전단지 발전량의 비율은 24.8%이나, 발전량 빈도수 분포 형태는 유사하였다. 발전량 차이의 원인은 터빈의 기계적 오류, 풍력-기상자원지도 풍속의 과대 모의에 기인한 것으로 생각된다. 본 연구는 향후의 발전단지 효율성 증가를 위한 터빈의 재배치에 기여 할 것이다.

측정-상관-예측법을 이용한 장기간 풍속 및 설비이용률의 예측 (Prediction of long-term wind speed and capacity factor using Measure-Correlate-Predict method)

  • 고경남;허종철
    • 한국태양에너지학회 논문집
    • /
    • 제32권6호
    • /
    • pp.37-43
    • /
    • 2012
  • Long-term variations in wind speed and capacity factor(CF) on Seongsan wind farm of Jeju Island, South Korea were derived statistically. The selected areas for this study were Subji, having a year wind data at 30m above ground level, Sinsan, having 30-year wind data at 10m above ground level and Seongsan wind farm, where long-term CF was predicted. The Measure-Correlate-Predict module of WindPRO was used to predict long-tem wind characteristics at Seongsan wind farm. Eachyear's CF was derived from the estimated 30-year time series wind data by running WAsP module. As a result, for the 30-year CFs, Seongsan wind farm was estimated to have 8.3% for the coefficien to fvariation, CV, and-16.5% ~ 13.2% for the range of variation, RV. It was predicted that the annual CF at Seongsan wind farm varied within about ${\pm}4%$.

국내 해상풍력 발전단지 입지 분석 연구 (Study of the Spatial Location Analysis for Domestic Offshore Wind Farm)

  • 김동휘;이용준;류인호;서대림
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.504-511
    • /
    • 2010
  • After facing the fact such as fossil-fuel depletion, global warming, the Kyoto Protocol coming into force of mandatory reductions of carbon dioxide, the world is actively promoting the spread of the solar, wind, tidal, geothermal and other clean renewable energy technology development. Among them, wind power is the only alternative energy to secure a comparable price competition with fossil fuels because cheaper price power generation than other renewable energy when creating large-scale wind farm, thus wind power is the fastest growing industries in the world in the renewable energy field. Especially the offshore wind power is showing rapid growth as most of the wind power sector because of less changes of wind speed, no restrictions of land use, and large-scale development of offshore wind power. In this paper, the field of site selection and spatial location analysis techniques for development of large-scale offshore wind farm are discussed primarily. This paper shows overview of offshore wind power and establishment procedure for development of offshore wind farm.

  • PDF

행원 풍력발전단지에서 풍력발전시스템의 운전특성 (Operational Characteristics of Wind Turbine Generator Systems in Hangwon Wind Farm)

  • 고경남;강문종;허종철
    • 한국태양에너지학회 논문집
    • /
    • 제27권1호
    • /
    • pp.1-9
    • /
    • 2007
  • This paper reveals both the operational situation and the cause of the error occurred in wind turbine generator system of Hangwon wind farm in Jeju island. The four wind turbines were selected for this work, and the monitored period was for six months. Wind resource in the wind farm was analyzed, and the estimated energy production was compared with the actual energy production. As a result, with a decrease of system error, the estimated energy production was in good agreement with the actual energy production. The errors occurring in components such as gearbox and hydraulic motor affected the Availability of the wind turbine. Also, poor external conditions such as a strong wind, lightning and gust caused a standstill of wind turbines.

이중 여자 비동기 발전기를 포함한 풍력단지 시모의 해석 (Time Domain Simulation Analysis For Wind Farm with DFAG)

  • 조성구;송화창;이장호
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 추계학술대회 논문집
    • /
    • pp.439-442
    • /
    • 2009
  • As a result of increasing environmental concern, the penetration of renewable power on power systems is now increasing. Wind energy can be considered as the most economical energy sources to generate electricity without depletion of fossil fuel. The penetration of wind energy from wind farm is getting larger and larger, so we need adequate control strategies for wind farm. To devise adequate control strategies for wind farm, time domain simulation analysis needs to be performed. This presents a Simultaneous Implicit-based time domain simulation algorithm for wind farm with DFAG (Doubly Fed Asynchronous generator) connected to the external power systems. This paper shows an illustrative example with a 5-bus test system.

  • PDF

후류 영향 최적화 기반 실시간 풍력발전단지 발전 제어용 EMS의 설계 및 구현 (Design and Implementation of EMS for Real-Time Power Generation Control of Wind Farm Based on Wake Effect Optimization)

  • 김준형;성기원;정성환
    • 한국멀티미디어학회논문지
    • /
    • 제25권8호
    • /
    • pp.1097-1108
    • /
    • 2022
  • This paper aimed to design and implement an EMS for real-time power generation control based on wake effect optimization of wind farm, and then to test it in commercial operating wind farm. For real-time control, we proposed the wake band-based optimization and setting the wake effect distance limit, and when the wake effect distance limit was set to 7D in the actual wind farm layout, the calculation time was improved by about 93.94%. In addition, we designed and implemented the script-based EMS for flexible operation logic management in preparation for unexpected issues during testing, and it was installed and tested on a wind farm in commercial operation. However, three issues arose during the testing process. These are the communication interface problem of meteorological tower, the problem of an abnormal wake effect, and the problem of wind turbine yaw control. These issues were solved by modifying the operation logic using EMS's script editor, and the test was successfully completed in the wind farm in commercial operation.

CFD를 활용한 6 MW 해상풍력발전단지의 풍력터빈 이격거리에 따른 공기역학적 출력 변화연구 (CFD Study on Aerodynamic Power Output of 6 MW Offshore Wind Farm According to the Wind Turbine Separation Distance)

  • 최낙준;남상현;정종현;김경천
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권8호
    • /
    • pp.1063-1069
    • /
    • 2011
  • 본 논문은 2 MW급 풍력터빈 3기로 구성된 6 MW 해상풍력발전단지의 풍력터빈 이격거리에 따른 공기역학적 출력 변화를 전산유동해석을 활용하여 연구한 것이다. 육상 뿐만 아니라 해상풍력발전단지에 있어서 레이아웃 설계는 풍력발전단지 초기 투자비, 년간 발전량 및 유지보수비에 영향을 끼치는 핵심 인자이다. 각 풍력터빈 로터에 대해서 모멘텀 소스를 가지는 액츄에이터 디스크가 아닌 완전한 3-D 모델에 대해서 전산유동해석 기법을 적용하여 연구하였으며 이는 기술적으로 큰 의미를 가진다. 본 논문의 연구결과는 향후 해상풍력발전단지 레이아웃 설계에 유용하게 적용될 수 있을 것이다.

풍력터빈 성능 검증을 위한 출력측정 유효영역 선정 (Selection of Available Sector to Measure Power Generation for Validation of Wind Turbine Performance)

  • 오기용;정훈;이준신
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2009년도 춘계학술대회 논문집
    • /
    • pp.525-528
    • /
    • 2009
  • Power generation of wind turbine which is installed in wind farm should be measured to predict economic feasibility of wind farm. Also electric power company want to verify wind turbine performance which is stated by manufacturer. The International Electrotechnical Commission(IEC) published 61400-12-1 "Power performance measurements of electricity producing wind turbines" for test of wind turbine power performance. In this paper, measurable sector of wind speed is analysed based on IEC 61400-12-1 to verify power curve of wind turbine with various wind turbine in wind farm.

  • PDF

전남지역 남해안 풍력자원조사 연구 (Analysis of Wind Resources of the South Seashore of JeonNam Province)

  • 김영찬;정진화;이응채;전중환;한경섭;김용환
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2006년도 추계학술대회
    • /
    • pp.281-285
    • /
    • 2006
  • As the needs of wind energy increase, the more sites for the wind farm are required. As a part of searching for the prominent wind farm site, specially for offshore wind farm, we chose 4 sites along the southern part seashore of JeonNam province based on the analysis of the data gathered by meteorological observatory ud have gathered wind data for more than a year by use of 40m Met masts installed in the representative locations, ie. small islands of 4 different bay area. The siting for the Met masts were very limited by the geographical circumstances The wind data of those areas show a little lower annual average wind speeds, for the wind farm development, of 4m/s to 5.5m/s at the height of 40m above the ground level of the respective islands. The detail figures of one year wind data of those area are presented in this report.

  • PDF