• Title/Summary/Keyword: waste estimation

Search Result 320, Processing Time 0.027 seconds

A Basic Study of Automatic Estimation Algorithm on the Rebar Length of Beam by Using BIM-Based Shape Codes Built in Revit (BIM 기반 형상코드를 이용한 보 철근길이 자동 산장 기초 연구)

  • Widjaja, Daniel Darma;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.167-168
    • /
    • 2023
  • Construction of reinforced concrete structures required massive amounts of concrete and steel rebar. The current procedure to estimate the quantity of rebar requires tedious and time-consuming manual labor. Consequently, this circumstance made the engineers vulnerable to error and mistake, which led to the rebar waste. No system that is capable of automatically calculating rebar length has yet been developed Thus, this study proposes a preliminary investigation of automatic rebar length estimation of beam element by using BIM-based shape codes drawn in Revit. Beam is chosen due to its complexity in the rebar arrangement. In addition, the development of this study could assist engineers on the construction site and effectively contribute to the minimization of rebar waste in the future.

  • PDF

Estimation of greenhouse gas emissions: An alternative approach to waste management for reducing the environmental impacts in Myanmar

  • Tun, Maw Maw;Juchelkova, Dagmar
    • Environmental Engineering Research
    • /
    • v.24 no.4
    • /
    • pp.618-629
    • /
    • 2019
  • Along with growing population and economic development, increasing waste generation rates in developing countries have become a major issue related to the negative impacts of waste management on the environment. Currently, the business-as-usual waste management practices in Myanmar are largely affecting the environment and public health. Therefore, this study developed an alternative approach to waste management for reducing the environmental impacts in Myanmar by highlighting the greenhouse gas (GHG) emissions from business-as-usual practices and three proposed scenarios during 2018-2025. The calculation methods of the Intergovernmental Panel on Climate Change and Institute for Global Environmental Strategies were used for estimating the GHG emissions from waste management. It was estimated that the current waste management sector generated approximately 2,000 gigagrams of CO2-eq per year in 2018, trending around 3,350 Gg of CO2-eq per year in 2025. It was also observed that out of the proposed scenarios, Scenario-2 significantly minimized the environmental impacts, with the lowest GHG emissions and highest waste resource recovery. Moreover, the GHG emissions from business-as-usual practices could be reduced by 50% by this scenario during 2018-2025. The target of the similar scenario could be achieved if the local government could efficiently implement waste management in the future.

Estimation of radionuclides leaching characteristics in different sized geopolymer waste forms with simulated spent ion-exchange resin

  • Younglim Shin;Byoungkwan Kim;Jaehyuk Kang;Hyun-min Ma;Wooyong Um
    • Nuclear Engineering and Technology
    • /
    • v.55 no.10
    • /
    • pp.3617-3627
    • /
    • 2023
  • This study presents a method to solidify spent ion-exchange resin (IER) in a metakaolin-based geopolymer and shows results of mechanical strength, immersion, leaching, irradiation, and thermal cycling tests for waste acceptance criteria (WAC) to repository. The geopolymer waste form with 20 wt% of simulated spent IER met the WAC in South Korea (ROK), and the leaching tests of various sized-waste forms up to 15.0 × 30.0 cm and waste loadings up to 20 wt% for 1-5 d and 1-90 d achieved a leachability index, Li > 6. In a leaching test for 5 d, the cumulative fraction leached (CFL) for Cs, which leached the most, was linearly correlated with the square root of leaching time for all waste forms, and Li increased as the size of the waste form increased. The CFL was also correlated with elapsed time in the 90 d leaching test. The correlations among CFL, time, and volume-to-surface area ratio of waste forms used to estimate the Li of Cs of a 200-L sized geopolymer with 15 wt% IER showed the Li values as 14.73 (5 d) and 17.71 (90 d), respectively, indicating that the large-sized geopolymer waste form met the WAC.

A Study on Estimation of Construction Wastes Units in Urban Development (도시개발지구내 건설폐기물 발생원단위 특성연구)

  • Kim, Sang-Keun;Chung, Ha-Ik;Kwon, Ki-Bum;Yu, Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1452-1455
    • /
    • 2008
  • In order to establish active and effective recycling plans on construction wastes, the study seeks to built unit generation data per construction waste types on each sector, prepare units data on urban construction waste generation and serve as meaningful data on the establishment of policies on construction waste recycling targeting urban regions. The significance of the study is on the establishment of construction waste recycling plan prior to generation, not as complementary measures on construction waste generated.

  • PDF

Quantitative Comparison of Activity Calculation Methods for the Selection of Most Reliable Radionuclide Inventory Estimation

  • Hwang, Ki-Ha;Lee, Sang-Chul;Lee, Kun-Jai;Jeong, Chan-Woo;Ahn, Sang-Myeon;Kim, Tae-Wook;Kim, Kyoung-Doek;Herr, Y.H.
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2003.11a
    • /
    • pp.322-327
    • /
    • 2003
  • It is important to know the accurate radionuclide inventory of radioactive waste for the reliable management. However, estimation of radionuclide concentrations in drummed radioactive waste is difficult and unreliable because of difficulties of direct detection, high cost, and radiation exposure of sampling personnel. In order to overcome these difficulties, scaling factors (SFs) have been used to assess the activities of radionuclides that could not be directly analyzed. A radionuclide assay system has been operated at KORI site since 1996 and consolidated scaling factor method has played a dominant role in determination of radionuclides concentrations. However, some problems are still remained such as uncertainty of estimated scaling factor values, inaccuracy of analyzed sample values, and disparity between the actual and ideal correlation pairs and the others. Therefore, it needs to improve the accuracy of scaling factor values. The scope of this paper is focused on the improvement of accuracy and representativeness of calculated scaling factor values based on statistical techniques. For the selection of reliable activity determination method, the accuracy of estimated SF values for each activity determination method is compared. From the comparison of each activity determination methods, it is recommended that SF determination method should be changed from the arithmetic mean to the geometrical mean for more reliable estimation of radionuclide activity. Arithmetic mean method and geometric mean method are compared based on the data set in KORI system.

  • PDF

A Study on the prediction of SOH estimation of waste lithium-ion batteries based on SVM model (서포트 벡터 머신 기반 폐리튬이온전지의 건전성(SOH)추정 예측에 관한 연구)

  • KIM SANGBUM;KIM KYUHA;LEE SANGHYUN
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.727-730
    • /
    • 2023
  • The operation of electric automatic windows is used in harsh environments, and the energy density decreases as charging and discharging are repeated, and as soundness deteriorates due to damage to the internal separator, the vehicle's mileage decreases and the charging speed slows down, so about 5 to 10 Batteries that have been used for about a year are classified as waste batteries, and for this reason, as the risk of battery fire and explosion increases, it is essential to diagnose batteries and estimate SOH. Estimation of current battery SOH is a very important content, and it evaluates the state of the battery by measuring the time, temperature, and voltage required while repeatedly charging and discharging the battery. There are disadvantages. In this paper, measurement of discharge capacity (C-rate) using a waste battery of a Tesla car in order to predict SOH estimation of a lithium-ion battery. A Support Vector Machine (SVM), one of the machine models, was applied using the data measured from the waste battery.