• Title/Summary/Keyword: water supply pipeline

Search Result 93, Processing Time 0.029 seconds

Control Method of Habitat Density of Limnoperna fortunei in the Enclosed Facility of Water Supply Pipeline (폐쇄공간 송수관로내 민물담치의 서식밀도 조절방법)

  • Shin, Jae-Ki;Chong, Sun-A;Noh, Joonwoo;Kim, Youngsung;Hwang, Soon-Jin
    • Korean Journal of Ecology and Environment
    • /
    • v.47 no.3
    • /
    • pp.219-224
    • /
    • 2014
  • This study was conduct to the reduction and elimination of Limnoperna fortunei that problem in the facilities and water supply pipeline is done to review proposals for the controls. In order to effectively removal the larva and the adult of that, chlorination and being used to an existing method is to be commended. The water temperature of Limnoperna fortunei spawning season was ranged 16 to $17^{\circ}C$ during May to early November. A chlorination of this period is appropriate in order to control a larva. However, existing in the attached young and old shell at the same time consistently been deemed to apply, because it must be taken into account. The range of concentration of chlorination to control the biomass for Limnoperna fortunei was from 0.5 to 1.0 ppm. Proliferation attached to the mitigation or appropriate technology to solve the domestic situation the priorities of the choice of a more urgent. Also, the monitoring of water temperature and larva will constantly to be done. And development of larva monitoring method as well as after chlorine treatment is effective analysis needed. Finally, we are expecting to good use in validating the results presented in this study.

Design Value Analysis and LCC Analysis Model of Water Supply System Project (수도시설의 설계VA 및 LCC 분석모델)

  • Lim Jong-Kwon;Jung Pyung-Ki;Seo Jong-Won;Lee Jae-Sun;Cho Kook-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.469-472
    • /
    • 2003
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a life cycle cost analysis model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

  • PDF

A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project (확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구)

  • Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.181-193
    • /
    • 2004
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a probabilistic life cycle cost analysis (PLCCA) model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented probabilistic life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

A Study on the Method of Energy Evaluation in Water Supply Networks (상수관망의 에너지 평가기법에 관한 연구)

  • Kim, Seong-Won;Kim, Dohwan;Choi, Doo Yong;Kim, Juhwan
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.7
    • /
    • pp.745-754
    • /
    • 2013
  • The systematic analysis and evaluation of required energy in the processes of drinking water production and supply have attracted considerable interest considering the need to overcome electricity shortage and control greenhouse gas emissions. On the basis of a review of existing research results, a practical method is developed in this study for evaluating energy in water supply networks. The proposed method can be applied to real water supply systems. A model based on the proposed method is developed by combining the hydraulic analysis results that are obtained using the EPANET2 software with a mathematical energy model on the MATLAB platform. It is suggested that performance indicators can evaluate the inherent efficiency of water supply facilities as well as their operational efficiency depending on the pipeline layout, pipe condition, and leakage level. The developed model is validated by applying it to virtual and real water supply systems. It is expected that the management of electric power demand on the peak time of water supply and the planning of an energy-efficient water supply system can be effectively achieved by the optimal management of energy by the proposed method in this study.

Experimental Study on Performance Characteristics of High Speed Air Valve for Water Works (급수용 급속공기밸브의 성능특성에 관한 실험적 연구)

  • Lee, Sun Kon;Kaong, Sae Ho;Yang, Cheol Soo;Woo, Chang Ki
    • Journal of the Korean Society of Safety
    • /
    • v.29 no.5
    • /
    • pp.1-6
    • /
    • 2014
  • When the fluid energy convert into kinetic energy due to water hammer, the propagation velocity of pressure wave appear. The propagation velocity of pressure wave(1050 m/s) of very fast could be damage to the pipeline system. If the occurrence of water hammer is due to down-pressure, the faster the air exhaust or supply device is needed. it is high Speed Air Valve. In this paper, Each 3.12, 3.13, 3.72, $3.74kg/cm^2$ pipeline pressure were setting, and then executed pressure rapid drop for obtaining a high Speed Air Valve Operating time and pressure change data. the result was that pipe line pressure stabilization time were each 0.98, 1, 1.22, 1.25 sec. In other words, that pressure drop experimental results pipe line pressure was equal to atmospheric pressure without negative pressure After about one second. The study result would be useful to pipe line system stability design because this data could be foresee pressure stabilization time.

The Seismic Design of Water Extinguishing Piping Systems for Equivalent Static Analysis Method (등가정적해석법에 의한 수계 파이프 시스템의 내진설계)

  • Lee, Dong-Myung
    • Fire Science and Engineering
    • /
    • v.26 no.3
    • /
    • pp.100-105
    • /
    • 2012
  • In this study, seismic design in pipeline of pressurized water supply system of water extinguishing system has been carried out. This study described a generation of artificial earthquake wave compatible with seismic design spectrum, and also determined equivalent static loads to analyzed the response spectra acceleration by the simulated earthquake motion. This study constructed powerful engineering base for seismic design, and presented equivalent static analysis method for seismic design of water and gas extinguishing piping system. Also, this study readied basis that can apply seismic design and performance estimation of fire fighting system as well as pipeline of water extinguishing system from result of this research. Hereafter, if additional research by earthquake magnitude and ground kind is approached, reliance elevation, safety raising and performance based design of fire fighting system see to achieve.

Failure Analysis of Air Vent Connected with Heat Supply Pipeline Under Manhole (맨홀에 설치된 지역난방 열공급관 에어벤트의 전단부 파손 원인 규명)

  • Cho, Jeongmin;Chae, Hobyung;Kim, Heesan;Kim, Jung-Gu;Kim, Woo Cheol;Jeong, Joon Cheol;Lee, Soo Yeol
    • Corrosion Science and Technology
    • /
    • v.19 no.4
    • /
    • pp.196-202
    • /
    • 2020
  • The air vent connected to a heat supply pipeline in the district heating system has been used to eliminate the existing air in the pipe, which has a detrimental effect on corrosion durability and heat efficiency. Recently, the air vent installed under a manhole for 22 years was corroded and several pinholes were detected in the front-end of the air vent. To identify the cause of the failure, thickness reduction, corrosion products, and water quality were examined. The corrosion damage was significant at the outside of the front-end of the air vent where the insulator was covered. While a thin oxide layer was formed in the interior of the tube, the coarse and porous corrosion products consisting of magnetite and hematite were found externally. Water flowing into the thermal insulator was absorbed by the insulator following hydrolysis. The hydrolyzed insulator ejected the corrosion factors such as Cl-, SO42-, and NH4+. The findings suggest that the corrosion under insulation due to rain water is the main cause of the underlying failure in the air vent.

Economic-based approach for predicting optimal water pipe renewal period based on risk and failure rate

  • Kim, Kibum;Seo, Jeewon;Hyung, Jinseok;Kim, Taehyeon;Kim, Jaehag;Koo, Jayong
    • Environmental Engineering Research
    • /
    • v.24 no.1
    • /
    • pp.63-73
    • /
    • 2019
  • This study suggests a method for calculating the benefits of water pipe renewal based on an estimate of the water supply suspension risk. The proposed method based on five benefit items is more direct and specific than other benefit estimation methods. In addition, a methodology evaluating the economics of pipe renewal based on pipe failure rate is proposed for estimating the optimal renewal point from an economic perspective. By estimating the optimal renewal period based on a yearly benefit cost ratio per pipe in a case study area, it was possible to draft an optimal renewal plan for the subject region from an economic perspective. Compared with other methodologies, a reasonable optimal renewal period was derived from an economic point of view. The result of this study may be used to develop future water pipe renewal plans. Moreover, the proposed methodologies and results derived from this study can be applied to asset management plans.

Influences of pH on Heavy Metal Leaching in Water Supply Pipelines (상수도관내 중금속 용출에 대한 수소이온농도의 영향 평가 연구)

  • Lee, Jeongwon;Noh, Yoorae;Park, Joonhong
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.73-82
    • /
    • 2017
  • In Korea, previous certification of water supply infrastructure was mainly focused on economical and physical aspects. Recently, hygienic safety of water supply service has become a sensitive and important issue to our people for evaluating the water quality with growth of economy and education system. According on water quality in 497 Korean water supply facilities, pH values in the supplied water have ranged between 5.8-8.5. However, little is known about metal leachability at the pH conditions observed in the real water supply systems because a fixed pH condition (pH 7.0) has been used in the current standard method, 'Hygienic Safety Testing Method', in water supply. In this work, we examined the effects on heavy metal leachability with pH differences in the water supply pipes which are typically used in Korea. As a result, the amounts of metal leachability were tended to increase when pH levels were decreased. Especially at pH 5.8, Cu leachability from Cu pipes was found to exceed the public health standard level even after applying a normalization factor (NF) given by the current Korea standard method. The Cr and Cu leached from stainless steel pipes, Cd, Pb, Cu, and Zn from Cu-based pipe fittings, and Zn from Zn-based pipe fittings were exceeded the Korean hygienic safety standards while, after applying the NF, concentrations of the leached metals were satisfied with the current Korean standard. The findings from this work provide implications on the needs of reforming the current hygienic safety standard methodology.

Study on the Physical Characteristics of Water Supply Steel Pipe according to Temperature Change (수도용 강관의 온도변화에 따른 물리적 특성에 대한 연구)

  • Kim, Woo-young;Jang, Am
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.12
    • /
    • pp.733-740
    • /
    • 2017
  • 'The facilities standards of water supply' issued by the Ministry of Environment in 2004 indicates that expansion joints cannot be used in welding water supply steel pipes. However, their reason is not clear and it is difficult to confirm the stability of the steel pipe for a water supply pipeline. The purpose of this study is to determine whether or not an expansion joint is necessary to improve the stability of water supply in steel pipe through a displacement analysis of the pipework. The test results are as follows. Firstly, it was found that expansion and contraction of the water supply steel pipe (D 2,400 mm) occur repeatedly in 4 cycles per year, and the maximum expansion and contraction amount of the pipe is 13.03 mm in 1.24 km pipelines. Secondly, the thermal stress caused by expansion and contraction of the steel pipe is $13.7{\sim}36.1kgf/cm^2$ according to the burial depth (0~4 m). The main comparison factors to determine the stability of the steel pipe (STWW 400) were the allowable tensile strength and the fatigue limit, which were computed to be $4,100kgf/cm^2$ and $1,840kgf/cm^2$, respectively. Finally, the thermal stress of the steel pipe is very small compared to the allowable tensile stress and fatigue stress. Therefore, thermal stress does not affect the stability of the steel pipe, although the expansion and contraction of the steel pipe occurs by temperature changes. In conclusion, the study demonstrated that expansion joints are not required in water supply steel pipelines.