• Title/Summary/Keyword: water environmental management

Search Result 2,977, Processing Time 0.035 seconds

Characterization on the Pollution Discharge Load at the Unit Watershed for the Management of Total Maximum Daily Loads - in Guem River Basin (수질오염총량관리 단위유역별 오염물질 배출부하량 특성분석 - 금강수계를 대상으로)

  • Park, Jun Dae;Choi, Ok Youn;Oh, Seung Young
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.786-795
    • /
    • 2012
  • Water quality management should be focused on the pollution concentrated area so that the improvement of water quality can be achieved effectively for the management of Total Maximum Daily Loads (TMDLs). It is necessary to consider discharge characteristics in the TMDL plan. This study analysed discharge characteristics such as pollution generation and discharge load density, and reduction potential by each unit watershed, and categorized the unit watershed into four groups according to its discharge load characteristics. This analysis can be used as helpful information for the prioritization of pollution reduction area and selection of pollution reduction measures in the development of TMDL plans.

Needs of Biosecurity and Protocols for the Environmental Management of Carcasses Burial (가축매몰지 환경관리에 있어 차단방역의 필요 및 절차)

  • Cho, Ho-Seong;Kim, Geonha
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.2
    • /
    • pp.305-312
    • /
    • 2012
  • Avian influenza (AI) and foot and mouth disease (FMD) are two main contagious pathogenic viruses causing massive mortality burial, as burial is a primary measure to quaranteen the causative viruse(s). Biosecurity is a set of preventive measures designed to reduce the risk of propagation of infectious diseases. Main objectives of this paper were to discuss the needs of biosecurity and develop protocol outlines for environmental management of burial sites. Pathological characteristics of contagious viruses should be considered during environmental management practices. Current practice prescribes to minimize the potential for on-farm pollution and the spread of infectious diseases, policy makers should understand robust knowledge regarding biosecurity to make informed decisions on future legislation.

Constructing the Operating Information System(OIS) and Improving the Water Quality by OIS in Water Treatment Plants (수도시설 운영정보화 시스템 구축 및 효율개선효과)

  • Oh, Jung-Woo;Song, Yoon-Seob;Kang, Geum-Bai;Yoo, Man-Sik
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.6
    • /
    • pp.699-705
    • /
    • 2007
  • In this study, the improvement of the operation condition and the water quality in water treatment plant by operating information system(OIS) was evaluated for Ansan water treatment plant. The average flow rate of raw water in the year 2005(after constructing the OIS) appeared 15.6 % lower than that in the year 2004(before constructing the OIS). The mean value(12.37 NTU) of raw water turbidity in the year 2005 remained constant, or nearly so with that(12.06 NTU) in the year 2004. The average dosing rates of coagulant appeared 12.06 mg/L in the year 2005 which was higher than 10.31 mg/L in the year 2004. Furthermore, the average turbidity concentration of fresh water in the year 2005 appcared slightly better than that in the year 2004. From $COD_{Mn}$ and BOD concentration of raw water, the water quality in the year 2005 were better than those in the year 2004. The average concentration of $KMnO_4$ in the year 2004 and the year 2005 was 2.95 mg/L and 1.25 mg/L, respectively, and the average concentration of THMs in the year 2004 and the year 2005 appeared 0.038 mg/L and 0.025 mg/L, respectively. Therefore, the fresh water quality in the year 2005 was better than that in the year 2004. In this study, it is considered that the operation of Ansan water treatment plant may be optimized by OIS, and thus the OIS may be very useful method to improve the water quality.

Development of Prediction Techniques of Water Pollution Sources for the Management of Total Maximum Daily Load - Population Prediction of Pollution Sources from Human Living - (수질오염총량관리를 위한 오염원 예측기법 개발 - 생활계 오염원 인구 예측 -)

  • Park, Jundae;Park, Juhyun;Lee, Suwoong;Jeong, Donghwan;Rhew, Doughee
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.4
    • /
    • pp.561-567
    • /
    • 2007
  • It is necessary to predict future water pollution sources in the establishment of Total Maximum Daily Load (TMDL) plan for watershed management. There are some difficulties and limits in estimating the pollution sources accurately since the prediction method is not firmly established. This study reviewed the existing methods of prediction and developed a technique characteristics. The characteristics were obtained by analyzing the change pattern of pollution sources by region and incorporated in the technique. A distinctive feature of the technique is to eliminate the influences of land use change included in the pollution source data of a region. The technique has been applied and tested. The test result showed the improvement on the prediction accuracy. A computer program was also developed for the easy application of the technique.

Applicability of Load Duration Curve to Nakdong River Wateished Management (낙동강 유역관리를 위한 부하량 유황곡선의 적용 가능성)

  • Han, Suhee;Shin, Hyun Suk;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.620-627
    • /
    • 2007
  • In this study a general analysis method for watersheds with the entire runoff conditions and corresponding water quality is proposed and its applicability based on the currently available information is investigated. Using the 8-day-interval data set of runoff and water quality observed by Nakdong River Environment Research Center, the flow duration curve and discharge-load relation curve for each unit watershed are established, then the load duration curve is finally constructed. This paper discusses how the load duration curve can be used in the assessment of TMDL. The entire Nakdong river watershed is also divided into prior managing areas of point sources or non-point sources in a way of general management. It is thought that LDC can be a great tool for visualizing overall probabilities of current water quality and thus for the TMDL management.

Purification of Stream Water Quality by Subsurface-flow Wetland Facility (습지여상시설을 이용한 하천 수질정화)

  • Jung, Yong-Jun;Lim, Ki-Sung
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.3
    • /
    • pp.456-461
    • /
    • 2006
  • The facility of constructed wet land combined with filter media was examined in order to improve the water quality of a polluted stream, which has been performed as a part of national projects. Throughout 2 years of operation for a stream, it can provide the design and operating parameters for the purpose of future construction. The influent flow rate was about 50% against the design capacity. The removal efficiencies of BOD, $COD_{Mn}$, SS, T-N and T-P were 62.9%, 47.1%, 74.8%, 22.4% and 33.5%, respectively. In order to keep this facility stable, the removal of surface filter media and supplement should be periodically conducted. In addition, the proper selection of sites is recommended not to be flooded.

Water Quality Analysis in Nakdong River Tributaries (낙동강 지류·지천 모니터링 결과를 이용한 수질환경 평가)

  • Im, Tae Hyo;Son, Younggyu
    • Journal of Environmental Science International
    • /
    • v.25 no.12
    • /
    • pp.1661-1671
    • /
    • 2016
  • Water quality in Nakdong river was analyzed using 699 monitoring data sets including flow rates and water quality concentrations collected at 195 tributary monitoring stations (the priority management areas: 35 stations, the non-priority management areas: 160 stations) in 2015. The highest average concentrations of all data for BOD, COD, T-N, T-P, SS, and TOC were 30~600 times higher than the lowest concentrations while the highest average loading rates were 800,000~2,700,000 times higher than the lowest loading rates. Because of the very large differences in the concentrations and loading rates, the variation of the concentrations and loading rates in a priority management monitoring station for BOD, T-P, and TOC was analyzed using the coefficient of variation, the ratio of the standard deviation value to the mean value. For BOD, T-P, and TOC, the coefficients of variation for concentration were mostly less than 100%, whereas the coefficients of variation for loading rate ranged from 31.1% to 232.2%. The very big difference in the loading rates was due to the large variation in flow rates. As a result of this, the estimation of water quality at each monitoring station using the average values of the concentrations and loading rates might be not rational in terms of their representativeness. In this study, new water quality analysis methods using all collected monitoring data were suggested and applied according to the water quality standard in medium-sized management areas.

A Modified Methylation Method to Determine Fatty Acid Content by Gas Chromatography

  • Wirasnita, Riry;Hadibarata, Tony;Novelina, Yus Maria;Yusoff, Abdull Rahim Mohd;Yusop, Zulkifli
    • Bulletin of the Korean Chemical Society
    • /
    • v.34 no.11
    • /
    • pp.3239-3242
    • /
    • 2013
  • An improved rapid method for determination of the fatty acid composition using modified methylation procedure was compared with the AOAC reference procedure based on the methylation of fatty acid with the addition of BF3 catalyst before and while heating. The new method is useful for research and routine quality control and has a number of advantages over the reference procedure which are more rapid, simple and also reliable. Applicability of the modified methylation method was confirmed with three vegetable oil samples (palm oil, coconut oil and olive oil). Based on the validation method results, we obtained that a quite linear calibration curve of fatty acids was performed with $R^2$ in range of 0.9972-0.9994. The sensitivity of gas chromatography instrument was able to analyze the fatty acids up to a few ppm, the precision and accuracy were good enough with the %RSD between 1.5%-19.5% and the recovery of linolenic acid was 99.1% in the range of 80.0%-113.3%.

Enhancement of Water Purification Functions of Watershed Basin (II) -­With a Special Reference to the Point at Issue and Counterplans­- (수변구역 산림의 수질정화기능 증진 (II) -­문제점과 대책을 중심으로­-)

  • Park, Jae-Hyeon
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.5 no.3
    • /
    • pp.58-65
    • /
    • 2002
  • This study synthesizes previous research accomplishments with analysis of problems and counterplan for the riparian forest zone management and ongoing research strategy is suggested. If a part of budgets for water use allotments is supported for forest watershed owner, this policy for the forest owner could encourage the forest management of watershed. Integrated riparian forest management guideline in city and county needs to be established for the implementation of government guidelines. Base on the guideline, working plans of city and county could be evaluated. Public Forest Tending Work for stream water quality and quantity conservation should be enlarged for forest watershed and forest area management in five big river watersheds. Forest watershed should be managed with a connected system for a pollutant reduction strategy in urban and industrial areas.

Establishment of Life Cycle Management(LCM) System for Water Supply and Sewerage Systems (상하수도시설에 대한 전과정관리(LCM)시스템 구축방안 연구)

  • Park, Ji-Hyoung;Hwang, Young-Woo;Kim, Young-Woon;Park, Kwang-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.26 no.2
    • /
    • pp.303-312
    • /
    • 2012
  • Water supply and sewerage systems are the large-scale urban infrastructure ejecting large amount of environmental load over the life-cycle. Therefore, it is important not only to optimize in the aspect of economical superiority and process efficiency but also to consider earth scale environmental impact. This study aimed to suggest the establishment of life cycle management(LCM) system as an integrated management solution in urban water supply and sewerage systems. As a result, the methodology for LCM system consisting of life cycle assessment(LCA), life cycle cost(LCC), life cycle $CO_{2}(LCCO_{2})$ and life cycle energy(LCE) was developed. Also, several case studies using the latest statistics data of water supply and sewerage systems were carried out to investigate the field applicability of LCM.