Kim, Il-Woo;Seo, Jae-Pil;Song, Young-Woong;Choi, Yoon-Ki
Korean Journal of Construction Engineering and Management
/
v.13
no.3
/
pp.3-13
/
2012
Urban area has caused decline of commercial function and infrastructure because of unorganized urban development, and urban regeneration projects have appeared since 2000s in order to solve urban problems. Because urban regeneration projects have a complexation of various use, the complicated business process and unsystematic conduction work, project stakeholders are suffering from problem in conducting project. Therefore, this study suggested the necessity of business system for urban regeneration projects with analyzing situations and stakeholders. Also, this study classified business information through development of BPS in order to make information system of business process in the urban regeneration project and evaluated it after realization for information system based on BPS of urban regeneration projects. Project stakeholders will be systematically provided information about urban regeneration projects through this system and it is expected to accomplish urban regeneration projects effectively.
Journal of the Korean Regional Science Association
/
v.39
no.1
/
pp.21-36
/
2023
Entering the era of low growth due to changes in social and economic conditions, most cities across the country are actively promoting urban regeneration. Although urban regeneration is a project with huge national finances, a clear evaluation system has not yet been established. In order to ensure the sustainability of urban regeneration, it is necessary to secure the validity of urban regeneration policies and establish a reflux system to supplement the policies. The purpose of this study is to derive the limitations of the existing comprehensive performance evaluation and to develop an improved urban regeneration policy comprehensive performance evaluation technique based on spatial big data. The urban regeneration comprehensive performance evaluation technique differentiated the areas affected by the urban regeneration project and the surrounding areas based on the type of urban regeneration project and the presence or absence of large cities and middle cities. The effects of urban regeneration were quantitatively verified through relative comparison between the areas affected by urban regeneration projects and the surrounding areas of population, society, economy, industry, physical and environmental evaluation indicators.
International conference on construction engineering and project management
/
2009.05a
/
pp.841-846
/
2009
Recently, the construction industry is getting more complex and sophisticated having the characteristics of a mega project. Mega project pursues a value that can't be gained with an approach of seeing a project as just a simple sum of different parts but a mutual combination. However, the current manuals can't fulfill the needs for supporting, therefore, need a tool to support the decision making and an IETM is expected to take this role. Despite the a lot of expected advantages of IETM, it is still difficult to apply because of the frequent changes of information of detailed process and its complexity. In this research, as part of developing an IETM, we aim to propose a system frame which is based on the analysis of processes of a project. It is basic part of IETM to give information to users and IETM consists of normal mode that offers general information about the urban regeneration project and user-specified mode that gives classified and reorganized information to user. For supporting these functions, IETM should be stored in a form that can classify the information about urban regeneration project and be tagged with meaningful tags. Moreover IETM developers have to consider the interoperability of IETM because it ultimately should be coordinated with overall Project Management System like an iPMIS. We used XML for solution of interoperability because it stores information as just text-file that doesn't need a special form.
The purpose of this paper is to highlight the main policies of the last half century that have shaped the urban architectural fabric of Seoul today, and explore whether a modified approach might better address the current socioeconomic conditions in Korea. The paper defines and examines urban planning in Korea through an overview of the four main urban project policies implemented in Seoul from the 1960s to the present: Land Readjustment (LR), Housing Site Development (HSD), Urban Redevelopment (UR), and Housing Reconstruction (HR). While the fundamental ideology behind these policies served well during a prolonged period of high economic growth, evidence is growing that these policies are losing steam under today's conditions. A growing legacy of stalled and incomplete urban projects from the mid-2000s-the New Town Project is an example-begs the fundamental question as to whether an alternative urban planning paradigm is needed for Korea in an age of low economic growth, low birth rates and a fossil fuel energy crisis. Through the urban morphologies of the three residential areas in Seoul developed by LR projects, this paper looks at the possibility of urban regeneration through the sustainment of urban architecture in those residential areas that have not been affected by HSD, UR, and HR.
Urban space structure in South Korea when through drastic changes ever since public housing policies began their full-fledge implementation. That is, public housing policies represent the main cause for formation of the current urban space structure, as the public houses are constructed in accordance with changes of demographic/social structure, considering changes of housing demand, in urban spaces demanded by the end users. After rapid industrialization and urbanization in the 1960's, each government in different periods have implemented housing supply policies through massive urban developments, to resolve the issue of housing shortage and residential instability. Phase 1 New Towns were developed in the 1980's resulting in suburbanization of the Seoul Area, followed by urban sprawl due to construction of small-size New Towns after deregulation in the 1990's, and construction of Phase 2 New Towns for resolution of housing shortage in the early 2000's and the resulting urban problems. In the mid-2000's, construction of Bogeumjari houses in GB areas led to insufficient housing supply in downtown areas, and the period after 2010 witnessed continuous deterioration of existing urban areas and acceleration of the rental housing crisis caused by rental housing shortage in downtown areas. Moreover, the residentially vulnerable classes consisting of young, 1~2-member households is expanding, with the real estate market in recess. Therefore, the government is trying to achieve urban regeneration through public housing policies so as to resolve the urban space problem and the housing problem at the same time, and the Happiness Housing Project has been implemented as a policy to achieve that goal. The Happiness Housing Project for young, residentially vulnerable classes in downtown areas, is going through diversification aimed at conjunction with urban regeneration projects in downtown areas, as exemplified by conversion of rental houses in residential environment improvement project districts and redevelopment/reconstruction project districts into happiness housing, and supply of happiness housing in conjunction with small reorganization projects for deteriorated residential areas in such areas as those excluded from New Town designation. Continuous supply of Happiness Housing in conjunction with urban regeneration requires mixed-use residential development which includes convenience facilities and public facilities, along with improvement of rental conditions (rental period/rent) and diversification of project methods, considering that the project is implemented in downtown areas.
Incheon, South Korea, is a rapidly growing port city that has long held an important role in the country. While for most of its history it has been considered more of a coastal extension of Seoul, it is now trying to grow from that role and become a global city. National and local initiatives and acts have led to the Incheon Free Economic Zone (IFEZ). This large zone connects three smaller districts into one large project. The goal of the project is to assert Incheon as its own city and go beyond its role as merely a gateway to Seoul. However, as most large-scale projects go, there are multiple issues and constraints faced by the IFEZ. This paper analyzes the project and gives critique on how the project could possibly achieve its goal more quickly.
Urban railway signaling system is for train operation with safety in the urban crowded area, that has been increasing the demand of use of advanced train control systems with safe. European Commission is supporting the UGTMS(Urban Guided Transport Management System) project for the research and development. The main objective of UGTMS is to provide the European urban guided transport sector (comprising metro, tram and light rail systems) with a common Management System. A key topic is the extent to which the specifications for the successful ERTMS(European Rail Transport Management System) can be adapted to UGTMS needs. Beyond this, it is necessary to define the relevant functional and system requirements for all types of urban guided transport management systems in order to improve interoperability and intermodality. Also to be explored are the prospects for open system standards. In this article, we look into the trend of the standardization through the UGTMS project in Europe and consider any benefit to the project of the standardization for the urban railway signaling system in Korea.
Journal of Construction Engineering and Project Management
/
v.3
no.2
/
pp.35-48
/
2013
Weak competencies in urban local bodies (ULBs) for implementing public private partnership (PPP) projects has been recognized as a major hurdle in uptake of PPP model in India. In this context, a questionnaire survey was conducted to evaluate perception of urban PPP experts and ULB representatives on three aspects related to competency development, including, critical competencies for implementing urban PPP projects, approaches for competency development in ULBs and constraints faced by ULBs in development of competencies. The five critical competencies identified are project identification, project conceptualization, transaction design, PPP process management and contract management. The approach of training programs for municipal staff and elected representatives, and capacity building oriented technical assistance for implementing urban PPP projects have been preferred by survey respondents for competency development. The frequent transfer of municipal decision makers and low motivation among municipal staff have been identified as the most significant constraints for development of competencies.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.531-535
/
2008
Project management of Urban Redevelopment that including a various projects is widely different with general project management. For that purpose, this research would offer to contribute the properties of urban redevelopment the solution for successful urban redevelopment. For offering this solution, this research analyzed the properties of urban redevelopment. The study is to analyze the problem of current urban redevelopment that be discrepant the changing paradigm.
Jee Hee Lee;June Seong Yi;Seung Woo Shin;Kyung Rog Park
International conference on construction engineering and project management
/
2009.05a
/
pp.1288-1293
/
2009
Performing 'Mega Project' in which various stakeholders are involved is difficult to control due to the respective conflicting objectives. Urban regeneration which is being challenged issue in various ways can be defined as the mega project. Since the mega project like urban regeneration a long-continued project and includes a lot of participants whose benefits conflict, cooperation among stakeholders is essential. Moreover, as the project goes, diverse decision making situations which require collaboration happen, and if proper decision making cannot be given at that time, the whole project would have critical effects. Also, since each activity concerns numerous stakeholders, prompt decision making is difficult in the mega project. Therefore, the objective of this study is to support stakeholder's cooperative decision making in order for conducting successful project. For the purpose of the paper, the concept of cooperation in mega project is redefined and a cooperative decision making framework is suggested. Also, the term of governance, which means cooperative mechanism based on the mutual trust, information sharing and partnership, is applied to the newly defined cooperation. The suggested cooperative decision making framework contains the structure of stakeholders in urban regeneration project which enables participants to understand the relationship among bodies and checklists for supporting decision making appropriately. The application of the framework proposed in this research is expected to contribute subjects' suitable decision making by providing proper information in a timely manner.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.