• Title/Summary/Keyword: urban building management

Search Result 415, Processing Time 0.026 seconds

Overview of Performance-Based Seismic Design of Building Structures in China

  • Li, Guo-Qiang;Xu, Yan-Bin;Sun, Fei-Fei
    • International Journal of High-Rise Buildings
    • /
    • v.1 no.3
    • /
    • pp.169-179
    • /
    • 2012
  • The development history, the current situation and the future of the performance-based seismic design of building structures in China are presented in this paper. Firstly, the evolution of performance-based seismic design of building structures specified in the Chinese codes for seismic design of buildings of the edition 1974, 1978, 1989, 2001 and 2010 are introduced and compared. Secondly, in two parts, this paper details the provisions of performance-based seismic design in different Chinese codes. The first part is about the "Code for Seismic Design of Buildings" (GB50011) (edition 1989, 2001 and 2010) and "Technical Specification for Concrete Structures of Tall Building", which presents the concepts and methods of performance-based seismic design adopted in Chinese codes; The second part is about "Management Provisions for Seismic Design of Outof-codes High-rise Building Structures" and "Guidelines for Seismic Design of Out-of-codes High-rise Building Structures", which concludes the performance-based seismic design requirements for high-rise building structures over the relevant codes in China. Finally, according to those mentioned above, this paper pointed out the imperfections of current performance-based seismic design in China and proposed the possible direction for further improvement.

A Study on the Analysis and Methods to Improve the Management System for Building Energy Database (국가 건물에너지통합관리시스템의 데이터 품질 분석 및 개선방안 연구)

  • Kim, Sung-Min;Yoon, Jong-Don;Kwon, Oh-In;Shin, Sung-Eun
    • Journal of Energy Engineering
    • /
    • v.25 no.1
    • /
    • pp.131-144
    • /
    • 2016
  • Damage occur frequently around the world on climate change and the main cause of greenhouse gas emissions regulation is growing. To this end, the government has built integrated management system for national building energy. The building energy information is total 6.8 million complex. Integrated management system for national building energy database are matched building registers information and energy information of the supply agencies. However, the matching process has its limitations so advanced work is in progress continuously. This study analyzed integrated management system for national building energy database quality and limitations and deduce improvement plan to increase system reliability and availability. The existing database matching average rate is 85.6%. 58.2% of the total non-matching data type has no building information. To ensure the ease of new database matching and the accuracy of the existing database matching, address standarization and building properties system are needed between building information and energy information. Also, The system construction is required to include information on other energy sources like petroleum energy which has high proportion of non-urban areas and small residential areas and renewable energy which has high potential in development and utilization.

Delay Factor Analysis of Public Project Based on System Dynamics (SD를 이용한 공공 프로젝트의 지체요인 분석)

  • 이만형;이정민
    • Korean System Dynamics Review
    • /
    • v.4 no.2
    • /
    • pp.95-130
    • /
    • 2003
  • The purpose of this study is to find what causes make public projects hold off, going beyond the planned deadline and budget. Using System Dynamics(SD) and their derivative Urban Dynamics(UD) models, it intends to analyze major feedback loops based on VENSIM and to simulate them with STELLA software, all of which are interrelated with various causes of project delay. To prevent or ameliorate project delay, first of all it advises to focus on endogenous delaying factors not exogenous ones. These factors either reinforce or balance certain loops in complex causal structure, In the case example on the Cremation Building Project in Cheongju, Residents’ participation demand make negotiation put off and delayed negotiation reinforces administrative-expediency planning in order to observe a time limit, on the other hand, once building consensus, it increase both the level of planning performance and public trust. In the meantime, the real planning process used to neglect residents opinions and manage public grievance only through compensation, he a result of simulation, visible fruit of negotiation in the initial phase seems to be not satisfactory owing to funds and time consumed, but after reaching an mutual agreement among stakeholders, planning performance is effective and strategic than administrative-expediency planning viewed in both financial and time angle. It proposes to devise specific tools schematizing project implementation. In order to upgrade the quality of project management, it recommends for planners to adopt key concepts based on SD/UD diagrams and causal loops, which would contribute to enriching Planning abbots.

  • PDF

Building Mongolian ULIIMS(Ulaanbaatar Land Information Integration Management System) (몽골 울란바타르시 토지정보 통합관리시스템 개발)

  • Jo, Myung-Hee
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.16 no.3
    • /
    • pp.164-179
    • /
    • 2013
  • Ulaanbaatar city, the capital of Mongolia and the center of Mongolian economy, increasingly needs to have a long-term urban planning and a system to impose a tax on land effectively as insufficient development of land and the moving of nomad into urban areas increases during its rapid growth. Therefore, Mongolian government has to prepare a land management system which provides the infrastructure to improve work efficiency and service quality by integrating digitalized data about land and main facilities and sharing data between related departments. This research analyzed the environment to operate the existing land management system and working environment and redesigned database. Furthermore, it integrated all the existing systems, configured service network, and made working environment for land registration, land permission, land payment management to be processed online. With this, it provides the foundation to improve quality of people's life through the preparation of long term urban planning, clean tax administration of real estate, and reconsideration of efficiency about urban infrastructure investment.

A Study of BIM-based Construction Management Work Process Development in Design Phase (설계단계의 BIM기반 CM 업무 프로세스 개발에 관한 연구 - 설계관리 업무를 중심으로 -)

  • Lee, Seoyun;Ham, Namhyuk;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.90-101
    • /
    • 2013
  • A typical construction project involves participation of various parties including clients, contractors, architects, and engineers for its successful completion, and yet has intrinsic differences of interests among the participants during the project execution period. A construction management (CM) services's role is then to resolve these differences of interests among the participants during the project execution, and lead the projects to its successful completion while representing the clients' demands and interests. The use of building information modeling (BIM) is increasing recently among construction projects, and those CM service companies are experiencing difficulties applying BIM. This is because the use of BIM in construction projects suggests a quite new set of operational paradigm. The purpose of this paper is then to review the recent cases of projects which used BIM; to analyze the these projects' processes; to reengineer the design phase process based on the lessons learned from recent BIM application; and to suggest a modified design phase process model that could improve the use of BIM and related coordination operations.

The Management Method for Preventing Frequent Defect about Each Inspection Part from The Data Analysis of Pre-qualification of Residential Building Reconstruction (주택 재건축 예비평가 자료분석을 통한 분야별 주요결함의 예방·조치방안)

  • Kim, chun hag;Bae, cheol hak
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.181-186
    • /
    • 2008
  • The purpose of this study is analyzing the frequent defect about each inspection part of Pre-qualification of residential building reconstruction and finding the cause of occurrence so that can supply a solution of the problem during the plalnning and constructure. The frequent defects are naturally following the deterioration and more occur in the structure body than a skin. The meaning that supply the cause and the managing method for preventing frequent defects about each inspection part is as follows. To prevent the defects, it is needed that the choice of the appropriate materials, giving a sufficient space for facilities, reliable constructure for the part of expecting the defects. The quality of life will go up due to making a good dwelling environment and extending the life cycle of structures from the inspection and managing the part of expecting defects.

  • PDF

BUILDING EXTRACTION FROM LIDAR DATA USING DEVIRED NORMALIZE DIGITAL SURFACE MODEL

  • Nguyen, Dinh-Tai;Lee, Seung-Ho;Cho, Hyun-Kook;Kim, Cheon
    • Proceedings of the KSRS Conference
    • /
    • 2009.03a
    • /
    • pp.286-290
    • /
    • 2009
  • In recent years, LiDAR technology has been becoming more popular and important. Its applications are completely replacing the traditional remote sensing technique. One of these applications is creating Digital City Models in urban areas, which is essential for many others such as disaster management, cartographic mapping, simulation of new buildings, updating and keeping cadastral data. In most of these cases the building outlines is the primary feature of interest. In this paper, a method of extracting building outlines from LiDAR data will be performed.

  • PDF

Study on Integrity Assessment of Pile Foundation Based on Seismic Observation Records

  • KASHIWA, Hisatoshi
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.4
    • /
    • pp.369-376
    • /
    • 2020
  • Given the importance of quickly recovering livelihoods and economic activity after an earthquake, the seismic performance of the pile foundation is becoming more critical than before. In order to promote seismic retrofit of the pile foundations, it is necessary to develop a method for evaluating the seismic performance of the pile foundation based on the experimental data. In this paper, we focus on the building that was suffered severe damage to the pile foundation, conduct simulation analyses of the building, and report the results of evaluating the dynamic characteristics when piles are damaged using a system identification method. As a result, an analysis model that can accurately simulate the behavior of the damaged building during an earthquake was constructed, and it was shown that the system identification method could extract dynamic characteristics that may damage piles.

A Study on the Application of Integrated Management System for Building Energy Efficiency (건물부문의 에너지 효율화를 위한 국가 건물에너지 통합관리 시스템의 활용방안 연구)

  • Yoo, Jung-Hyun;Kim, Jong-Yeob;Hwang, Ha-Jin
    • Land and Housing Review
    • /
    • v.3 no.3
    • /
    • pp.263-270
    • /
    • 2012
  • Energy consumption of building is given a sizable portion in total national energy conservation. From this reason, the integrated management system of national building energy was proposed to manage energy usage and of which feasibility study was demonstrated in Seoul at 2010. Expansion of the application availability for the aforementioned system, energy policies etc. have focused on the building sectors and future uses and developments are investigated. Specially, energy consumption and building documentary DB are useful to validate energy usage for each building and define to remodelling effect before and after. Furthermore, in this study, a number of developments and applications of the system and future uses of energy usage data can be identified.

A Study on the Evaluation Method for the Degree of Integration towards Office Towers in Different Climate Zones

  • Han, Seung-Hoon;Moon, Jin Woo;Kim, Kyoung-Hee
    • Architectural research
    • /
    • v.14 no.4
    • /
    • pp.117-124
    • /
    • 2012
  • High rise office buildings represent one of the most energy-intensive architectural typologies. The growth of urban population necessitates sustainable high rise towers that lessen environmental impacts and energy consumption. Among various sustainable strategies, the integrated design is long known to be an important process that has great impact on building's sustainability. The framework for this paper is based on the case study of integrated towers that are located in different climate zones. The paper specifically addresses to what extent climate conditions influence the design of a high rise building and what kinds of the climate integrated design has been implemented. Qualitative case studies were carried out using published data and architectural drawing set. The technical work presented in the paper is based on computer simulation that examines the insolation analysis using hourly recorded weather data. The analysis results revealed that the site and building envelope integration and the site and building service systems have shown the most frequently employed in the integrated towers through the implementation of renewable resource integration, high performance envelopes and sustainable building service systems. Internal comfort and further energy saving in the integrated towers are offered through an automatic building management system. Due to the dynamic climate conditions, integration of building systems requires a sophisticated approach to building sustainability.