Proceedings of the Korea Water Resources Association Conference
/
2009.05a
/
pp.1612-1615
/
2009
Water supply reliability indexes (WSRI) is estimated for assessment of water supply capacity in the downstream for parallel reservoir system in Nakdong River, South Korea, using allocation rule (AR) according to the water supply capacity of each reservoir and the characteristic of parallel reservoir system. The result of the analyzing parallel reservoir system for Andong and Imha reservoir in Nakdong River does not include evidences available enough to decide whether the results of water supply analysis are excellent in the current reliability evaluation or not. However, AR (C) shows a good result in the water supply capacity for each reservoir based on the connected operation system and the total water supply capacity at the control point of downstream by the average water supply capacity and possible range of water supply capacity suggested by this study. The average water supply capacity is analyzed by the reliability of monthly average water supply capacity. Furthermore, the possible range of water supply capacity is estimated by the standard deviation when water deficit occurs. Therefore, AR (C) is useful to establish and estimate the planning water supply capacity according to the monthly water supply condition and the possible range of water supply capacity when the water supply capacity deficit occurs, South Korea.
In general, the evaluation of water supply capacity is important factor to establish various establishment of water resource supply plan include water resource security and determination of dam's mass. But former researchs about estimation of water supply capacity were lack in continunity of evaluation basis, and didn't excute analysis on reliability criteria also. In this study, Nakdong river was selected for study basin, and then water supply capacity was analyzed by HEC-5 model using identical reliability criteria.
In this study analyzed the reliability indices against the water supply ability of Andong dam. The water supply analysis of Andong dam used the HEC-5 model. So Andong dam simulated planed water-supply capacity of Andong dam as increase and decrease +5% ~ -5% of water supply quantity. Water-supply capacity of Andong dam estimated, deficit occurrence, deficit quantity, deficit period. As the results estimated reliability(occurrence based, time based, quantity based) and resiliency vulnerability and with water supply capacity evaluation indices of Andong dam. Also reliability(occurrence based, time based, quantity based), resiliency, vulnerability and resiliency indices are estimated to evaluated the performance of water supply on Andong dam, and their relationships are evaluated.
Kim, Jin Soo;Lee, Jae Yong;Lee, Jeong Beom;Song, Chul Min;Park, Ji Sung
Journal of The Korean Society of Agricultural Engineers
/
v.58
no.2
/
pp.65-71
/
2016
The new concept of agricultural water supply potential, which is mean annual turnover rate times unit storage capacity, was introduced for agricultural reservoirs. We investigated characteristics of mean annual turnover rate and unit storage capacity for agricultural reservoirs with storage capacity of over $1million\;m^3$. The curve of agricultural water supply potential represents change in mean annul turnover rate according to change in unit storage capacity. The mean annual turnover rate and unit storage capacity in the reservoirs with high minimum storage ratio are significantly higher than those in the reservoirs with low minimum storage ratio. Most of unstable water supply reservoirs showed low mean annual turnover rate or low unit storage capacity, indicating that mean annual turnover rate may be an index of stability degree for agricultural water use. The reservoirs with mean annual turnover rate of over 2 and unit storage capacity of over 0.8 m may be estimated as the stable water supply zone for 10 frequency dry year. The reservoirs with high agricultural water supply potential can belong to the wide range of stable water supply zone. The results suggest that relation between mean annual turnover rate and unit storage capacity may be used in evaluating stability degree for agricultural water supply in the reservoirs.
This study aims at the effective estimation of water supply capacity of small scale reservoir and the proposal of the data which is necessary to establish the water resources management plan of down stream area of the reservoir in the future by comparison and examination about reservoir operation technique for the security of agricultural water in small scale reservoir. The result of flow calculation by Tank model is used for the input data as the inflow data which is needed for the analysis of water supply capacity. Stochastic method, simulation method, and optimization method are used to examine the water supply capacity, and water security amount is compared with each method. From the analyses of water supply capacities by each method, slightly different results are shown in spite of the effort to compare them equally using input data such as inflow data under equal conditions, and the comparison of water supply capacities by each method are as follows; linear planning method, simulation method, and transition probability matrix method in the order of amount from the largest. It is thought that the simulation method in which comparatively reasonable application of the inflow data is possible and is simulated in successive time series dam operation of the three methods used in this study thus, simulation model is proper to estimate the water supply capacity of agricultural small scale reservoir. And it is judged that the heightening of efficiency of water resources utilization according to the development of downstream area of dam may be possible using the upward readjusted water supply amount of $55.18{\tiems}10^6ton$ and $63.7{\times}10^6ton$ at 95% and 90% supply reliability respectively which are above the planning water supply amount of $50.0{\times}10^6$ton when the simulation method is introduced as the standard.
Journal of The Korean Society of Agricultural Engineers
/
v.54
no.6
/
pp.39-44
/
2012
Water supply capacity and operational capability in agricultural reservoirs are expressed differently in the limited storage due to seasonal and local variation of precipitation. Since agricultural water supply and demand basically assumes the uncertainty of hydrological phenomena, it is necessary to improve probabilistic approach for potential risk assessment of water supply capacity in reservoir for enhanced operational storage management. Here, it was introduced the irrigation vulnerability characteristic curves to represent the water supply capacity corresponding to probability distribution of the water demand from the paddy field and water supply in agricultural reservoir. Irrigation vulnerability probability was formulated using reliability analysis method based on water supply and demand probability distribution. The lower duration of irrigation vulnerability probability defined as the time period requiring intensive water management, and it will be considered to assessment tools as a risk mitigated water supply planning in decision making with a limited reservoir storage.
Korean Journal of Air-Conditioning and Refrigeration Engineering
/
v.18
no.10
/
pp.768-775
/
2006
The water supply system has been designing by decision process such as calculation of water supply amount, capacity of water tanks and pumps, pipe size. Especially, when we estimate excessively water supply amount, the initial cost and running cost will increase according to enlargement of the water tank and pump capacity, and water quality of ground water tank can become worse. Therefore, calculation of water supply amount is basically most important factor. In order to calculate exactly water supply amount applying domestic real situation, we should set up basic data as well as study calculation methods. This research would consider calculation methods of water supply amount for school building through examine domestic and foreign basic data of water supply amount and characteristics of domestic school, and estimate daily water supply in high school.
Journal of The Korean Society of Agricultural Engineers
/
v.57
no.4
/
pp.73-84
/
2015
An embankment raising project on 113 agricultural reservoirs in Korea was implemented in 2009 to increase water supply capacity for agricultural water and instream uses. This study evaluated the future water supply capacity of the Imgo reservoir at which the agricultural reservoir embankment raising project was completed, considering climate change scenarios. The height of the embankment of the reservoir was increased by 4.5 m, thereby increasing its total storage from 1,657.0 thousand to 3,179.5 thousand cubic meters. To simulate the reservoir water storage with respect to climate changes, two climate change scenarios, namely, RCP 4.5 and RCP 8.5 (in which greenhouse gas reduction policy was executed and not executed, respectively) were applied with bias correction for reflecting the climate characteristics of the target basin. The analysis result of the agricultural water supply capacity in the future, after the agricultural reservoir embankment raising project is implemented, revealed that the water supply reliability and the agricultural water supply increased, regardless of the climate change scenarios. By simulating the reservoir water storage considering the instream flow post completion of the embankment raising project, it was found that water shortage in the reservoir in the future is not likely to occur when it is supplied with an appropriate instream flow. The range of instream flow tends to decrease over time under RCP 8.5, in which the greenhouse gas reduction policy was not executed, and the restoration of reservoir storage was lower in this scenario than in RCP 4.5, in which greenhouse gas reduction policy was executed.
Yu, Ji Soo;Shin, Ji Yae;Kwon, Minsung;Kim, Tea-Woong
KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.1
/
pp.231-238
/
2017
Water supply safety index plays an important role on assessing the water supply capacity of hydrologic system. Due to the absence of consistent guidance, however, practical problems have been brought up on data period used for dam design and performance evaluation. Therefore, this study employed bivariate drought frequency analysis which is able to consider drought severity and duration simultaneously, in order to evaluate water supply capacity of multi-purpose dams. Drought characteristics were analyzed based on the probabilistic approach, and water supply capacity of five multi-purpose dams in Korea (Soyang River, Chungju, Andong, Daecheong, Seomjin River) were evaluated under the specific drought conditions. As a result, it would be possible to have stable water supply with their own inflow during summer and fall, whereas water shortage would occur even under the 1-year return period drought event during spring and winter due to low rainfall.
This paper evaluated the water resources aspect of the operating results of the Daecheong Multipurpose Dam for the last 21 years. The elements that were evaluated included the amount of water supply from the dam. volume of outflow from the regulating dam, changes in the runoff volume at the dam site and downstream, and variations in the water supply capacity of the Daecheong Multipurpose Dam and the Geum River Barrage Dam situated in the estuary. The rainfall-runoff model was used to evaluate the changes in the runoff volume, and the water balance analysis system was used to evaluate the variations in the dams'water supply capacities. The volume of domestic and industrial water supply from the Daecheong Multipurpose Dam increased to 6.1 times for the last 21 years from 61${\times}$$10^6$$m^3$ in 1981 to 375${\times}$$10^6$$m^3$in 2001. The rate of outflow to inflow of the Daecheong Dam was analyzed 1.30 times in dry season, 1.12 times in semi-dry season, and 0.90 times in rainy season. The volume of inflow to the Geum River Barrage Dam down- stream after the dam's construction increased to 1.25 times in dry season and 1.02 times in semi-dry season and decreased to 0.94 times in rainy season. The water supply capacity of the estuary barrage dam almost did not change in cases with or without the Daecheong Multipurpose Dam, but storages were largely affected by the outflows of the Daecheong Multipurpose Dam.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.