• 제목/요약/키워드: urban rock

검색결과 238건 처리시간 0.024초

도심지 NATM 터널에서의 계측관리시스템 적용 연구 (Application of the Measurements Control System to NATM Tunnel Constructed in Urban Area)

  • 장정범;김용일;김영근;정한중
    • 터널과지하공간
    • /
    • 제5권3호
    • /
    • pp.193-204
    • /
    • 1995
  • Since the significance of measurements during tunnel construction is not recognized, measurements have not been implemented except for a few very important construction site. As the tunnel construction by NATM increases, the importance of measurements is being emphasized. But, due to the lack of practical experiences and theoretical background in measurements techniques, systematic measurements control system has not yet been established. In this study a measurements control system, successfully used in the urban tunnel construction, is introduced.

  • PDF

선균열공법을 활용한 고강도 암반구간 로드헤더 굴진효율 향상방안 연구 (The Improvement of Excavation Efficiency of Roadheader by Using Pre-Cracked Method in High Strength Rock)

  • 김형렬;정상준;강준호
    • 터널과지하공간
    • /
    • 제33권3호
    • /
    • pp.141-149
    • /
    • 2023
  • 근래 들어 도심지 지하공간에 대한 수요가 증가함에 따라 도심지 터널계획이 활발히 진행되고 있다. 특히 로드헤더 굴착공법은 도심지 터널에 대한 적용성이 우수하여 적용사례가 증가하고 있다. 그러나 로드헤더 굴착공법은 일축압축강도 100 MPa 이상인 고강도 암반구간에 대한 굴착효율이 저하되는 한계가 있는 것으로 알려져 있다. 이에 따라 본 연구에서는 고강도 암반구간에 대한 로드헤더 굴착효율 개선방안으로 선균열공법을 제안하고 적용성을 평가하였다. 이를 위해 일축압축강도와 RQD를 함께 고려하여 순굴착속도를 산정할 수 있는 Bilgin 예측식을 활용하여 순굴착속도를 평가하였다. 동일한 일축압축강도인 암반조건에서 RQD가 감소할수록 순굴착속도가 증가하는 것으로 나타났다. 이는 고강도 암반에서 절리가 증가할수록 로드헤더 굴착효율이 증가하는 것으로 판단된다. 또한 현장시험을 통해 고강도 암반구간에 대한 선균열공법의 현장 적용성을 검증하였다. 균열유도공을 중심으로 균열대가 형성되는 것을 확인할 수 있었으며, 이를 통해 고강도 암반구간에 선균열공법 적용이 가능할 것으로 판단된다.

깊은 굴착에서 파쇄대를 갖는 연암 및 경암 지층의 지반 거동분석 사례연구 (Case Study of Ground Behavior Analysis of Soft and Hard Rock Layers with Fractured Zones in Deep Excavation)

  • 김성욱;한병원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 춘계 학술발표회 초청강연 및 논문집
    • /
    • pp.521-532
    • /
    • 2008
  • Supporting system design and construction management for the soft and hard rock layers with fractured zones are very important theme for the safety of temporary retaining wall, surrounding ground and structures in the urban deep excavation for the construction of subway, railway, building etc. The prevailing design method of supporting system for the soft and hard rock layers in the deep excavation is mostly carrying out by simplification without proper consideration for the characteristic of rock discontinuities. Therefore the behaviors of rock discontinuities and fractured zones dominate the whole safety of excavation work in the real construction stage, serious disaster due to the failure of temporary retaining wall can be induced in the case of developing large deformations in the ground and large axial forces in the supporting system. This paper introduces examples of deep excavation where the soft and hard rock layers with fractured zones were designed to be supported by shotcrete and rock bolt, deformations of corresponding ground and supporting systems in the construction period and increments of axial force in the upper earth anchors and strut due to the these deformations were investigated through detailed analysis of measurement data, the results were so used for the management of consecutive construction that led to the safe and economical completion of excavation work. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF

급팽창 금속혼합물을 이용한 나노프라즈마 바위 파쇄공법에 관한 연구 (A Study on the Nano-Plasma Rock Breaking Blasting Method Using Rapidly Expansive Metal Mixture)

  • 김성국;안명석;조명찬
    • 화약ㆍ발파
    • /
    • 제23권3호
    • /
    • pp.57-74
    • /
    • 2005
  • 옛날에는 거대한 바위를 제거하기 위해서는 다이나마이트 등의 폭약을 사용하여 폭파개념의 발파를 해왔다. 그러나 도심지에서 지하철굴착, 건물기초굴착, 택지조성 등을 위해서는 폭파개념의 굴착은 곤란하다. 건설교통부 암발파설계 및 시험발파 잠정지침(안)에서는 0.3cm/sec(센티세크)를 진동안전기준치로 하였을 때 $25\~120m$ 이격거리에서는 TYPE I의 암파쇄굴착공법에서 TYPE IV의 진동제어중규모 발파공법을 권장하고 있다. 본 논문은 25m이내 지역의 최근접 암파쇄굴착공법(TYPE I)적용 최적공법인 나노프라즈마 공법을 소개하고자 한다. 나노프라즈마 공법을 적용하여 도심지 바위를 파쇄할 때 15m거리에서 기존의 미진동발파공법의 절반 진동수준인 0.1cm/sec가 예상되는 획기적인 공법이다.

도심지 대심도 암반굴착공사에서의 자동계측 활용에 의한 붕괴방지 사례 (A Stability Case on the Deep Rock Excavation Site in Urban Area by Automatic Monitoring System)

  • 김태섭;조남신;정창원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1433-1437
    • /
    • 2010
  • The deep excavation work in Korean downtown is almost excuted near by existing structures and utility lines because of the diminution of available yard for construction. So, it was required more and more that the accurate control of displacement on the earth retaining system for minimizing the popular complaint and the damage from constructional accident. Automatic monitoring system is adopted in fracture zone for real time monitoring. In addition, Face mapping is carried out on the face of fracture zone according to excavation sequence. As the result of automatic monitoring system and face mapping, we was able to take the necessary reinforcement and changing excavation method within suitable time. This paper is informed about a stability case on the deep rock excavation site with fracture zone in urban area by automatic monitoring system.

  • PDF

경부선 직하부를 나란히 통과하는 도심지 터널에 있어서 지표물리탐사 및 암반등급 평가 사례 연구 (The geophysical survey and rock classification suitable for the design of a tunnel in urban area passing underneath the Gyeongbu Line(Railload))

  • 이건;김은덕;사상호;차영호;김태영;정두석;황낙연
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2005년도 춘계학술대회 논문집
    • /
    • pp.673-679
    • /
    • 2005
  • Urban conditions such as underground facilities and ambient noises due to cultural activity restrict the application of conventional geophysical techniques in general. We used the linear array microtremor technique which uses these noises as strong energy source. The result parameter of the survey is shear wave velocity profile which had been applied as an fundamental information for the determination of the rock support type in tunnel design. This study was the first case in Korea which utilized a surface geophysical technique yielding successful result in urban area especially under the existing rail ways. The quantitative relation between the shear wave velocity from this method and the rock mass rating(RMR) determined from the inspection of the cores recovered from the same boreholes showed high statistical relationship. These correlations were then used to relate the shear-wave velocity to RMR along the entire profile.

  • PDF

암반에 근입된 현장타설말뚝의 선단지지거동 (End Bearing Behavior of Drilled Shafts in Rock)

  • 권오성;김경택;이영철;김명모
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.603-610
    • /
    • 2005
  • The end bearing behavior of piles socketed in weathered/soft rock is generally dependent upon the mass conditions of rock with fractures rather than the strength of intact rock. However, there are few available data and little guidance in the prediction of the end bearing capacity of drilled shafts socketed in weathered/soft rock, considering rock mass weathering. Therefore, a database of 13 load tests was constructed first, and new empirical relationships between the base reaction modulus of piles in rock and rock mass properties were developed. No correlation was found between the compressive strengths of intact rock and the base reaction modulus of weathered/soft rock. The ground investigation data regarding the rock mass conditions(e.g. Em, Eur, RMR, RQD) was found to be highly correlated with the base reaction modulus, showing the coefficients of correlation greather than 0.7 in most cases. Additionally, the applicability of existing methods for the end bearing capacity of piles in rock was verified by comparison with the field test data.

  • PDF

암반굴착에 의한 발파진동, 소음 및 비석의 조절 (Control of Blast Vibration, Air Blast, and Fly Rock in Rock Excavation)

  • 류창하
    • 터널과지하공간
    • /
    • 제2권1호
    • /
    • pp.102-115
    • /
    • 1992
  • Blasting operations associated with rock excavation work may have an environmental impact in nearby structures or human beings. With the increase of construction work in urban areas, vibration problems and complaints have also increased. In order to determine the optimum design parameters for safe blast, it is essential to understand blast mechanism, design variables involved in blast-induced damage, and their effects on the blasting results. This paper deals with the characteristics of ground vibrations, air blast and fly rock caused by blast, including the general method of establishing the vibration predictors, and damage criteria suggested by various investigators. The results of field measurements from open pit mine and tunnel construction work are discussed. Basic concepts of how to design blast parameters to control the generation of ground vibrations, air blast and fly rock are presented.

  • PDF

국내 최초 TBM선굴진 2-Arch터널 설계사례 연구 (The First Case Study of TBM Pre-Excavation Type 2-Arch Tunnel in Korea)

  • 김형렬;정상준;강준호
    • 터널과지하공간
    • /
    • 제33권4호
    • /
    • pp.255-264
    • /
    • 2023
  • 근래 들어 도심지 지하공간 개발에 대한 수요가 증가함에 따라 도심지 터널계획이 활발히 진행되고 있다. 도심지 구간에는 주민 생활환경을 고려하여 지하정거장이 계획되며, 기존 구조물의 안정성 및 환경훼손 저감 등을 위해 2-Arch터널 정거장을 적용하고 있다. 그러나 도심지 구간은 심한 풍화작용에 따라 불량지반의 심도가 깊게 발달되어 터널 안정성 확보를 고려한 신중한 계획이 요구된다. 이뿐만 아니라 도심지의 복합적인 지반상태를 고려하여 본선터널에 TBM 기계굴착 공법을 적용하는 경우, 기존 NATM형 2-Arch터널과는 시공연계성을 확보할 수 없게 된다. 본 연구에서는 쉴드TBM과 2-Arch터널을 조합한 형태인 TBM선굴진 2-Arch터널을 국내 최초로 적용한 설계사례를 중점으로 기술하고자 하였다. 중앙터널 굴착후 좌우터널 시공을 고려하여 쉴드TBM 세그먼트 설치 및 해체를 위해 고려한 설계사항을 설명하고, 수치해석을 활용한 안정성 검토를 통해 TBM선굴진 2-Arch터널의 설치효과를 검증하였다.

도시방재를 위한 부산지역 우수저류시설 설치사업의 분석과 대책 (The Analysis of Rainwater Storage Facility Project for the Urban Disaster Prevention in Busan and its Countermeasures)

  • 황재윤
    • 터널과지하공간
    • /
    • 제25권1호
    • /
    • pp.37-45
    • /
    • 2015
  • 최근 많은 도시에서 홍수와 산사태 같은 자연재해가 빈번하게 발생하고 있다. 기상이변으로 인한 집중강우로 우수유출량이 증가되어 침수피해 위험이 가중되고 있다. 부정적인 유출량 변화를 합리적으로 조절하여 도시홍수 등의 피해를 경감하려는 목적에서 우수유출 저감시설을 적극적으로 도입하려는 노력이 시도되고 있다. 따라서 이러한 시설을 적극적으로 보급하기 위하여 지하 우수저류시설 설치사업의 합리적인 분석과 대책을 마련할 수 있는 연구가 절실히 필요하게 되었다. 본 연구에서는 도시방재를 위한 부산지역 우수저류시설 설치사업의 현황과 문제점을 분석하여, 도시방재를 위한 우수저류시설 설치사업의 대책을 제안하였다.