• Title/Summary/Keyword: unit quantity of water

Search Result 100, Processing Time 0.027 seconds

Influence of Filtrate Quality by Variation of Operating Filter Number Based on Inflow (유입유량과 연계한 여과지 가동지수 변동 운영이 여과수 수질에 미치는 영향)

  • Kim, Jin-Keun;Lee, Jung-Tack
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.31 no.9
    • /
    • pp.817-824
    • /
    • 2009
  • To prevent turbidity breakthrough in a depth filter caused by hydraulic shock loads, influence of turbidity and particle number in filtrate by variation of operating filter number depending on inflow change was investigated. Inflow quantity at the S water treatment plant (WTP) was varied and ratio of maximum/minimum inflow quantity was 2.2, therefore filtration velocity was also subsequently changed. The S WTP changed operating filter number depending on inflow variation to minimize change of filtration velocity. Particle breakthrough was not severe when operation system was changed, out-of-operation and re-start of filter was repeated depending on inflow quantity. Slight particle breakthrough was noticed when re-start of filter was implemented at the filter that had a cumulative filtration run time of less than 10 h or more than 50 h. This can be attributed to the inadequate ripening and over accumulation of particles on media. Therefore, it is more efficient to choose a re-starting filter basin which has cumulative filtration run time more than 10 h or less than 50 h to reduce particle breakthrough. Filter number variation depending on inflow change was proven to be a method for improvement of unit filter run volume (UFRV).

Study on Applicability of Design Flood Estimation Methods in Creeks (소하천 설계홍수량 추정모형의 적용성 검토)

  • Kim, Yangsu;Lee, Byongju;Kim, Junho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2004.05b
    • /
    • pp.163-167
    • /
    • 2004
  • Creeks, defined by creek's improvement law, have strong localities in the flow characteristics and environmental condition. During the recent ten-years, lots of flood damages have occurred rather in the creeks. However, quantity and stream design information are poor while the national-class and local-class streams have sufficient. This causes a problem on improving the safety from flood. This study focuses on assessment of practical applicability for design flood estimation models. For this, Rational formula, Clark's model and Nakayath synthetic unit hydrograph method are estimated by data of the creek comprehensive improvement plan report, etc.

  • PDF

Necessity of Adjustment of the Jurisdiction of Local Governments based on Watershed (유역(流域)을 기초로 한 행정구역경계설정의 필요성)

  • Lee, Won-Young
    • Journal of Environmental Impact Assessment
    • /
    • v.10 no.3
    • /
    • pp.245-255
    • /
    • 2001
  • The management of water, both the quantity and the quality, has been one of the most important issues in the public investment and it is equally true in the field of sustainable development. Nevertheless, the jurisdiction of local governments has been delineated without much attention to the issue of the water management. In the planning of wide areas such as cities, countries, the metropolis, and the megalopolis, it is necessary to well arrange the geographical jurisdiction of local governments as a unit of region. The river water system, including small streams to large rivers, should be given its due share in the planning and jurisdictional delineation. The traditional concept of the local government's jurisdiction emphasizing the accessibility may be fading away. Instead, the efficiency of the public management would be the main concept in determining the jurisdiction of local governments. The river improvement, the waterworks, the sewage, the maintenance of water quality, the space of water recreation, are relatively important in the efficient management of that area. This paper argues for the equalization between the geographical jurisdiction of local governments and watersheds. To this end, I do case studies of the local governments areas such as Ri(里), Eup Myon(邑 面), Si Gun(市 郡), KyangyokSi Do(廣域市 道). The study interprets ARS will be one of the principles of land use and the reorganization of the local jurisdiction in the future as a geo-systematic and the eco-systematic criteria.

  • PDF

A study on the development of oil skimming ship for large quantity of oil pollution (대형 오염방제 선박의 개발에 관한 연구)

  • 권기생
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.2 no.1
    • /
    • pp.57-65
    • /
    • 1996
  • The latest date, No. 1 YouII was grounded and sunk into the sea at MAMHYUNGJEDO ( South brother Island) in Sep. 21. 1995, and M.V. Sea Prince of V.L.C.C also made a big oil poullution accident owing to Typhoon "Paei" at front sea of Yeu Choun on Jul. 25. 1995. The large or small scall scale of oil poullution accident frequently was occurred about 300-350 cases per ine(1) year. The countries advanced in marine relations like as, nited Kingdom and Japan, have perfect system The country of expert education, training and oil recovery equipments in oil poullution accidents. The large quantity oil skimming ship's basic condition need general skimming ship which was high speed and large quantity skimming ability , and hve to store the recovered oil into tanks This oil skimming shop are composit the skimmer whuch move up and down according to the wace movements, storage tank which storage the recovered oil in after side, transfer pump which transformed from flooding tank to separating tank and separating tank which separated the oil mixtures, Also there are cylindrical floated which keep the auto positing, gate which keep the auto positing, gate which protect and guide the recovering oil from sea and balance weight for skimmer balance. Also there are cylindrical floated which keep the auto positing, gate which protect and guide the recovering oil from sea and balance weight for skimmer balance. The important arrangement is twin arm which moved by two hinge and move te skimming unit by wave movement. In gate of inside, made long wear in the gate bellow position, there are also connected the flexible hose for oil mixtures drop. The separating tank composited with multi-divided bulkhead for ffective oil and sea water separating by settling and flotation principle. As use the above natural princile and equipment, we can remove the large quantity oil by developed oil skimming ship.ming ship.

  • PDF

Spectroscopic Imaging at 1.0Tesla MR Unit (1.0Tesla 자기공명 영상장치에서의 분광영상기법에 관한 연구)

  • Yi, Y.;Ryu, T.H.;Oh, C.H.;Ahn, C.B.;Lee, H.K.;Cho, Z.H.
    • Proceedings of the KOSOMBE Conference
    • /
    • v.1997 no.11
    • /
    • pp.517-527
    • /
    • 1997
  • Magnetic Resonance Spectroscopic Imaging is a methodology combining the imaging and spectroscopy. It can provide the spectrum of each areas of image so that one can easily compare the spectrum of one position to another position of the image. In this study, we developed pulse sequence or the spectroscopic imaging method, RF wave forms or the saturation of water signal, computer simulations to validate our method, and confirmed the methodology with phantom experiment. Then we applied the spectroscopic method to human subject and identified a few important metabolites in in vivo. To develope a water saturating RF waveform, we used Shinnar-Le-Roux algorithm and obtained maximum phase RF waveform. With this RF pulse, it could suppress the water signal to 1:1000. The magnet is shimmed to under 1.0ppm with auto-shimming technique. The saturation bandwidth is 80Hz(2ppm). The water and fat seperation is 3.3ppm(about 140Hz at 1 Tesla magnet), the bandwidth is enough to resolve the difference. But we are more concerned about the narrow window in between the two peaks, in which the small quantity of metabolites reside. We performed the computer simulation and phantom experiments in 8*8 matrix form and showed good agreement in the image and spectrum. Finally we applied spectroscopic imaging to the brain of human subject. Only the lipid signal was shown in the periphery region which agrees with the at distribution in human head surface area. The spectrum inside the brain shows the important metabolites such as NAA, Cr/PCr, Choline. We here have shown the spectroscopic imaging which is normally done above 1.5 Tesla machine can be performed in the 1 Tesla Magnetic Resonance Imaging Unit.

  • PDF

Efficiency evaluation of water leakage management methods in local small and medium cities (지방중소도시의 누수관리방법에 대한 효율성 평가)

  • Hwang, Jinsoo;Choi, Taeho;Kim, Kibum;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.35 no.2
    • /
    • pp.121-133
    • /
    • 2021
  • This study set up the estimates of leakage management efficiency evaluation and leakage management goal that could be used in local water distribution networks efficiency business and modernization business. The data were analyzed using data envelopment analysis and multiple regression analysis. To this end, with leakage management input indices concerning leakage reduction activities (e.g., aged pipe replacement, water meter replacement, leakage restoration, and leakage detection) and leakage management calculation indices (e.g., the increase of revenue water ratio and the reduction of leakage ratio), the data on 22 K-water consignment local water supply systems were analyzed for the years from 2004 through 2018. Using the results of efficiency analysis by data envelopment analysis, the other DMUs (Decision Making Unit) benchmarked the DMU with the highest efficiency to maximize the leakage management efficiency for all DMUs. Through this, leakage management goal estimates were drawn with the input indices of four leakage reduction activities and calculation indices of the increase of revenue water ratio and the reduction of leakage ratio by multiple regression analysis for each group based on the revenue water ratio and leakage ratio. The correlation coefficients of the leakage management goal estimate for the criteria for the revenue water ratio amounted to 0.553 and 0.771. The correlation coefficients of the leakage management goal estimate for the criteria for leakage ratio were 0.397 and 0.865. Accordingly, we estimated the quantity and priority of four leakage reduction activities for the target leakage ratio and revenue water ratio.

Calculation of Unit Hydrograph from Discharge Curve, Determination of Sluice Dimension and Tidal Computation for Determination of the Closure curve (단위유량도와 비수갑문 단면 및 방조제 축조곡선 결정을 위한 조속계산)

  • 최귀열
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.7 no.1
    • /
    • pp.861-876
    • /
    • 1965
  • During my stay in the Netherlands, I have studied the following, primarily in relation to the Mokpo Yong-san project which had been studied by the NEDECO for a feasibility report. 1. Unit hydrograph at Naju There are many ways to make unit hydrograph, but I want explain here to make unit hydrograph from the- actual run of curve at Naju. A discharge curve made from one rain storm depends on rainfall intensity per houre After finriing hydrograph every two hours, we will get two-hour unit hydrograph to devide each ordinate of the two-hour hydrograph by the rainfall intensity. I have used one storm from June 24 to June 26, 1963, recording a rainfall intensity of average 9. 4 mm per hour for 12 hours. If several rain gage stations had already been established in the catchment area. above Naju prior to this storm, I could have gathered accurate data on rainfall intensity throughout the catchment area. As it was, I used I the automatic rain gage record of the Mokpo I moteorological station to determine the rainfall lntensity. In order. to develop the unit ~Ydrograph at Naju, I subtracted the basic flow from the total runoff flow. I also tried to keed the difference between the calculated discharge amount and the measured discharge less than 1O~ The discharge period. of an unit graph depends on the length of the catchment area. 2. Determination of sluice dimension Acoording to principles of design presently used in our country, a one-day storm with a frequency of 20 years must be discharged in 8 hours. These design criteria are not adequate, and several dams have washed out in the past years. The design of the spillway and sluice dimensions must be based on the maximun peak discharge flowing into the reservoir to avoid crop and structure damages. The total flow into the reservoir is the summation of flow described by the Mokpo hydrograph, the basic flow from all the catchment areas and the rainfall on the reservoir area. To calculate the amount of water discharged through the sluiceCper half hour), the average head during that interval must be known. This can be calculated from the known water level outside the sluiceCdetermined by the tide) and from an estimated water level inside the reservoir at the end of each time interval. The total amount of water discharged through the sluice can be calculated from this average head, the time interval and the cross-sectional area of' the sluice. From the inflow into the .reservoir and the outflow through the sluice gates I calculated the change in the volume of water stored in the reservoir at half-hour intervals. From the stored volume of water and the known storage capacity of the reservoir, I was able to calculate the water level in the reservoir. The Calculated water level in the reservoir must be the same as the estimated water level. Mean stand tide will be adequate to use for determining the sluice dimension because spring tide is worse case and neap tide is best condition for the I result of the calculatio 3. Tidal computation for determination of the closure curve. During the construction of a dam, whether by building up of a succession of horizontael layers or by building in from both sides, the velocity of the water flowinii through the closing gapwill increase, because of the gradual decrease in the cross sectional area of the gap. 1 calculated the . velocities in the closing gap during flood and ebb for the first mentioned method of construction until the cross-sectional area has been reduced to about 25% of the original area, the change in tidal movement within the reservoir being negligible. Up to that point, the increase of the velocity is more or less hyperbolic. During the closing of the last 25 % of the gap, less water can flow out of the reservoir. This causes a rise of the mean water level of the reservoir. The difference in hydraulic head is then no longer negligible and must be taken into account. When, during the course of construction. the submerged weir become a free weir the critical flow occurs. The critical flow is that point, during either ebb or flood, at which the velocity reaches a maximum. When the dam is raised further. the velocity decreases because of the decrease\ulcorner in the height of the water above the weir. The calculation of the currents and velocities for a stage in the closure of the final gap is done in the following manner; Using an average tide with a neglible daily quantity, I estimated the water level on the pustream side of. the dam (inner water level). I determined the current through the gap for each hour by multiplying the storage area by the increment of the rise in water level. The velocity at a given moment can be determined from the calcalated current in m3/sec, and the cross-sectional area at that moment. At the same time from the difference between inner water level and tidal level (outer water level) the velocity can be calculated with the formula $h= \frac{V^2}{2g}$ and must be equal to the velocity detertnined from the current. If there is a difference in velocity, a new estimate of the inner water level must be made and entire procedure should be repeated. When the higher water level is equal to or more than 2/3 times the difference between the lower water level and the crest of the dam, we speak of a "free weir." The flow over the weir is then dependent upon the higher water level and not on the difference between high and low water levels. When the weir is "submerged", that is, the higher water level is less than 2/3 times the difference between the lower water and the crest of the dam, the difference between the high and low levels being decisive. The free weir normally occurs first during ebb, and is due to. the fact that mean level in the estuary is higher than the mean level of . the tide in building dams with barges the maximum velocity in the closing gap may not be more than 3m/sec. As the maximum velocities are higher than this limit we must use other construction methods in closing the gap. This can be done by dump-cars from each side or by using a cable way.e or by using a cable way.

  • PDF

Computed tomography investigation of the three-dimensional structure and production method of White Porcelain Water Dropper with Openwork Lotus Scroll Design and Eight Trigram Design in Cobalt-blue Underglaze (CT 조사를 통한 청화백자투각연당 초팔괘문연적의 3차원적 구조와 제작방법에 대한 고찰)

  • Na, Ahyoung;Hwang, Hyunsung
    • Conservation Science in Museum
    • /
    • v.25
    • /
    • pp.1-8
    • /
    • 2021
  • This study investigated White Porcelain Water Dropper with Openwork Lotus Scroll Design and Eight Trigram Design in Cobalt-blue Underglaze (hereinafter, the "water dropper") in the collection of the National Museum of Korea using computed tomography (CT). A replica was produced to examine both the structure and its original production method. The CT scanning identified no joint lines or pores in the clay, which suggests that the body (the lower part of the water dropper) was shaped in a single piece using a mold and was then matched with a mold-formed lid (the upper part of the water dropper). The inner container of the body portion was roughly trimmed with a bamboo knife so that its upper surface could be securely attached to the bottom of the lid and prevent any leakage in the joined surface. It appears that the inner container for storing water was made first in a cylindrical shape that met the unit of quantity used at the time and could be easily formed by molding. It was transformed into a trapezoid shape during the process of combining it with the lid. A cylindrical inner container was reproduced using silicon 3D printing to compare its capacity with that of the original inner container. The comparison revealed that the reproduced container had a capacity of 152.5㎖, whereas the original container holds approximately 168.6㎖, a figure similar to three hop (around 174㎖) in Joseon-period units of quantity. Since the capacity of the cylindrical inner container corresponds to a known measure from the late Joseon dynasty, it is likely that the water dropper was originally produced to contain a cylindrical inner container.

The Effects of Various Cement Type and Compositions on the Material Properties of high Strength Concrete (시멘트 특성의 변화가 고강도콘크리트의 재료특성에 미치는 영향)

  • 백상현;이종열;엄태선;임채용;안광원
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.04a
    • /
    • pp.47-52
    • /
    • 2000
  • Recently, it is very necessary the development of the manufacturing techniques for high strength concrete(HSC) for the large-scale size and good quality of civil structure. But, the manufacture and quality control of HSC of which shrinkage, heat of hydration and workability at construction filed are considered, is very difficult due to its low water-cement ratio and high quantity of unit cement content. In the present study, we tried to know and assess the influences of chemical and physical properties of cement on the material properties of HSC. We analyzed basic properties of 4 kinds of cement whose chemical and physical properties are different each other through various tests such as chemical analysis and mortal test. Also, we performed the assessment of the material properties of HSC for each dement by the test for the conditions of same mix design and similar compressive strength. From the results in the study, the assessment of the important quality factors of cement influencing the properties of HSC may be utilized to quality control of applied cement to manufacture the HSC of high quality.

  • PDF

An Evaluation on Concrete incorporating blame blast furnace slag powder adding Durability Improvement Agent (고로슬래그 미분말에 내구성향상 혼화제를 첨가한 콘크리트의 기초물성에 관한 실험적 연구)

  • Lee, Jong-Rok;Lim, Sang-Jun;Song, In-Myung;Yun, Jae-Hwan;Jung, Sang-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.147-150
    • /
    • 2007
  • As recent buildings often use low-quality concrete materials, are constructed defectively, and are put in extreme environmental conditions, many of them show the shortening of life resulting from the corrosion of reinforcing rods by salt damage, carbonization, freezing and thawing, cracking. This in turn raises the cost of repair and maintenance, so it is required to extend the life of structures through enhancing the durability of concrete. In response to the demand, researches on high-durability concrete are being made actively focused on the maximum water-cement ratio, the maximum unit quantity, the minimum cover thickness, the addition of mineral admixtures, etc. With this background, the present study examined the basic physical properties of concrete containing admixtures for enhancing the durability of concrete.

  • PDF