• Title/Summary/Keyword: volume of underground structure

Search Result 35, Processing Time 0.025 seconds

Analysis of Slope Stability by the Distinct Element Method(Application to the Toppling Mechanisms) (개별요소법에 의한 사면 안정성 연구(토플링 파괴 메카니즘에 응용))

  • 한공창
    • Tunnel and Underground Space
    • /
    • v.3 no.1
    • /
    • pp.96-107
    • /
    • 1993
  • This paper deals with the analysis of rock slope stability using the distinct element method. This method consists in analysis of the interaction of discrete block assemblage delimited by elementary joints, which permits to consider the heterogeneous, anisotropic and discontinuous features of the rock mass. In particular, we were able to show that this method, and especially the BRIG3D software, is an outstanding tool which gives informations of greatest interest in order to analyze the toppling mechanisms. We have confirmed the fundamental role of the rock mass structure with different simulations. In the case of toppling phenomena, the essential parameter is the dip of major discontinuities. It has an influence on the intensity and volume of deformations. The anisotropic and heterogeneous features of the rock mass play also an important role. It is proved by insertion of thick rock bars in the structure or varying rock block sizes in the mass. These models modified considerably the stress distribution and the deformation distribution. Finally, we have analyzed the influence of mechanical parameters such as friction angle and tangential stiffness.

  • PDF

A Field Application of 3D Seismic Traveltime Tomography (II);Application of 3D Seismic Traveltime Tomography to a dam-planned area (3차원 탄성파 토모그래피의 현장 적용 (II);댐 예정지에서의 3차원 토모그래피 적용 사례)

  • Moon, Yoon-Sup;Ha, Hee-Sang;Ko, Kwang-Buem;Kim, Ji-Soo
    • Tunnel and Underground Space
    • /
    • v.18 no.4
    • /
    • pp.263-271
    • /
    • 2008
  • 3D seismic tomography technique was assessed for applicability of developed 3D tomography algorithm based on Fresnel volume in the dam-planned area. Reconstructed 3D tomogram based on Fresnel volume and Fast Marching Method(FMM) reveals similar velocity structure to the other geotechnical survey results. With the correlation analysis between RMR data and seismic velocity information, it could provide reliable information of rock mass rate. The applicability of 3D seismic tomography was verified in this study. It would be expected to apply 3D tomography with new developed first arrival calculation and inversion algorithm to the engineering field economically.

A Study on Machine Learning-Based Real-Time Automated Measurement Data Analysis Techniques (머신러닝 기반의 실시간 자동화계측 데이터 분석 기법 연구)

  • Jung-Youl Choi;Jae-Min Han;Dae-Hui Ahn;Jee-Seung Chung;Jung-Ho Kim;Sung-Jin Lee
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.1
    • /
    • pp.685-690
    • /
    • 2023
  • It was analyzed that the volume of deep excavation works adjacent to existing underground structures is increasing according to the population growth and density of cities. Currently, many underground structures and tracks are damaged by external factors, and the cause is analyzed based on the measurement results in the tunnel, and measurements are being made for post-processing, not for prevention. The purpose of this study is to analyze the effect on the deformation of the structure due to the excavation work adjacent to the urban railway track in use. In addition, the safety of structures is evaluated through machine learning techniques for displacement of structures before damage and destruction of underground structures and tracks due to external factors. As a result of the analysis, it was analyzed that the model suitable for predicting the structure management standard value time in the analyzed dataset was a polynomial regression machine. Since it may be limited to the data applied in this study, future research is needed to increase the diversity of structural conditions and the amount of data.

Analysis of pile load distribution and ground behaviour depending on vertical offset between pile tip and tunnel crown in sand through laboratory model test (실내모형시험을 통한 사질토 지반에서 군말뚝과 터널의 수직 이격거리에 따른 하중분포 및 지반거동 분석)

  • Oh, Dong-Wook;Lee, Yong-Joo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.355-373
    • /
    • 2017
  • Tunnelling in urban areas, it is essential to understand existing structure-tunnel interactive behavior. Serviced structures in the city are supported by pile foundation, since they are certainly effected due to tunnelling. In this research, thus, pile load distribution and ground behavior due to tunnelling below grouped pile were investigated using laboratory model test. Grouped pile foundations were considered as 2, 3 row pile and offsets (between pile tip and tunnel crown: 0.5D, 1.0D and 1.5D for generalization to tunnel diameter, D means tunnel diameter). Soil in the tank for laboratory model test was formed by loose sand (relative density: Dr = 30%) and strain gauges were attached to the pile inner shaft to estimate distribution of axial force. Also, settlements of grouped pile and adjacent ground surface depending on the offsets were measured by LVDT and dial gauge, respectively. Tunnelling-induced deformation of underground was measured by close range photogrammetric technique. Numerical analysis was conducted to analyze and compare with results from laboratory model test and close range photogrammetry. For expression of tunnel excavation, the concept of volume loss was applied in this study, it was 1.5%. As a result from this study, far offset, the smaller reduction of pile axial load and was appeared trend of settlement was similar among them. Particulary, ratio of pile load and settlement reduction were larger when the offset is from 0.5D to 1.0D than from 1.0D to 1.5D.

A study on the applicability of under ground structure using steel tubular roof in Korean geotechnical condition (대구경강관을 이용한 지하구조물 축조공법의 국내지반 적용성 연구)

  • Lee, Young-Bock;Kim, Jeong-Yoon;Park, Inn-Joon;Kim, Kyong-Gon;Lee, Jong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.4
    • /
    • pp.401-409
    • /
    • 2003
  • Recently, the development of underground structures is to be inevitably necessary due to the increase in population and traffic volume that has caused to the limit of urban land use and the heavy traffic jams. Therefore, underground structures such as subway, underground shopping centers, lifeline facilities and so on, have been increasingly constructed, On the other hand, several social problems have occurred during construction, i.e., ground subsidence, noise, and vibration. Therefore, safer and more beneficial methods for underground construction are on the demand. In this research, N.T.R.(New Tubular Roof) method has been modified and utilized for solving those problems and overcoming the difficulties connected with the bored tunnel construction of large underground openings in unfavorable ground, often under the water table, and with overburdens that are too shallow to solve problems of stability using traditional methods. The N.T.R. method has been modified to suit for Korean geotechnical conditions, and was made up for the weak points-the water leakage from walls and tops, the maintenance and the lack of stability-of the conventional methods. This paper dealt with the features and the applicability of N.T.R. Method based on the results from numerical analysis and data from in-situ monitoring system.

  • PDF

Case Study of Immersed Tunnel Instrumentation Management Using Wireless System (지중무선 시스템을 이용한 침매터널 구간 계측관리 사례연구)

  • Han, Sang-Wook;Kim, Byung-Hee;Han, Byung-Won;Lee, Gye-Chun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.768-773
    • /
    • 2009
  • Measuring method being applied for off-shore works is performed by using data logger or manual measuring instrument with wiring the cable connected from the sensor up to the position where measuring is allowed.(upper part of embankment or marine structure) Measuring management by using existing measuring method may be acceptable on the condition that the ground deformation volume(vertical, horizontal) is generally minimal and the site condition is good. But loss of measuring instrument, sensor cable failure or cutting is taken place frequently due to significant change of ground behavior caused by an external force change(embankment, excavation) under very soft ground condition(N value below 0-4). In case of the marine works, in particular, loss rate of measuring instrument is highly represented due to the factors of working barge anchoring, constructional interference and natural disaster. In order to solve these problems, measuring management was performed with employing underground wireless system at the immersed tunnel site. Measuring data was obtained freely under the marine environment by using underground wireless communication and cable cutting potential by ground behavior could be reduced. Measuring cost savings and its installation convenience were maximized by way of off-shore tower installation or cabling and by minimizing constructional interference of off-shore working barge. This case of measuring management was accomplished successfully.

  • PDF

Dynamic response of middle slab in double-deck tunnel due to vehicle load (차량하중에 의한 복층터널 중간슬래브의 동적 응답)

  • Kim, Hyo-Beom;Kwak, Chang-Won;Park, Inn-Joon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.5
    • /
    • pp.717-732
    • /
    • 2017
  • Recently, the construction of underground structure such as a double-deck tunnel is increasing to manage rapid growth of roadway traffic volume. Double-deck tunnel includes middle slab to separate upper and lower road inside, and various sources affect the dynamic behaviour of middle slab due to dynamic loading of vehicle. Therefore, it is important to investigate the dynamic response of middle slab precisely to apply it to design and analysis of double-deck tunnel. In this study, dynamic analysis model of middle slab considering structural type, design velocity, vehicle load, and surface roughness, etc. is built. 3-dimensional dynamic analysis is performed to assess dynamic response of middle slab. Consequently, Dynamic Magnification Factor which represents dynamic response of middle slab shows maximum in case of elastomeric bearings (EB) and average roughness (Grade C). It is also expected that dynamic response can be reduced under the condition of good roughness (Grade B) and fixed bearings (FB).

Structure damage estimation due to tunnel excavation based on indoor model test

  • Nam, Kyoungmin;Kim, Jungjoo;Kwak, Dongyoup;Rehman, Hafeezur;Yoo, Hankyu
    • Geomechanics and Engineering
    • /
    • v.21 no.2
    • /
    • pp.95-102
    • /
    • 2020
  • Population concentration in urban areas has led traffic management a central issue. To mitigate traffic congestions, the government has planned to construct large-cross-section tunnels deep underground. This study focuses on estimating the damage caused to frame structures owing to tunnel excavation. When constructing a tunnel network deep underground, it is necessary to divide the main tunnel and connect the divergence tunnel to the ground surface. Ground settlement is caused by excavation of the adjacent divergence tunnel. Therefore, predicting ground settlement using diverse variables is necessary before performing damage estimation. We used the volume loss and cover-tunnel diameter ratio as the variables in this study. Applying the ground settlement values to the settlement induction device, we measured the extent of damage to frame structures due to displacement at specific points. The vertical and horizontal displacements that occur at these points were measured using preattached LVDT (Linear variable differential transformer), and the lateral strain and angular distortion were calculated using these displacements. The lateral strain and angular distortion are key parameters for structural damage estimation. A damage assessment chart comprises the "Negligible", "Very Slight Damage", "Slight Damage", "Moderate to Severe Damage", and "Severe to Very Severe Damage" categories was developed. This table was applied to steel frame and concrete frame structures for comparison.

The required performance of the super flowing concrete for LNG (LNG tank용 초유동 콘크리트의 배합설계)

  • 권영호;전성근;백승준;이용일;김무한
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.04a
    • /
    • pp.463-468
    • /
    • 1999
  • The slurry wall of Inchon LNG receiving terminal tank will be planned the super flowing concrete having properties of high strength (required strength 520kg/$\textrm{cm}^2$), no-vibrating and massive structure in the underground. For the performance of this concrete, we investigate and select all materials, the optimum mix design and sensibility test in the laboratory. As test results, we choose portland blast-furnace slag cement and lime stone powder(L.S.P) as cementitious materials, W/C 41%(W/B 35.4%), S/a 50.8% and unit volume of coasre aggregate 0.30 as optimum mix design. Also test result of the fresh and hardened concrete are satisfied with specifications of slurry wall.

  • PDF

Geometry and Volume Fraction of Polypropylene Fiber in Cement Based Composites for Fire Resistnace (시멘트 복합체의 내화성능 향상을 위한 폴리프로필렌 섬유의 형상과 혼입량 결정)

  • Won, Jong-Pil;Park, Kyung-Hoon;Kim, Hwang-Hee;Kim, Jungg-Hoon;Lee, Su-Jin;Lee, Si-Won
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2006.05b
    • /
    • pp.397-400
    • /
    • 2006
  • The addition of polypropylene fibers is effective to avoid spalling of shotcrete and concrete adopted tunnel and underground structure under the fire. In this study, a cement based mortar for fire resistance of polypropylene fiber was developed and evaluated by experimentally. The geometry and amount of polypropylene fibers which are diameter, length and fiber dosage were significant factors in aspect of the response values of fire resistance.

  • PDF