• Title/Summary/Keyword: waste estimation

Search Result 320, Processing Time 0.039 seconds

A Study on the Application of Early Estimation Method and Non-Destructive Testing for the Strength of Recycled Aggregate Concrete(I)-Part 1 : Mechanical Properties and Early Estimation of Strength- (재생골재 콘크리트의 강도 조기추정 및 비파괴실험 적용성에 관한 연구(I) -제 1 보: 역학적 성질 및 강도 조기추정-)

  • 김기철;윤기원;한천구;김무한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1993.04a
    • /
    • pp.26-29
    • /
    • 1993
  • To analyze the using of recycled aggregate on concrete as the substitude aggregate is important problem for the reuse of waste matter and prevention of environmental pollution. Therefore, this study is designed for investigating and analyzing the mechanical properties and early estimational properties of strength on concrete using aggregate of the waste concrete. And is aimed to provide the fundamental data for recycled aggregate.

  • PDF

A Study on the Improvement of Cost Calculation Model of Recycling Treatment Facility for Estimation of Construction Waste Disposal Fee (건설폐기물 처리대가 산정을 위한 중간처리시설의 비용산정 모델 개선에 관한 연구)

  • Chang-Hak, Kim;Jun-Yeong, Lee;Hyo-Jin, Kim
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.135-144
    • /
    • 2023
  • LH Corporation uses the construction waste disposal fee standard, of which the model was developed a long time ago. Therefore, this model is problematic because it needs to reflect waste treatment facilities' technological development and environmental conditions. In this study, the estimated manpower and costs required for the process operation of waste treatment facilities were analyzed, followed by the proposed estimation criteria. This improved standard model can be used as a cost calculation standard for the recycling and treatment of construction waste in public institutions. The study also suggests that an increase in waste treatment costs is needed.

Waste Load Allocation of Hwanggujicheon Watershed Using Optimization Technique (최적화기법을 이용한 황구지천유역의 오염부하량 할당)

  • Cho, Jae Heon;Chung, Wook Jin;Lee, Jong Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.6
    • /
    • pp.728-737
    • /
    • 2005
  • Water quality of the Hwanggujicheon is poor because of the rapid housing and development in the large area of the basin. Establishment of water quality management strategy, based on the pollution sources survey and pollutant loads estimation, has to be established for the preservation of the stream water quality of the region. In this study, waste load allocation model to achieve the water quality goal of the stream and the optimization of pollutant load reduction, was developed. Nonpoint pollutant loads calculated by runoff model in the previous study are utilized for pollutant loads estimation of the drainage areas in this study. From the application result of the allocation model, water quality goals of the Hwanggujicheon that can be achieved as a matter of fact are BOD 8 mg/L. To achieve these goals, 23% of effluent BOD loads have to be reduced in the basin.

Suggestions for the Estimation of the Methane Emission from a Landfill Site

  • Lee, Kyungho;Jeon, Eunjeong;Lee, Youngmin;Park, Junghyun
    • Journal of Urban Science
    • /
    • v.9 no.1
    • /
    • pp.69-73
    • /
    • 2020
  • Sudokwon landfill("Sudokwon" means regions of Seoul, Kyunggi and Incheon metropolitan cities in Korea), the world's largest sanitary landfill, has been systematically managing statistics on the incoming and dumping wastes and satisfactorily controlling pollutants including leachate and LFG. According to our long time experience of LFG field monitoring, the emission of GHG from landfill estimated by the IPCC Guideline showed much difference with our results. C&D waste has high concentration of sulfate compared to other wastes. Increased C&D waste of dumping waste had changed the COD/sulfate ratio in the landfill, which caused the increase of H2S gas and the decrease of CH4 gas. But the IPCC estimation method does not consider the effects of sulfate. In addition to that, the oxidation factor of the cover soil is set to the default values of 0.1 but the measured values by the field monitoring, are showing much higher than that, especially in the closed landfill.

Preliminary Estimation of Waste Landfill Sites Using Geo-Spatial Information System and Analytic Hierarchy Process (GSIS와 AHP법을 이용한 쓰레기 매립지 예비 평가 방법)

  • 양인태;김연준;최광식
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.16 no.1
    • /
    • pp.59-66
    • /
    • 1998
  • According to grow interest in environmental quality with improvements of a standard of living site selection problems of environmental hatred facilities, such as waste landfill sites caused regional conflicts. This study investigates a waste landfill estimation method that was used to storage, management, analysis and display of environmental information provided by goo-spatial information system(GSIS) analytic hierarchy process(AHP) as a decision-making method. If GSIS is integrated with AHP, site selection problems of environmental hatred facilities shall be able to very useful, because of AHP with flexibility which appropriately reflect opinions of the related group.

  • PDF

A Study on the Method of Cost Estimation for the Decommissioning Plan by the Analysis of Domestic Cyclotron Dismantling Practices (국내 사이클로트론 해체 사례 분석을 통한 해체 계획 비용 산정 방법 연구)

  • Woo, Rina;Kim, Yongmin
    • Journal of the Korean Society of Radiology
    • /
    • v.8 no.3
    • /
    • pp.97-103
    • /
    • 2014
  • Decommission of medical cyclotron give rise to a lot of low-level radioactive waste and costs. Decommissioning cost should be reasonably calculated according to the decommissioning activities and installed components of facilities. In this paper, we investigated the experience on the cyclotron relocation from SNUH(Seoul National University Hospital) to SKKU(Sungkyunkwan University) and analyzed radioactive waste management costs by applying the disposal scenarios. Also considerations for decommissioning cost estimation are reviewed. The results could be utilized as a basic data for establishment on the methodology of decommissioning cost estimation and evaluation.

A Study of the Decommissioning Cost Estimation for Nuclear Facilities (원자력 시설 해체비용 산정에 관한 고찰)

  • 이동규;정관성;이근우;오원진
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.85-96
    • /
    • 2004
  • This paper is to study on the decommissioning cost estimation for nuclear facilities of advanced nuclear organizations and countries for deriving the cost factors to be taken considerations into accomplishing decommissioning projects. Of cost categories producing the factors of decommissioning costs, dismantling and waste processing & disposals activities are examined to increase the its costs. Of labor, materials and other costs categories, labor costs are summarized to have overall majorities in the decommissioning cost factors. The main parameters of all factors affecting the decommissioning costs are analyzed as work difficulty, regional labor costs, peripheral cost, disposal cost and final burial costs.

  • PDF

A Study on the Configuration of Cost Items and the Identification of Cost Affecting Factors for the Decommissioning Cost Estimation of Nuclear Research Facilities (원자력연구시설 해체비용 산정을 위한 비용항목 구성 및 비용 영향인자 산출 방안)

  • Jeong Kwan-Seong;Lee Dong-Gyu;Lee Kune-Woo;Oh Won-Zin
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2005.11a
    • /
    • pp.25-31
    • /
    • 2005
  • The decommissioning cost estimation is the very essential procedure to establish the decommissioning plans for Nuclear Research Facilities. The cost estimation must be made in accordance with activity phase and facility installations. This paper shows how to configuring the cost items and identifying the effecting cost factors. In the end, these methods will be utilized as a tool and technique to develop the methodology of cost estimation and calculation program.

  • PDF

A Suggestion of Contingency Guidelines According to ISDC Based on Overseas Contingency Data

  • Minhee Kim;Chang-Lak Kim;Sanghwa Shin
    • Journal of Nuclear Fuel Cycle and Waste Technology(JNFCWT)
    • /
    • v.20 no.4
    • /
    • pp.541-550
    • /
    • 2022
  • When decommissioning nuclear power plant (NPP), the first task performed is cost estimation. This is an important task in terms of securing adequate decommissioning funds and managing the schedule. Therefore, many countries and institutions are conducting continuous research and also developing and using many programs for cost estimation. However, the cost estimated for decommissioning an NPP typically differs from the actual cost incurred in its decommissioning. This is caused by insufficient experience in decommissioning NPPs or lack of decommissioning cost data. This uncertainty in cost estimation can be in general compensated for by applying a contingency. However, reflecting an appropriate standard for the contingency is also difficult. Therefore, in this study, data analysis was conducted based on the contingency guideline suggested by each institution and the actual cost of decommissioning the NPP. Subsequently, TLG Service, Inc.'s process, which recently suggested specific decommissioning costs, was matched with ISDC (International Structure for Decommissioning Costing)'s work breakdown structure (WBS). Based on the matching result, the guideline for applying the contingency for ISDC's WBS Level 1 were presented. This study will be helpful in cost estimation by applying appropriate contingency guidelines in countries or institutions that have no experience in decommissioning NPPs.

An Experimental Study on the Early Estimation of Recycled Aggregate Concrete Strength by Using Microwave (마이크로파를 이용한 재생골재 콘크리트 강도의 조기추정에 관한 실험적 연구)

  • 이민경;남정민;조규현;양동일;김성식;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2003.11a
    • /
    • pp.569-572
    • /
    • 2003
  • In many countries a considerable amount of demolition wastes is generated and wastes concrete constitutes a significant proportion of the construction waste. Therefore, the necessity for the use of recycled aggregate in concrete arise and the reuse of a waste concrete may solve the problems of environmental pollution and shortage of natural aggregate. According to this study is to examine the possibility of site adoption microwave-use early strength estimation method. Based on the existed study related the plain concrete, the interrelation between recycled aggregate concrte and microwave-use early strength estimation method is required.

  • PDF