1 |
W. Sohn, M. Jeong, K. Jeong, Theoretical comparative study ofttests and nonparametric tests for finalstatus surveys of MARSSIM at decommissioning sites, Ann. Nucl. Energy 135 (2020) 1-9.
|
2 |
R.E. Walpole, R.H. Myers, S.L. Myers, K. Ye, Probability & Statistics for Engineers & Scientists, Nine Edition ed., Pearson, 2012.
|
3 |
IAEA, Release of Sites from Regulatory Control on Termination of Practices, Safety Guide No. WS-G-5.1, 2006.
|
4 |
U.S NRC, A Proposed Nonparametric Statistical Methodology for the Design and Analysis of Final Status Decommissioning Survey. NUREG-1505, 1998. Washington, D.C.
|
5 |
U.S. Nuclear Regulatory Commission, Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). NUREG-1575, Rev. 1, 2000. Washington, D.C.
|
6 |
U.S NRC, Manual for Conducting Radiological Surveys in Support of License Termination, NUREG/CR-5849, 1992.
|
7 |
E.W. Abelquist, Decommissioning Health Physics: A Handbook for MARSSIM Users, second ed., Taylor & Francis, 2014.
|
8 |
EPRI, Technical Bases for the Development and Application of Derived Concentration Guidelne Levels for Decommissioning and License Termination of Nuclear Power Plants, 1025315, 2012.
|
9 |
OECD/NEA, Release of Sites of Nuclear Installations, 2005.
|
10 |
EPRI, Final Status Survey and Site Release Experience Report, 1015500, 2008.
|
11 |
Connecticut Yankee Atomic Power Company, Final Status Survey Final Report Phase VII, Haddam Nect Plant, 2007.
|
12 |
ZionSolutions, Zion Station Restoration Project Final Status Survey Release Record-Unit 2 East & West Steam Tunnel Valve Houses Survey Units 06215 & 06215, 2019.
|
13 |
W. Sohn, H.-W. Seo, K. Jeong, An approach for determining reasonable sample sizes of MARSSIM final status surveys in decommissioning of nuclear facilities, Ann. Nucl. Energy 131 (2019) 378-384.
DOI
|