• 제목/요약/키워드: urgent order

검색결과 522건 처리시간 0.026초

시스템 LSI 반도체 FAB의 납기만족을 위한 예약 기반의 디스패칭 룰 (Reservation based Dispatching Rule for On-Time Delivery in System LSI Semiconductor FAB)

  • 서정철;정용호;박상철
    • 한국CDE학회논문집
    • /
    • 제19권3호
    • /
    • pp.236-244
    • /
    • 2014
  • Presented in the paper is a reservation based dispatching rule to achieve the on-time delivery in system LSI (large scale integrated circuit) semiconductor fabrication (FAB) with urgent orders. Using the proposed reservation based dispatching rule, urgent lots can be processed without waiting in a queue. It is possible to achieve the on-time delivery of urgent orders by reserving a proper tool for the next step in advance while urgent lots are being processed at the previous step. It can cause, however, tardiness of normal lots, because the proposed rule assign urgent lots first. To solve this problem, the proposed rule tries to find the best tool for the reservation in the tool group, which can minimize idle time, and the reservation rule is applied at all tools except for photolithography tools (bottleneck). $MOZART^{(R)}$ which is developed by VMS solutions are used for simulation experiments. The experimentation results show that the reservation based dispatching rule can achieve the on-time delivery of normal lots as well as urgent lots.

Performance Evaluation of Reserved Capacity for Due Date Promising

  • Seung J. Noh;Rim, Suk-Chul
    • 한국시뮬레이션학회:학술대회논문집
    • /
    • 한국시뮬레이션학회 2001년도 The Seoul International Simulation Conference
    • /
    • pp.435-439
    • /
    • 2001
  • In many make-to-order production systems customers ask due date confirmed and kept. Unexpected urgent orders from valuable customers often requires short lead times, which causes existing orders in the production schedule to be delayed so that their confirmed due dates cannot be met. This Imposes significant uncertainty on the production schedule in a supply chain. In this paper, we propose a new concept of capacity reservation as a viable tool for due date promising and suggest its operational alternatives. Simulation results show that the reserved capacity scheme appears to outperform simple FCFS scheduling policy in terms of the number of valuable urgent orders accepted and total profit attained.

  • PDF

Capacity Reservation for Due Date Promising : A Conceptual Framework

  • Seung J. Noh;Suk-Chul Rim
    • 산업경영시스템학회지
    • /
    • 제24권64호
    • /
    • pp.53-62
    • /
    • 2001
  • In make-to-order manufacturing, if orders are processed and promise first-served base, then the urgent orders from important customers in .practice, orders are not confirmed upon receipt; and delayed as uncertainty of due date causes significant waste of cost and time. propose a new concept of reserved capacity as an alternative to accommodate the urgent orders from important customers, while the due dale of all of orders arrival; and suggest a flew operational policies.

  • PDF

SCM을 위한 납기확약기반 생산계획 및 수주시스템 (Production Planning and Order Receiving System for Capable-To-Promise in Supply Chain Management)

  • 김내헌;노승종;왕지남;임석철
    • 산업공학
    • /
    • 제13권3호
    • /
    • pp.396-404
    • /
    • 2000
  • For most order-based production, it is important to meet urgent orders from important customers while maintaining high on-time delivery rate for successful supply chain management. In this paper, we propose an approach and a structure of planning system to implement Capable-To-Promise which promises the delivery time to the received order. We suggest and compare a few alternative order receiving policies for CTP.

  • PDF

무선 센서 네트워크를 위한 에너지 효율적인 데이터 인지 라우팅 프로토콜 (Energy-Efficient Data-Aware Routing Protocol for Wireless Sensor Networks)

  • 이성협;금동원;이강원;조유제
    • 전자공학회논문지CI
    • /
    • 제45권6호
    • /
    • pp.122-130
    • /
    • 2008
  • 센서 네트워크의 많은 응용분야에서 센서 노드가 감지하는 데이터는 긴급성에 따라 크게 일반 데이터와 긴급 데이터로 분류할 수 있다. 주기적인 상황 모니터링과 같은 일반 데이터는 손실이나 지연을 어느 정도 허용할 수 있는 반면에, 화재 경보와 같은 긴급 데이터는 손실 없이 실시간적으로 전달이 이루어져야 한다. 본 논문에서는 이와 같은 데이터의 특성에 따라, 긴급 데이터의 전달 신뢰도를 높이면서 일반 데이터 전달의 에너지 효율을 고려한, 무선 센서 네트워크를 위한 에너지 효율적인 데이터 인지 라우팅 프로토콜을 제안한다 제안한 방안은 크게 두 가지 아이디어로 되어 있다. 첫째, 긴급 데이터에 대한 네트워크 생존율과 신뢰도를 향상시키기 위해, 각 센서 노드는 자신의 배터리 잔여량이 임계치 이하로 떨어지면 긴급 데이터만 전달하게 된다. 둘째, 긴급 데이터에 대한 전달 신뢰도를 높이고, 일반 데이터 전달의 에너지 소모를 줄이기 위해 데이터 종류에 따라 차별화된 전달 방법을 사용한다. 규칙적으로 발생하는 일반 데이터는 에너지 효율성을 증가시키기 위해 단일 경로 기반의 데이터 전달 방안을 사용하며, 긴급 데이터는 높은 신뢰성을 보장하기 위해 방향성 플러딩 방법을 사용해 싱크로 전달한다. 시뮬레이션을 통해 제안 방안이 긴급 데이터 전송에 있어 높은 신뢰성을 보장하면서, 일반 데이터 전달의 에너지 소모를 줄여 네트워크 생존율을 크게 증가시킬 수 있음을 보였다.

요양병원 인증 2주기 당면과제 및 해결방안 (Urgent problems and solution strategies in 2nd cycle of long-term care hospital accreditation)

  • 김경숙
    • 한국병원경영학회지
    • /
    • 제21권3호
    • /
    • pp.65-70
    • /
    • 2016
  • The Long-Term Care Hospital (LTCH) accreditation system was initiated in 2013 in the form of mandatory accreditation system in order to improve patient safety and the quality of medical service at LTCHs. By June 2016, the accredited LTCHs were 76.2%. This research was conducted to review the implementation process in the first cycle and to promote development of the second cycle of LTCH accreditation system. There are some changes which reinforced the accreditation standards, accreditation survey, and public access to accreditation results in order to strengthen patient safety in the first cycle LTCH accreditation system. LTCHs which participated in the accreditation system achieved certain outcomes in respect to patient safety and employee satisfaction. However, there are several urgent problems in placement criteria of night duty health care providers, reinforcement plans in the accreditation system, and incentives for accredited hospitals. In order to solve these problems, the most important thing is to clearly recognize the fact that the healthcare accreditation system is not the means for control and regulate hospitals but a system to induce hospitals to continue to strive for improvements in patient safety and medical service quality. In addition, it is required that LTCHs, accrediting agency and the Ministry of Health and Welfare compromise and cooperate to seek solutions every time issues related to the accreditation system arise.

대형선망어업의 생산력 재편과 경영 개선 과제 (The Study on the Reorganization of the Large Purse Seine Fisheries in Korea)

  • 김대영
    • 수산해양교육연구
    • /
    • 제21권3호
    • /
    • pp.373-389
    • /
    • 2009
  • The aims of this study are to examine urgent problems for reorganization into future-proof large purse seine fisheries in order to positively cope with rapidly changing domestic and foreign fisheries circumstances. First, this paper provides current situations of the large purse seine fisheries. The current situations of it are composed of fisheries influence such as vessel number, vessel power, and fisher number, use of resource and fishing places, and changes in products and sales of species caught by the large purse seine. Secondly, this paper reviews current problems of the large purse seine fisheries including cost reduction and increase of value added. Thirdly, this paper suggests basic development direction and countermeasures for strengthening competitiveness of the large purse seine fisheries. In conclusion, urgent problems of the larger purse seine fisheries can be summarized as inefficiency of distribution structures and retarded landing system and facilities as well as the worse of profitability according to shrink of fishing places, reduction of products, lack of workers, and increase in oil price. To solve the urgent problems, the large purse seine fisheries should be changed into an industry with low cost and high efficiency, and also need to introduce of new production system, strengthen autonomous management of natural resource, and increase in value added to products.

긴급치료격리병동의 평면유형 (A study on the Types of Urgent Isolation Ward)

  • 이현진;권순정
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제28권4호
    • /
    • pp.61-69
    • /
    • 2022
  • Purpose: In response to the rapid spread of COVID-19 in 2020, the government supported facilities and equipment through the 'Urgent Isolation Ward Expansion Project'. Design and remodeling of efficient negative pressure isolation facilities had to be done in a short period of time, and the performance gap between facilities was very large because the types of hospitals and wards of existing medical facilities were diverse. In order to secure the stability of isolation wards between medical facilities and reduce the facility gap, guidelines for planning isolation wards considering the diversity of each hospital should be appropriately presented. In consideration of these points, this study aims to provide basic data for future remodeling guidelines for each plan type of the negative pressure isolation ward first. Methods: We analyzed the plans before and after the change of 13 case hospitals that performed the urgent care bed expansion project for COVID-19 confirmed patients. Before the remodeling, the current status of the facility was analyzed according to the type of corridor, the location of the nursing station, and the location of the elevator. After remodeling, the flow of medical staff and patients, the flow of entry and exit of clean and contaminated items, and the space of negative pressure and non-negative pressure areas. Results: The ward type was divided into three types according to the corridor type and room arrangement: double loaded corridor type with two side wards, race track type with one side ward, and race track type with two side wards. Based on these three types, the standard floor plan type of the isolation ward was proposed in terms of the location of the elevator bank and Nurse station. Implications: When the existing general ward is converted into a negative pressure isolation ward, this study can be a basic data to present customized guidelines for each ward type.

일반병실을 음압격리병실로 전환 시 병실 전환 방식에 관한 연구 - 국가지정입원치료병상과 긴급치료병상을 중심으로 (A Study on the Room Conversion Type when Converting a Patient Bed-Room into a Negative Pressure Isolation Room - Focused on Nationally designated Isolation Wards and Urgent Isolation Wards)

  • 김지윤;이현진;권순정
    • 의료ㆍ복지 건축 : 한국의료복지건축학회 논문집
    • /
    • 제29권4호
    • /
    • pp.29-35
    • /
    • 2023
  • Purpose: The 2015 Middle East Respiratory Syndrome (MERS) outbreak and the recent COVID-19 pandemic have highlighted the lack of negative pressure isolation rooms and the fragility of the healthcare system. The need for healthcare facility transformation for respiratory infectious diseases has become more prominent due to COVID-19, and the purpose of this study is to provide a foundation for the rapid, economical, and safe construction of negative pressure isolation wards. Methods: This study analyzes the current status of hospitals that have been converted to negative pressure isolation rooms, and provides architectural plans and examples to provide a reference for bedroom change. Research data of this study have been obtained by analyzing the drawings of negative pressure isolation wards of nationally designated inpatient treatment beds and urgent isolation beds. In addition, the relevant literature of urgent isolation beds has been analyzed to derive bedroom change type. Result: In this study, a total of 21 isolation bed conversion methods have been presented. Implications: In order to change efficiently from a general ward to an isolation ward, it is necessary to consider the actual hospital's infectious disease transmission patterns and facility conditions.

전문가 시스템을 이용한 Job Shop 일정계획 (An Expert System for Job Shop Scheduling)

  • 오승준
    • 산업융합연구
    • /
    • 제1권2호
    • /
    • pp.69-79
    • /
    • 2003
  • In order to solve scheduling, many techniques including optimization and heuristics methods have been proposed. However, these conventional approaches are usually inadequate to obtain a satisfactory solution because of a NP-Complete which requires extensive computation effort. The aim of this paper is to develop an expert system for job shop scheduling using an AI technique. Through this system, the user can choose one of several performances. If one performance is chosen, then the system solves a scheduling in order to satisfy that performance. Then, this system decides urgent job. This system can utilize production resources efficiently and minimize work-in-process inventories and tardy jobs.

  • PDF