• Title/Summary/Keyword: verification tests

Search Result 785, Processing Time 0.04 seconds

Functional Verification of 64bit RISC Microprocessor (64비트 RISC 마이크로프로세서의 기능 검증에 관한 연구)

  • 김연선;서범수
    • Proceedings of the IEEK Conference
    • /
    • 1998.10a
    • /
    • pp.755-758
    • /
    • 1998
  • As the performance of microprocessor improves, the design complexity grows exponentially. Therefor, it is very important to make the bug-free model as early as possible in a design life-cycle. This paper describes the simulation-based functional verification methodology for the RTL level description model. It is performed by multi-stage verification methods using extensive hand-generated self-checking tests supplemented with random tests. This approach is opplied to the functional verification of the GPU processor of Raptor and various bugs are detected.

  • PDF

A Study on tests process for verification of AC Traction system performance (교류 급전시스템 성능검증을 위한 시험방안에 관한 연구)

  • Jung, Ho-Sung;Lee, Ki-Won;Kim, Joo-Rak;Han, Moon-Seob;Kim, Jin-Hee
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2202-2203
    • /
    • 2011
  • AC substation of urban transit supplies a suitable AC power on electricity vehicles. AC substation is verified electrical safety of system through pre-operation inspection on electrical installations to be supplied power from KEPCO. However, because test items and method for AC traction system are unprepared on pre-operation inspection, the general safety and performance verification of AC traction system are very insufficient. Therefore this paper analyze the test examples such as factory equipment tests, factory combined tests and railway tests for the safety and performance verification of AC traction system and present a suitable test items and test standard in domestic.

  • PDF

An analysis of tests process for verification of DC Traction system performance (직류 급전시스템 성능검증을 위한 시험방안 분석)

  • Jung, Ho-Sung;Han, Moon-Seob;Jang, Dong-Uk;Lee, Ki-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.499-504
    • /
    • 2008
  • DC substation of urban transit supplies a suitable DC power on electricity vehicles by being supplied from KEPCO. DC substation is verified electrical safety of system through pre-operation inspection on electrical installations to be supplied power from KEPCO. However, because test items and method for DC traction system are unprepared on pre-operation inspection, the general safety and performance verification of DC traction system are very insufficient. Therefore this paper analyze the overseas test examples such as factory equipment tests, factory combined tests and railway tests for the safety and performance verification of DC traction system and present a suitable test items and test standard in domestic.

  • PDF

Verification of failover effects from distributed control system communication networks in digitalized nuclear power plants

  • Min, Moon-Gi;Lee, Jae-Ki;Lee, Kwang-Hyun;Lee, Dongil;Lim, Hee-Taek
    • Nuclear Engineering and Technology
    • /
    • v.49 no.5
    • /
    • pp.989-995
    • /
    • 2017
  • Distributed Control System (DCS) communication networks, which use Fast Ethernet with redundant networks for the transmission of information, have been installed in digitalized nuclear power plants. Normally, failover tests are performed to verify the reliability of redundant networks during design and manufacturing phases; however, systematic integrity tests of DCS networks cannot be fully performed during these phases because all relevant equipment is not installed completely during these two phases. In additions, practical verification tests are insufficient, and there is a need to test the actual failover function of DCS redundant networks in the target environment. The purpose of this study is to verify that the failover functions works correctly in certain abnormal conditions during installation and commissioning phase and identify the influence of network failover on the entire DCS. To quantify the effects of network failover in the DCS, the packets (Protocol Data Units) must be collected and resource usage of the system has to be monitored and analyzed. This study introduces the use of a new methodology for verification of DCS network failover during the installation and commissioning phases. This study is expected to provide insight into verification methodology and the failover effects from DCS redundant networks. It also provides test results of network performance from DCS network failover in digitalized domestic nuclear power plants (NPPs).

Shaking Table Tests of the 1/3 Scaled R/C Building with the Laminated Rubber Bearings (적층고무형 면진장치를 갖는 RC건물의 면진효과 검증 진동대 실험)

  • Kim Dong Young;Chun Young Soo;Whang Ki Tea;Chang Kug-Kwan
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2004.05a
    • /
    • pp.420-422
    • /
    • 2004
  • This paper reports the results of performance verification tests of the base isolated RC building with the laminated rubber bearings which is manufactured by Dongil Rubber Belt Co.. The shaking table tests were performed using a scaled 3-story model scaled to 1/3 of the prototype RC apartment building. Several major earthquake records were scaled to different peak ground accelerations and used as input base excitations. Through the verification tests, the validity of the applied base isolation device and the response reduction effect against earthquakes are confirmed.

  • PDF

Monte Carlo simulation for verification of nonparametric tests used in final status surveys of MARSSIM at decommissioning of nuclear facilities

  • Sohn, Wook;Hong, Eun-hee
    • Nuclear Engineering and Technology
    • /
    • v.53 no.5
    • /
    • pp.1664-1675
    • /
    • 2021
  • In order to verify the statistical performance of the nonparametric tests used in the MARSSIM approach, all plausible contamination distribution types that can be encountered in a survey area should be investigated. As the first of such investigations, this study aims to perform the verification for normal distribution of the contamination in a survey area by simulating the collection of random samples from it through the Monte Carlo simulation. The results of the simulations conducted for a total of 81 simulation cases showed that Sign test and WRS test both exhibited an excellent statistical performance: 100% for the former and 98.8% for the latter. Therefore, in final status surveys of the MARSSIM approach, a high statistical performance can be expected in applying the nonparametric hypothesis tests to survey areas whose net contamination can be assumed to be normally distributed.

A Study on the Backcalculation of Layer Moduli of Asphalt Pavement System by Contemplating the Depth to Virtual Bedrock (가상암반층의 깊이를 고려한 아스팔트 포장체의 층별 탄성계수 추정기법의 개발)

  • Kim, Soo Il;Lee, Kwang Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.13 no.4
    • /
    • pp.87-99
    • /
    • 1993
  • The computer program, MFPD, which is used to backcalculate the layer moduli of asphalt concrete pavement system is modified by contemplating the depth to virtual bedrock in this study. An algorithm to estimate the depth to virtual bedrock is developed through the analysis of FWD impulse load duration and the compression wave velocity of ground. For verification of the modified MFPD, FWD is fabricated and then FWD field tests and verification tests are carried out at the test sites. Plate loading tests and surface wave propagation tests are performed at FWD test sites. Laboratory tests (Marshall stability tests, unconfined compression tests) for sampled asphalt concrete specimens are also carried out. From comparison analysis, the validity and applicability of the modified MFPD are verified.

  • PDF

Verification Test for Primary Reactor Piping in Nuclear Power Plant (원자로 주 배관계의 진동 건전성 시험)

  • Kim, Yeon-Whan;Kim, Hee-Su;Koo, Jae-Raeyang;Bea, Yong-Chae;Lee, Hyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11b
    • /
    • pp.74-79
    • /
    • 2002
  • The piping verification tests were performed in order to verify the structural integrity during initial operation of the reactor coolant systems and the primary heat transportation systems of nuclear power plants by KEPRI in Korea. The tests were conducted at full operating temperature and pressure. The objective is to evaluate the possibility of excessive load generating on piping, piping supports, and reactor structures etc. in the steady normal operation and expected pump transient conditions. As a result, the measured vibrations have been shown acceptable level according to ASME/ANSI OMa-Standard, Part 3.

  • PDF

Verification Test for Primary Reactor Piping in Nuclear Power Plant (원자로 주 배관계의 진동 건전성 시험)

  • Kim, Yeon-Whan;Kim, Hee-Su;Koo, Jae-Raeyang;Bea, Yong-Chae;Lee, Hyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2002.11a
    • /
    • pp.315.1-315
    • /
    • 2002
  • The piping verification tests were performed in order to verify the structural integrity during initial operation of the reactor coolant systems and the primary heat transportation systems of nuclear power plants by KEPRI in Korea. The tests were conducted at full operating temperature and pressure. The objective is to evaluate the possibility of excessive load generating on piping, piping supports, and reactor structures etc. in the steady normal operation and expected pump transient conditions. (omitted)

  • PDF

Development of Removable Soil Nail (제거식 쏘일 네일 개발 및 성능 평가)

  • Kim, Nak-Kyung;Kim, Sung-Kyu;Kim, Ung-Jin;Kim, Woong-Kyu;Cho, Kyu-Wan;Sin, Sang-Hoon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.896-901
    • /
    • 2009
  • A Soil Nail is a structural element which provides load-transfer to the ground in excavation reinforcement applications. The nail may simply consist of a steel tendon, but most commonly the tendon is encapsulated in a cement grouted body to provide corrosion protection and improved load- transfer to the ground. For temporary excavation support in a congested urban area, the steel bar of Soil Nails should be removed to get permission of the private land to install Soil Nails. Several removable nail systems were developed and evaluated by pull-out load tests. The Soil Nail pull-out tests were performed on five nails installed in soft and hard rock at a 00 housing-redevelopment area in seoul. Two nails are plastic socket type and two are complex socket type mixed steel and plastic. The nail was 0.1mm in diameter, 4m long. In this study verification tests, and steel bar removing tests of plastic socket type nails and complex socket type nails were performed and presented.

  • PDF