• Title/Summary/Keyword: unit modular

Search Result 208, Processing Time 0.022 seconds

Test Result on Embedded Steel Column-to-Foundation Connection for Modular Unit Structural System (유닛 모듈러 기둥 매입형 기초 접합부에 대한 실험 연구)

  • Lee, Sang Sup;Bae, Kyu Woong;Park, Keum Sung;Hong, Sung Yub
    • Journal of Korean Society of Steel Construction
    • /
    • v.26 no.6
    • /
    • pp.537-547
    • /
    • 2014
  • A steel modular unit structural system has been used increasingly for mid and high-rise buildings, since the building can be easily constructed by assembling the pre-made modular unit structures. For this structural system, each modular unit structures have to be properly connected to the foundation to transfer the axial force and the bending moment that are generated from external load to the ground. In this study, a new type of the embedded steel column-to-foundation connection was proposed, and its flexural behavior was evaluated through a series of experimental study. Five full scale specimens for the proposed connections were constructed and tested. The effect of the main parameters that affect the flexural behavior of the proposed connection, such as embedment length and shape of end plate, were studied. From the results, it was found that the flexural stiffness of the proposed connection was higher than that of the semi-rigid connection for all test specimens, and 200 mm of embedment length was proper for the given test specimens in this study.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

Survey on the Market of Modular Building Using ARIMA Model (ARIM모형을 활용한 모듈러 건축시장 현황 조사)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Lee, Yuril
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.14-15
    • /
    • 2014
  • The modular construction is as yet early stage of market in Korea. So It is have difficulty of market demand forecast of the modular building. Therefore, this study was done analysis for market trends of the modular building using ARIMA(Auto Regressive Integrated Moving Average) model by time series data.

  • PDF

Study of Improved Transporting Methods on Unit Module (유닛모듈 운송 방법의 개선방향 연구)

  • Park, Su-Yeul;Kim, Kyoon-Tai;Park, Nam-Cheon;Jung, In-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.243-244
    • /
    • 2012
  • Recently, research has been actively conducted for getting interested in unit module housing. However, the domestic unit modular housing research in the early stages yet, so the major process for research is lacking. Explore all these reasons fit with domestic unit housing development this paper, focusing on the process of shipping cargo by truck, transport unit module was studied. The purpose of this paper is to present new ideas and derive the direction of the development of the equipment safely and effectively fixed to the unit module of the transport unit module that will be helpful in the development of the equipment required for the transport process of the next unit module.

  • PDF

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

Nonlinear Behavior Analysis of Connections Between Modular Units Using Connecting Steel Plate (연결 강판을 이용한 모듈러 유닛 간 접합부의 비선형 거동 해석)

  • Kim, Hyeon-Gu;Yoo, Jung-Han
    • Journal of Korean Association for Spatial Structures
    • /
    • v.23 no.2
    • /
    • pp.45-52
    • /
    • 2023
  • Modular construction is an economical and efficient construction that reduces time and costs by manufacturing units in factories and constructing them on site. Currently, the demand for modular construction is increasing not only abroad but also domestically. As the demand for modular construction increases, a lot of development and research on connections between modular units are being conducted. Connections between modular units should be quick and simple to assemble when assembling units on site, and should be in a form that allows each unit to be connected regardless of direction. In addition, it must be able to exert sufficient strength against external loads. In this study, a connection between modular units using connecting steel plates and bolts was proposed, and the nonlinear behavior of the connection to external lateral force was analyzed through finite element analysis, and resistance performance was evaluated.

Design Equation of a Coupled Beam to Limit Deflection of Modular Unit Structures (모듈러 유닛 구조물의 사용성 향상을 위해 연결된 보의 처짐 제한을 위한 설계식 개발)

  • Park, Ji-Hun;An, Seok-Hyun;Cho, Bong-Ho;Lee, Sang-Hyun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.471-475
    • /
    • 2007
  • Design equations of coupling plates, which connects floor beam of the upper modular unit and overhead beam of the lower one in order to improve serviceability in vibration, are proposed. End conditions of the coupled beams is semi-rigid and the optimal location of the coupling plates are assumed. Rotational constraints for both ends of the coupling plate modeled with beam elements are released and flexibility method is applied to obtain deflection equations of the coupled beam. Proposed equations are defined using the flexibility of the coupling plate, of which size can be determined inversely. Based on numerical analysis, coefficients of the design equations are calibrated and the revised equations are verified to be useful in the design of the coupled beam.

  • PDF

Development of a small avionics unit based on FPGA with soft CPU (소프트 CPU 내장형 FPGA 기반의 소형 전장품 개발)

  • Jeon, Sang-Woon
    • Aerospace Engineering and Technology
    • /
    • v.12 no.2
    • /
    • pp.131-139
    • /
    • 2013
  • This paper describes the design and implementation of a small avionics unit based on soft CPU. A small avionics unit is developed with the soft CPU which can be wholly implemented in FPGA using logic synthesis. Design and integration of a modular architecture for versatile, reconfigurable and re-adaptable is presented with the Nios-II processor. To gain modular architecture, both at main board and sub-board level, attention has been paid to the selection of interfaces and an adequate data and power bus.

Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites (모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안)

  • Jun, Young-Hun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF

Load analysis for transporting unit module (유닛모듈 운반시 작용하중 분석)

  • Kim, Kyoon-tai;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.200-201
    • /
    • 2015
  • The unit modular method is one in which unit modules are prefabricated at a factory and then constructed at a construction site. That is why an important process, transporting unit module, is added in this method. The purpose of this study is to analyse the load for transporting unit module. The results of the analysis of the driving experimental runs revealed that a maximum load of 15 kN was applied on adapter block type A and a maximum load of 25 kN on adapter block type B. These loads were recorded at the points in the road test when the low-bed trailer was driving through unstable sections of the test such as stopping, restarting, passing over a speed bump or taking a left turn at speed.

  • PDF