한국정보디스플레이학회 2007년도 7th International Meeting on Information Display 제7권1호
/
pp.520-523
/
2007
In this paper, we present a novel method to minimize flicker and gray scale errors automatically across the entire panel by using a compensation of the gray levels of image. It was realized by image simulation with feedback structure. As a result of simulation, we observed flickers from the simulated image. And we compensated the gray scale levels for original image. The compensated gray scale levels correspond to flickers which are generated by difference of pixel voltage in odd and even frame. And we simulated repetitively the compensated image by our block diagram for reduction flicker. Consequently, we confirmed flickers have been decreased more than 87%. Furthermore, our method provides visualization and valid prediction for improvement of TFT-LCD panel
Voltage quality problems such as voltage sag, swell, flicker, undervoltage, and overvoltage have been of great concern for both utilities and customers over the last decade. In this paper, a new approach based on the $H_{\infty}$ algorithm to monitor voltage disturbances is presented. The key idea of this approach is to estimate the amplitude of the fundamental component of distorted and noisy voltage waveform instantaneously, and then the information can be extracted from the estimated envelope to identify and classify different voltage related power quality problems. The $H_{\infty}$ algorithm is characterized by a fast tracking, unlike that of existing techniques. The $H_{\infty}$ algorithm outperforms the Kalman Filter (KF) by its fast convergence and robust tracking performance against non-Gaussian noise. The paper investigates the effects of various types of noise on the performance of the $H_{\infty}$ algorithm. Digital simulation results confirm the validity and accuracy of the proposed method. The proposed $H_{\infty}$ algorithm is examined by tracking the flicker produced by a resistance welder simulated in the PSCAD/EMTDC package.
LED(Light Emitting Diode) is a semiconductor device utilizing electroluminescent effect is a phenomenon in which a type of P-N junction diode, the light of short wavelength which a voltage is applied in the forward direction is released. LED is advantageous in reducing the energy as environmentally materials that can greatly reduce the carbon emissions, recent it has attracted attention IT(Information Technology) and GT(Green Technology) industry. In addition, there are advantages long life, high efficiency, and excellent response speed, LED have come into the spotlight as the illumination means to replace the existing fluorescent light and incandescent light bulb. When connecting to MR16 electronic transformer for existing LED driver circuit, due to malfunction of the dimmer and the electronic transformer, flicker occurs and linear dimming is not possible. Therefore, in this paper, we suggest an LED drive circuit there is no flicker with the corresponding dimming MR16 electronic transformer. Further, we explain the principles of the LED current control technique and the principle of the drive circuit of the LED, in order to validate the proposed circuit through prototyping and simulation.
Modeling of the three phase electric arc furnace and its voltage flicker mitigation are the purposes of this paper. For modeling of the electric arc furnace, at first, the arc is modeled by using current-voltage characteristic of a real arc. Then, the arc random characteristic has been taken into account by modulating the ac voltage via a band limited white noise. The electric arc furnace compensation with static VAr compensator, Thyristor Controlled Reactor combined with a Fixed Capacitor bank (TCR/FC), is discussed for closed loop control of the compensator. Instantaneous flicker sensation curves, before and after accomplishing compensation, are measured based on IEC standard. A new method for controlling TCR/FC compensator is proposed. This method is based on applying a predictive approach with closed loop control of the TCR/FC. In this method, by using the previous samples of the load reactive power, the future values of the load reactive power are predicted in order to consider the time delay in the compensator control. Also, in closed loop control, two different approaches are considered. The former is based on voltage regulation at the point of common coupling (PCC) and the later is based on enhancement of power factor at PCC. Finally, in order to show the effectiveness of the proposed methodology, the simulation results are provided.
In Korea, the low voltage secondary distribution method comprises lots of the maintainable and conservative problems. So, this paper deals with the plans to solve and decide the unification of the low voltage secondary. That is ; for the unification plan of the low voltage secondary must be previously solved the breaking of netural line in $3{\phi}4W$, $1{\phi}3W$ and enacted the flicker criteria in distribution power system. To decide the low voltage secondary should take into considersion by economics, security and future. The flicker fluctuation in the low voltage secondary 7.4% in responsibility limited place and under 10% in Arc welding. To prevent the netural line in $3{\phi}4W$, $1{\phi}3W$ must be thoroughly constructructed, joined the two sleeves.
Power quality simulation plays an important role in many practical cases, for example, when deciding the capacity of the related mitigation devices, assessing the influence of installing a nonlinear load in the distribution part, dissolving the quality issues between utilities and customers, and so on. For these purposes, many dedicated tools have been used in order to assess the level of quality distortions by various kinds of PQ indices. However, there are few modules that can accurately simulate the flicker phenomenon, that is, $P_{st}$ and the nonlinear and chaotic behavior of the electrical arc furnace, which is one of the representative nonlinear loads. This paper deals with the useful and simple modules for the voltage flicker simulation in the distribution and transmission level under the environment of Matlab/Simulink. With these modules, the various conditions of distribution systems and the capacities of arc furnaces with the chaotic characteristic can be easily taken into account.
Light Flickering of the lamp(fluorescent lamp) with voltage fluctuation operates as an factor harmful to train passengers which is subjective to them. Recently, international flickering standard(IEC61000-3-3) are applied all over the world. However, there are not any study preparing for regulation about light flickering inside running train. In this study, the Flicker phenomenon is investigated from several references and also how the flickermeter is configured and defined. Flicker evaluation using it are studied.
The reference impedances which is about 95% supply impedance value of residential consumers' supply impedances was published by IEC in 1980. The reference impedances are the standard values for use in determining the voltage disturbance characteristics of electrical equipment like the flicker. In IEC 60725, the reference impedances for premises having service current capacities less than 100A per phase and for service current capacities more than 100A per phase are recommended. And these reference impedances are targeted for the countries using 50Hz power frequency. Because of the frequency difference, the reactance values of the reference impedances will be increased in 60Hz power system like Korea, And also the reference impedances are different significantly each other according to declared voltage variation, power consumption and service wire length etc. Therefore It is needed to calculate the reference impedances suitable for domestic low-voltage power system. In this paper, the reference impedances for service current capacities less than 100A in 220/380V, 60Hz single-phase two wire and three-phase four wire low-voltage system are calculated, And the equations for service current capacities more than 100A to calculate the modulus value of maximum supply impedances are suggested base on IEC 60725 and the reference impedances for those are calculated on service current of 100A per phase.
As a method of confirming light flickering, we tried to confirm the flicker index measured by Flickermeter and the application possibility by using digital intensity of illumination meter. Also, after simulating the quality deterioration of electric power and generating a various voltage change, we studied on the function between the flicker index measured by Flickermeter and the flicker index for the intensity of illumination by using digital intensity of illumination meter.
본 논문에서는 국내 최초로 설치된 Custom Power기기인 배전용 STATCOM(STATic COMpensator)의 기기 신뢰성 확보를 위힌 기가 테스트 및 설계통 운전 분석결과를 보이고 있다. Custom Power는 유연송전시스템(FACTS : Flexible AC Transmission System)과 같이 교류전력계통을 제어함으로써 효율적이고 유연한 전력계통의 운용과 구성을 목적으로 한다. STATCOM은 Custom Power기기의 한 형태로 무효전력 보상, 전압조정, 그리고 전압 퓰리커 억제 등의 기능을 가진다. 본 논문에서는 STATCOM 시운전 결과 무효전력과 역률 보상에서 우수한 성능을 보임을 확인할 수 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.