• 제목/요약/키워드: water intake tunnel

검색결과 16건 처리시간 0.02초

Composition, Structure and Some Distribution Features of Fouling Community in the Water Intake Tunnel of Vladivostok Heat and Power Plant

  • Moshchenko Alexander V.;Zvyagintsev Alexander Yu.
    • Ocean and Polar Research
    • /
    • 제26권4호
    • /
    • pp.619-633
    • /
    • 2004
  • The composition, structure and some of the features of spatial distribution of fouling communities in the cooling system tunnels of Heat and Power Station Vladivostok City were determined. Three groups of animals, possessing features expressive of topological differentiation as well as categorical differences based on dominant and subdominant species, were clearly distinguished in the fouling community of the water intake tunnel. These are Jassa marmorata on the tunnel vault, Balanus rostratus on the walls, and Mytilus trossulus on the bottom. The group from the tunnel vault should be clearly related to 'physically controlled' communities, whereas the groups from the walls and bottom, being also physically controlled, show many of the features of 'biologically balanced' communities. Thermal treatment of tunnels, performed in summertime, is grossly inefficient, since mytilids continue to settle in September-November as well. In order to prevent intensive settlement of Mytilus trossulus larvae it is recommended that the water intake tunnels integral to the cooling system be placed deeper than 15m.

수리실험을 이용한 지하유입시설 유입구 형상에 따른 수리학적 특성 분석 (Study of Hydraulic Characteristics with the Shape of the Intake of an Underground Inflow Facility using Hydraulic Experiments)

  • 성호제;박인환;이동섭
    • 한국안전학회지
    • /
    • 제33권4호
    • /
    • pp.119-126
    • /
    • 2018
  • In recent years, as flood damage caused by heavy rains increased, the great-depth tunnel using urban underground space is emerging as a countermeasure of urban inundation. The great-depth tunnel is used to reduce urban inundation by using the underground space. The drainage efficiency of great-depth tunnel depends on the intake design, which leads to increase discharge into the underground space. The spiral intake and the tangential intake are commonly used for the inlet facility. The spiral intake creates a vortex flow along the drop shaft and reduces an energy of the flow by the wall friction. In the tangential intake, flow simply falls down into the drop shaft, and the design is simple to construct compared to the spiral intake. In the case of the spiral intake, the water level at the drop shaft entrance is risen due to the chocking induced by the flowrate increase. The drainage efficiency of the tangential intake decreases because the flow is not sufficiently accelerated under low flow conditions. Therefore, to compensate disadvantages of the previously suggested intake design, the multi-stage intake was developed which can stably withdraw water even under a low flow rate below the design flow rate. The hydraulic characteristics in the multi-stage intake were analyzed by changing the flow rate to compare the drainage performance according to the intake design. From the measurements, the drainage efficiency was improved in both the low and high flow rate conditions when the multi-stage inlet was employed.

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

어류 차단 스크린 설치에 따른 안동-임하호 연결터널 내 흐름변화에 대한 전산유체동역학 수치모의 (Computational Fluid Dynamics Simulation of Flow Pattern Change in the Andong-Imha Reservoir Connecting Tunnel Due to Fish Exclusion Screens)

  • 안상도
    • 한국물환경학회지
    • /
    • 제30권5호
    • /
    • pp.477-485
    • /
    • 2014
  • Imha Reservoir is connected to Andong Reservoir via a diversion tunnel allowing water to pass between. The diversion tunnel is equipped with screens to exclude exotic largemouth bass due to their predatory impacts on prey assemblages resulting in a degradation of species richness of local fish fauna and extinction of local fish populations in Korea. Flow pattern changes resulting from the fish screens and trash racks were investigated using a computational fluid dynamics (CFD) model. Numerical simulations showed that the decrease in the discharge capacity of the tunnel is approximately 8.6% and the headloss coefficient for fish screen at Andong intake tower was determined to be 1.5. In order not to allow the small fishes enough to pass through the wire openings enter into Imha Reservoir through tunnel, the velocity in the tunnel should be greater than 1.48 m/s which is a critical ascending velocity of the bass. This study suggests that it can keep the velocity higher enough to exclude largemouth bass when a gate opens with the condition of 1.0m difference in water stage between two reservoirs.

지하수 과다유입 조건하에서의 터널굴착 (Tunneling in Severe Groundwater Inflow Condition)

  • 이용남;김대영
    • 한국지반환경공학회 논문집
    • /
    • 제7권2호
    • /
    • pp.67-76
    • /
    • 2006
  • 본 논문은 수직 절리가 잘 발달된 지하수위가 높은 화산암질 지반에서 직경 3.3m의 도수터널 굴착을 하는 수력발전소 건설공사 내용이다. 취수시설은 발전소로부터 20.3km 상류에 위치하고 있으며, 20km의 도수터널과 연결되어 있고 440m의 낙차고를 갖는 펜스탁이 발전소와 연결되어 있다. 현장의 지질 조건은 전형적인 칼데라 호수인 토바호에 의해 지반 침식과 수직방향의 인장균열이 발달하였으며 이로 인해 지반의 초기응력이 이완되었다. 높은 지하수위(최대 수두 200m)를 가진 잘 발달된 수직 절리를 터널이 관통하면서 막대한 양의 지하수가 터널내로 유입되었다. 터널 굴착은 개방형 쉴드 TBM과 버럭반출에는 철로와 기관차를 사용하였다. 터널 내로의 유입수가 터널 바닥면에서 70cm 높이에 다다르고 이는 터널 직경(3.9m)의 17%에 해당하였다. 생산성을 향상하기 위해서 TBM과 버럭반출 차량과 같은 몇 가지의 개선과 수중펌프를 증설하는 방안을 사용하였다. 굴착 중에 만난 지반 조건이 설계보다 상당히 불량하여 RC라이닝에서 지하수 유입, 암반조건, 수압 등에 따라 PC 세그먼트 라이닝 또는 PC 세그먼트 라이닝과 현장타설 RC 라이닝, RC 라이닝, 그리고 강재 라이닝이 적용되었다. 이 PC 세그먼트 라이닝의 도입과 TBM과 다른 장비의 개조 및 개선을 통해서 심각한 지하수 조건 하에서 터널 굴착 공사를 성공적으로 완료하였다.

  • PDF

공업용수 공급시스템의 효율적인 운영을 위한 시스템다이내믹스 모형의 개발 (Development of a System Dynamics Computer Model for Efficient Operations of an Industrial Water Supply System)

  • 김봉재;박수완;김태영;전대훈
    • 상하수도학회지
    • /
    • 제26권3호
    • /
    • pp.383-397
    • /
    • 2012
  • In this study, a System Dynamics (SD) simulation model for the efficient operations of an industrial water supply system was developed by investigating the feedback loop mechanisms involved in the operations of the system. The system was modeled so that as demand is determined the water supply quantity of intake pumping stations and dams are allocated. The main feedback loop showed that many variables such as the combinations of pump operation, unit electric power(kWh/$m^3$), unit electric power costs(won/$m^3$), water level of water way tunnel, suction pressure and discharge of pumping station, and tank and service reservoir water level had causal effects and produced results depending on their causal relationship. The configurations of the model included an intake pumping station model, water way tunnel model, pumping station model (including the tank and service reservoir water level control model), and unit electric power model. The model was verified using the data from the case study industrial water supply system that consisted of a water treatment plant, two pumping stations and four dams with an annual energy costs of 5 billion won. It was shown that the electric power costs could have been saved 7~26% during the past six years if the operations had been based on the findings of this study.

가배수 터널을 이용한 이상홍수 대비 단면확보에 관한 연구 (A Study on the Cross Section Insurance to Provide for the Extraordinary Flood for the Reservoir of the Temporary Division Tunnel)

  • 백원현;박기범;지홍기
    • 한국환경과학회지
    • /
    • 제17권7호
    • /
    • pp.733-741
    • /
    • 2008
  • The object of this study is the safety insurance of the dam to provide for the extraordinary flood. The safety insurance of the reservoir was taken by the preparatory discharge using the temporary division tunnel used during the reservoir construction. In this study, the Sungju reservoir was simulated. The existing discharge facilities of the intake tower of the Sungju reservoir could nat have influence on the flood control. When the Sungju reservoir operated to begin preparatory discharge for 48 hrs by the temporary diversion tunnel that have discharge of an 20-years frequency, the water level was lowered about 20 cm. When the Sungju reservoir operated to begin the continuous discharge after the preparatory discharge, the water level was lowered over 1m but the downstream at risk was caused by the resulted. If it is possible to operate to begin the preparatory discharge of the reservoir for 24 hrs by the temporary diversion tunnel, that will improve the flood control faculty of the reservoir without other hydraulic structure and safety of the Sungju reservoir will be higher.

한강수계 광역상수도 원수관의 지열 영향 조사 (Geothermal Effects on the Underground Water Conveyance Pipe System from Han River)

  • 조용;박진훈;박태진;김영준
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.171.2-171.2
    • /
    • 2010
  • Geothermal effects on the underground water conveyance pipe system have been investigated through the multiregional water supply system from Paldang water intake station. To make an investigation of raw water thermal energy, temperature sensors are installed the surface of the pipes of metropolitan area water supply system. In 2009 winter and early spring seasons, the monthly averaged temperatures at Paldang 2 intake stations are $1.94^{\circ}C$ in February, $4.96^{\circ}C$ in March, and $10.56^{\circ}C$ in April. After the transfer in 26.0 km distance of tunnel and buried pipe, the raw water temperatures are raised to $3.13^{\circ}C$, $6.04^{\circ}C$, and $11.39^{\circ}C$ respectively. As the temperature difference between the raw water and the air reduces, the temperature increasement is reduced by $1.19^{\circ}C$ in Feb., $1.08^{\circ}C$ in Mar., and $0.83^{\circ}C$ in Apr. Since the flowrate is over 1,150,000 $m^3$/day, it is estimated that the water exchanges a huge amount of heat over 1.0 Tcal a day with the ground.

  • PDF

팔당 취수펌프장의 수격현상에 관한 수치해석적 연구 (Numerical Study on the Waterhammer of PalDang Intake Pumping Station)

  • 김경엽;유택인
    • 한국유체기계학회 논문집
    • /
    • 제3권4호
    • /
    • pp.52-58
    • /
    • 2000
  • The numerical study on the waterhammer was carried out for the intake pumping station of the metropolitan water supply 6th stage project. Because the waterhammer problems as a result of the pump power failure were the most important, these situations were carefully investigated. The surge tank and the stand pipes effectively protected the tunnels md the downstream region of pipeline from the pressure surge. In case the moment of inertia of the pump and motor was above $5080\;kg{\cdot}m^2$, the column separation did not occur in the pipeline between the pumping station and the inlet of 1st tunnel. As the moment of inertia increased, the pressure surges decreased in the pipeline conveying raw water. The pump control valve was chosen as the main surge suppression device for the intake pumping station. After power failure, the valve disc should be rapidly closed in 2.5 seconds and controlled the final closure to 15 seconds by the oil dashpot. If the slamming happened to the pump control valve, there was some danger of this system damaging. As the reverse flow through the valve increased, the upsurge extremely increased.

  • PDF

Uncertainty reduction of seismic fragility of intake tower using Bayesian Inference and Markov Chain Monte Carlo simulation

  • Alam, Jahangir;Kim, Dookie;Choi, Byounghan
    • Structural Engineering and Mechanics
    • /
    • 제63권1호
    • /
    • pp.47-53
    • /
    • 2017
  • The fundamental goal of this study is to minimize the uncertainty of the median fragility curve and to assess the structural vulnerability under earthquake excitation. Bayesian Inference with Markov Chain Monte Carlo (MCMC) simulation has been presented for efficient collapse response assessment of the independent intake water tower. The intake tower is significantly used as a diversion type of the hydropower station for maintaining power plant, reservoir and spillway tunnel. Therefore, the seismic fragility assessment of the intake tower is a pivotal component for estimating total system risk of the reservoir. In this investigation, an asymmetrical independent slender reinforced concrete structure is considered. The Bayesian Inference method provides the flexibility to integrate the prior information of collapse response data with the numerical analysis results. The preliminary information of risk data can be obtained from various sources like experiments, existing studies, and simplified linear dynamic analysis or nonlinear static analysis. The conventional lognormal model is used for plotting the fragility curve using the data from time history simulation and nonlinear static pushover analysis respectively. The Bayesian Inference approach is applied for integrating the data from both analyses with the help of MCMC simulation. The method achieves meaningful improvement of uncertainty associated with the fragility curve, and provides significant statistical and computational efficiency.