• Title/Summary/Keyword: vertical construction joint

Search Result 73, Processing Time 0.031 seconds

A Study on the Application of Vertical Welding Process to the Shipbuilding with High Deposition Rate (대입열 수직상진 용접의 조선적용에 관한 연구)

  • Park, Chul-Sung;Son, Young-Rak;Lee, Jeong-Soo
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.44 no.5
    • /
    • pp.482-487
    • /
    • 2007
  • The container mobilization of material resources has increased continually owing to international economy growth and overseas trade increase in recent years. There are large amounts of order received for container carriers which are the biggest in the world ranging from 8,000 TEU to 10,000 TEU or above The very large container carriers have minimum thickness of sheer strake, upper deck and hatch coaming about $65mm{\sim}90mm$. Therefore, this study is performed in order to develop vertical welding process with high deposition rates applicable to thick plate above 65mm thickness. Electrogas welding process with 1 pole and 2 poles has been developed to apply to vertical joint with thick plates in the shipyard. In this paper, it was explained that the relationship of cross section to various groove types and executed that electrogas welding for thick plates. The mechanical tests were carried out to verify the soundness and effectiveness of EGW.

Thermal Cracking Control of Mass Concrete by Vertical Pipe Cooling Method (연직파이프쿨링 공법에 의한 매스콘크리트 온도균열 제어)

  • Seo, Tae-Seok;Lim, Chang-Keun;Cho, Yun-Gu
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.2 no.3
    • /
    • pp.233-238
    • /
    • 2014
  • In case of the slender mass concrete like attached wall, retaining wall and bridge tower, the low heat cement and the control joint are mainly used for thermal cracking control. However, even if these cracking control methods are considered, it is impossible to control thermal cracks perfectly, because the external restraint is largely in these mass concrete. Because these cracks occurring in slender mass concrete members almost penetrate concrete member, the special cracking control is demanded in these mass concretes. The vertical pipe cooling method improving existing pipe cooling method was developed for the active thermal cracking control of slender mass concrete, and applied at the field attached wall. In results, the maximum temperature dropped more than $10^{\circ}C$ by vertical pipe cooling method, and the cracks decreased about more than 50%.

CONSTRUCTION MANAGEMENT OF TUNNELLING IN SEVERE GROUNDWATER CONDITION

  • Young Nam Lee;Dae Young Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.655-661
    • /
    • 2005
  • For a hydro power plant project, the headrace tunnel having a finished diameter of 3.3m was constructed in volcanic rocks with well-developed vertical joint and high groundwater table. The intake facility was located 20.3 km upstream of the powerhouse and headrace tunnel of 20 km in length and penstock of 440 m in height connected the intake and the powerhouse. The typical caldera lake, Lake Toba set the geology at the site; the caving of the ground caused tension cracks in the vertical direction to be developed and initial stresses at the ground to be released. High groundwater table(the maximum head of 20 bar) in the area of well-connected vertical joints delayed the progress of tunnel excavation severely due to the excessive inflow of groundwater. The excavation of tunnel was made using open-shield type TBM and mucking cars on the rail. High volume of water inflow raised the water level inside tunnel to 70 cm, 17% of tunnel diameter (3.9 m) and hindered the mucking of spoil under water. To improve the productivity, several adjustments such as modification of TBM and mucking cars and increase in the number of submersible pumps were made for the excavation of severe water inflow zone. Since the ground condition encountered during excavation turned out to be much worse, it was decided to adopt PC segment lining instead of RC lining. Besides, depending on the conditions of the water inflow, rock mass condition and internal water pressure, one of the invert PC segment lining with in-situ RC lining, RC lining and steel lining was applied to meet the site specific condition. With the adoption of PC segment lining, modification of TBM and other improvement, the excavation of the tunnel under severe groundwater condition was successfully completed.

  • PDF

A Study on the Development of High Deposition Automatic Vertical Welding of Erection Stage in Shipbuilding (조선 탑재용접용 대입열 수직자동용접법의 개발에 관한 연구)

  • Park, Ju-Yong;Choe, Woo-Hyeon
    • Journal of Welding and Joining
    • /
    • v.26 no.5
    • /
    • pp.66-73
    • /
    • 2008
  • Welding work in pre-erection or erection stage of shipbuilding construction to be carried out in flat and vertical upward position mostly and Electrogas welding(EGW) is actively applied especially for vertical butt joint of thicker steel plate recently. In this study considered how to develope and improve mechanical properties of weld metal and HAZ in high heat input welding processes such as EGW and Electroslag welding(ESW) with its welding equipment in order to extend the application range to the longitudinal members and hatch coaming parts of container ship. Some components of welding system and parameters were modified to get the faster travel speed and reduce weld heat input, and also by adding additional filler rods or tubes increase the amount of deposited weld metal. With the test get some good date can apply to actual fabrication work and recommend items to manufacture welding materials make better. Above all things it's a fruition that to prepare the possibility of application of ESW to shipbuilding construction which fill up the gap of stoppage days of more than 20 years.

Behavior of Composite RCS Beam-Column Joint Subjected to Cyclic Loading (반복하중을 받는 철근콘크리트 기둥과 철골보 합성구조의 접합부 성능에 관한 연구)

  • Cho, Pil-Kyu;Kim, Sang-Jun;Her, Jun;Choi, Oan-Chul
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1998.10a
    • /
    • pp.577-581
    • /
    • 1998
  • Recent trends in the construction of building frame feature the increase use of composite steel concrete members functioning together in what terms of mixed structural systems. One of such systems, RCS(reinforced concrete column and steel beam) system, is known to make use of type of member in the most efficient manner to maximize the structural and economic benifits. Based on the results, joint behavior and design were described in terms of two primary modes of failure ; joint panel shear and vertical bearing. In test specimen, joint deformation is observed at internal region greater than at external region.

  • PDF

Development of DHLT Joint for Vertical Cutoff Walls in Offshore Waste Landfill Site (해상처분장 연직차수공을 위한 DHLT 이음부의 개발)

  • Hong, Young-Ho;Lee, Jong-Sub;Lee, Dongsoo;Chae, Kwang-Seok;Yu, Jung-Doung
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.3
    • /
    • pp.43-56
    • /
    • 2018
  • Vertical cutoff walls such as steel pipe sheet piles (SPSPs) have been commonly applied for the construction of the offshore waste landfill site. Because the SPSPs are sequentially installed by connecting their joints to those of adjacent piles, their mechanical stability should be ensured against the inherent external forces on the sea. The objective of this study is to evaluate the structural performances of the newly developed types of SPSP joint compared with those of other joint types. The problems of the traditional SPSP joints are investigated, and an advanced joint shape of SPSP, which is named double H with L-T (DHLT) joint, are designed for improving the constructability and maintenance. Full-scale models of the DHLT joint are manufactured, and then its joint areas are filled with grout material. After 28 days of curing time, compressive and tensile strength tests were performed on the joint models and the test results were compared with those of the traditional joints. Experimental results show that the structural capacities of the DHLT joint models are lower than those of traditional joints due to the influence of grout and steel members. In the cases of the compressive strength test, especially, bending occurs on steel H-beam with no distinct cracks in grout due to the asymmetrical structure of joint which has no reaction force. This study shows that the performance of the SPSP joint can be improved by considering the influence factors on the structural capacities estimated by the experimental tests.

Tensile Behavior of CFT Column-to-H beam Connections with External T-shaped Stiffeners (T-스티프너 보강 콘크리트충전 각형강관 기둥-H형강 보 접합부의 인장거동)

  • Kang, Chang Hoon;Shin, Kyung Jae;Oh, Young Suk;Moon, Tae Sup
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.1
    • /
    • pp.121-130
    • /
    • 2002
  • This paper presents the tensile behavior of a Concrete-Filled Square Steel Tubular (CFT) column to H-beam welded connections. These connections were externally reinforced with T-shaped stiffeners at the junction of CFT column and beam. The tensile loading tests of eighteen tee-joint connections and finite element analysis using ANSYS were carried out. The main parameters of tests are as follows: 1) the thickness of Square Steel Tubular Column : 6 mm, 9 mm, 2) the strength ratios of tensile strength of horizontal stiffeners to tensile strength of beam flange : 70 %, 100 %, 150 %, 3) the strength ratios of shear strength of vertical stiffeners to tensile strength of beam flange : 80 %, 115 %, 160 %. The results of the tests demonstrate that overall behavior and failure modes of all the specimens are governed mainly by the horizontal stiffeners rather than the vertical stiffeners, and the vertical stiffener played only a role in transferring load introduced from beam to column.

TAGUCHI OPTIMIZATION OF DISPLACEMENTS DURING THE DESIGN PHASE OF A CONSTRUCTION PROJECT

  • E.S. N. Telis;G. J. Besseris
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.721-728
    • /
    • 2007
  • The prediction of quality characteristics during the design phase of a construction project was fragmented, because no particular method exists. One of the most important key responses is the total displacements (horizontal and vertical). A brainstorming session produces the quality parameters i.e. the control factors which here are identified as: the steel joint, the pile's length, the excavation depth and angle, the distance between the piles, the anchor stretch and length to name just some of the most engaging in the design. The purpose of this study is to optimise these parameters to minimize the total displacements following a methodology based on Taguchi method. For this reason, a 2-level, L8 orthogonal array has been employed to organize the experimentation. Data is obtained from a real-life excavation project designed on the Plaxis v.8 CAE package. Taguchi analysis is performed in the statistical package Minitab.

  • PDF

Study on the horizontally perpendicular separation casting method of construction for execution improvement of the high strength concrete (시공성 향상을 위한 고강도 콘크리트 분리타설재 개발에 관한 연구)

  • Choi, Jong-Moon;Kim, Woo-Jae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.61-62
    • /
    • 2011
  • In recent years, domestic construction companies have developed a 200MPa grade high-strength concrete and promoting the superiority of each technique. However, applying design and construction practices of developed high-strength concrete are weak. Most applications is limited to partial use and then the actual examples only used as a layer of high-rise building outrigger with casting some test on basement' vertical structures. In this study, developed materials for separation casting through joint research have been examined economy and others by field application and improving the workability.

  • PDF

An Experimental Study on Flexural/Shear Load Properties of SC(Steel Plate Concrete) Structure with Reinforced Concrete Joint (강판콘크리트 구조 이질접합부의 면외 휨/면내 전단하중 특성에 관한 실험연구)

  • Lee, Kyung-Jin;Hwang, Kyeong-Min;Hahm, Kyung-Won;Kim, Woo-Bum
    • Journal of Korean Society of Steel Construction
    • /
    • v.24 no.2
    • /
    • pp.137-147
    • /
    • 2012
  • This paper describes an experimental study on the mechanical characteristic and behavior of a structure that has a joint between the reinforced concrete (RC) member and steel plate concrete (SC) member. An out-of-plane flexural test on an L-type test specimen and in-plane shear test on an I-type test specimen were carried out by means of repeated cyclic loading until their failure. Based on the results, the former showed pull-out failure mode of anchored vertical bars while the latter exhibited flexural failure mode of the basement member. These results reveal that the maximum capacity of the specimens is 96% and 82%, respectively, compared with the theoretical value.