Browse > Article
http://dx.doi.org/10.5322/JES.2008.17.7.733

A Study on the Cross Section Insurance to Provide for the Extraordinary Flood for the Reservoir of the Temporary Division Tunnel  

Baek, Won-Hyun (Province of Kyeongsangbukdo, Division of balance development)
Park, Ki-Bum (Department of Construction Information Andong Science College)
Jee, Hong-Kee (School of Civil, Urban and Environment Engineering, Yeungnam University)
Publication Information
Journal of Environmental Science International / v.17, no.7, 2008 , pp. 733-741 More about this Journal
Abstract
The object of this study is the safety insurance of the dam to provide for the extraordinary flood. The safety insurance of the reservoir was taken by the preparatory discharge using the temporary division tunnel used during the reservoir construction. In this study, the Sungju reservoir was simulated. The existing discharge facilities of the intake tower of the Sungju reservoir could nat have influence on the flood control. When the Sungju reservoir operated to begin preparatory discharge for 48 hrs by the temporary diversion tunnel that have discharge of an 20-years frequency, the water level was lowered about 20 cm. When the Sungju reservoir operated to begin the continuous discharge after the preparatory discharge, the water level was lowered over 1m but the downstream at risk was caused by the resulted. If it is possible to operate to begin the preparatory discharge of the reservoir for 24 hrs by the temporary diversion tunnel, that will improve the flood control faculty of the reservoir without other hydraulic structure and safety of the Sungju reservoir will be higher.
Keywords
Reservoir; Temporary division tunnel; Extraordinary flood;
Citations & Related Records
연도 인용수 순위
  • Reference
1 이재형, 심명필, 전일권, 1993, 대청댐 예비방류를 위한 홍수예보, 한국수문학회지, 26(2), 99-105
2 선우중호, 이재형, 전일권, 황만하, 1995, 소양호의 예비방류 효과에 관한 연구, 한국수자원학회 학술 발표회 논문집, 431-436
3 심명필, 권오익, 이환기, 1995, 홍수기중 가변제한 수위에 의한 저수지 운영, 한국수자원학회지, 28. 217-228
4 황만하, 1997, 홍수기 저수지 운영의 예비방류에 관한 연구, 대한토목학회논문집, 17(II-5), 453-460
5 박봉진, 강권수, 정관수, 1997, 예비방류를 고려한 대청댐의 홍수기중 운영방안, 한국수자원학회 학 술발표회 논문집, 414-419
6 농업기반공사, 2002, 이상호우에 대비한 농업용 댐 (저수지) 홍수조절 기능 분석 및 개선방안 -동화댐 과 성주댐을 중심으로-, 13-16
7 백원현, 박기범, 지홍기, 2007, 소규모 농업용저수 지의 사전방류에 의한 홍수조절효과 분석에 관한 연구, 한국환경과학회 2007 봄학술발표회 논문집, 254-257
8 US Army Corps of Engineering Hydrologic Center, 2001, Hydrologic Modelling System HEC-HMS Technical Reference Manual, 116-120
9 US Army Corps of Engineering Hydrologic Center, 2001, Hydrologic Modelling System HEC-HMS User's Manual, 59-79
10 김승권, 1988, 저수지 운영방안의 방법론적 개괄, 한국수문학회지, 21(1), 16-23