• Title/Summary/Keyword: unit load system

Search Result 741, Processing Time 0.029 seconds

The Design of Parallel Processing S/W Using CUDA for Realtime 3D Laser Ladar Imaging System (실시간 3차원 레이저 레이더 영상 생성을 위한 CUDA 기반 병렬처리 소프트웨어 설계)

  • Cho, Yong Il;Ha, Choong Lim;Yang, Ji Hyeon;Kim, Jae Hyup
    • Journal of the Korea Society of Computer and Information
    • /
    • v.18 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • In this paper, we propose a CUDA(Common Unified Device Architecture) based SW(software) design method for CPU(Central Processing Unit) and GPU(Graphic Processing Unit) parallel structure to implement real-time process in 3D Laser ladar(LADAR) imaging system. LADAR is a complex system to generate 3-dimensional image based on the laser ranging information, and requires massive process resources in each phase. Therefore, designing and implementing parallel structure are crucial to realize a real-time process within limited system resource. As a conclusion, we can meet the speed of required real-time process allocating separable work load to CUDA GPU by analyzing process algorithm in each phase and confirm the process speed increase by 46%.

A Study on the Improvement of Fault Detection Capability for Fault Indicator using Fuzzy Clustering and Neural Network (퍼지클러스터링 기법과 신경회로망을 이용한 고장표시기의 고장검출 능력 개선에 관한 연구)

  • Hong, Dae-Seung;Yim, Hwa-Young
    • Journal of the Korean Institute of Intelligent Systems
    • /
    • v.17 no.3
    • /
    • pp.374-379
    • /
    • 2007
  • This paper focuses on the improvement of fault detection algorithm in FRTU(feeder remote terminal unit) on the feeder of distribution power system. FRTU is applied to fault detection schemes for phase fault and ground fault. Especially, cold load pickup and inrush restraint functions distinguish the fault current from the normal load current. FRTU shows FI(Fault Indicator) when the fault current is over pickup value or inrush current. STFT(Short Time Fourier Transform) analysis provides the frequency and time Information. FCM(Fuzzy C-Mean clustering) algorithm extracts characteristics of harmonics. The neural network system as a fault detector was trained to distinguish the inruih current from the fault status by a gradient descent method. In this paper, fault detection is improved by using FCM and neural network. The result data were measured in actual 22.9kV distribution power system.

A Study on the Energy Performance Evaluation of Building Evaporative Cooling System for Building Construction in Response to Climate Change (기후변화 대응 저에너지 건축물 조성을 위한 건축물 기화냉각시스템 에너지성능평가 연구)

  • Kwon, Ki-Uk
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.1
    • /
    • pp.54-60
    • /
    • 2019
  • The recent climate change is exacerbating the external thermal environment and increasing the amount of energy used in building. Energy Plus was used to evaluate low energy technology performance of buildings responding to climate change. The test types of basic building(control) and evaporative mist system + basic building(EMS), and the analysis results of each type are compared. Energy performance evaluation result, Cooling peak load were EMS reduction compared to control is about 9%. Annual cooling load per unit area were EMS reduction compared to control is about 17%. Annual energy use per unit area were EMS reduction compared to control is about 10%. Therefore, the effect of the evaporative cooling system is considered to be good through energy reduction technology of building, according to the amount and distance of the evaporative mist system in the future research on building energy performance evaluation should be carried out.

A Rational Operation Scheduling Using Evolutionary Algorithm on Industrial Cogeneration System (산업용 열병합발전시스템에서 진화 알고리즘을 이용한 합리적 운전계획 수립에 관한 연구)

  • Choi, Kwang-Beom;Jeong, Ji-Hoon;Lee, Jong-Beom
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.49 no.10
    • /
    • pp.494-501
    • /
    • 2000
  • This paper describes a strategy of a daily optimal operational scheduling in cogeneration system for paper mill. The cogeneration system selected to establish the scheduling consists of three units and several auxiliary devices. One unit generates electrical and thermal energy using the back pressure turbine. The rest two units generate the energy using the extraction condensing turbine. Three auxiliary boilers, two waste boilers and three sludge incinerators operate to supply energy to the loads with three units. The cogeneration system is able to supply enough the thermal energy to the thermal load, however it can not sufficiently supply the electrical power to the electrical load. Therefore the insufficient electric energy is compensated by buying electrical energy from utility. When the operational scheduling is performed considering the environmental problem. This paper shows the simulation results for daily operational scheduling obtained using the evolutionary algorithm. This results reveal that the proposed modeling and strategy can be effectively applied to cogeneration system for paper mill.

  • PDF

Out-of-plane behavior of perforated masonry walls strengthened with steel-bar truss system

  • Hwang, Seung-Hyeon;Mun, Ju-Hyun;Yang, Keun-Hyeok;Kim, Sanghee
    • Structural Engineering and Mechanics
    • /
    • v.83 no.6
    • /
    • pp.799-810
    • /
    • 2022
  • This study investigated the effect of the strengthening efficiency of unbonded steel-bar truss system on the out-of-plane behavior of perforated masonry walls. Four full-scale unreinforced masonry (URM) walls with two different planes were prepared using the unbonded steel-bar truss system and a URM walls without strengthening. All masonry walls were tested under constant axial and cyclic lateral loads. The obtained test results indicated that the pinching effect in the out-plane behavior of masonry walls tends to decrease in the in- and out-of-plane strengthened URM walls using the unbonded steel-bar truss system with the higher prestressing force ratio (Rp) of vertical reinforcing bars in the unbonded steel-bar truss system, regardless of the perforated type of the masonry wall. Consequently, the highest maximum shear resistance and cumulative dissipated energy at peak load in the post-peak behavior were observed in the in- and out-plane strengthened URM walls with the highest Rp values, which are 2.7 and 6.0 times higher than those of URM. In particular, the strengthening efficiency of the unbonded steel-bar truss system was primarily attributed to the vertical prestressed steel-bars rather than the diagonal steel-bars, which indicates that the strains in the vertical prestressed steel-bars at the peak load were approximately 1.6 times higher than those in the diagonal steel-bars.

Voltage Control of a Synchronous Generator for Ship using a Compound Type Digital AVR (혼합형 디지털 자동 전압 조정 장치를 이용한 선박용 동기발전기의 출력전압제어)

  • Park, Sang-Hoon;Lee, Sang-Seuk;Yu, Jae-Sung;Lee, Su-Won;Won, Chung-Yuen
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.397-403
    • /
    • 2009
  • In this paper, an exciter current control of a synchronous generator for ships using a compound type digital automatic voltage regulator (DVAR) in order to provide a constant output voltage of the generator is presented. The compound type DAVR is composed of a controller part to adjust output voltage and an power source unit to supply power to the exciter. The controller part, which generates the PWM switching pattern via the PI controller, drives a power MOSFET for bypass to limit the SG's exciter current. The power source unit part is parallel connected to an output terminal of the generator through a reactor and a power CT. The residual magnetic flux of SG provides exciter current to the exciter through the reactor during the initial running or no load state and load current supplies field current to the exciter through the power CT during loading state. This paper confirmed an experiment to verify the validity of compound type DAVR system for controlling output voltage of synchronous generator.

Dynamic Response of Drill Floor to Fire Subsequent to Blowout

  • Kim, Teak-Keon;Kim, Seul-Kee;Lee, Jae-Myung
    • Journal of Ocean Engineering and Technology
    • /
    • v.34 no.2
    • /
    • pp.110-119
    • /
    • 2020
  • Explosions and fires on offshore drilling units and process plants, which cause loss of life and environmental damage, have been studied extensively. However, research on drilling units increased only after the 2010 Deepwater Horizon accident in the Gulf of Mexico. A major reason for explosions and fires on a drilling unit is blowout, which is caused by a failure to control the high temperatures and pressures upstream of the offshore underwater well. The area susceptible to explosion and fire due to blowout is the drill floor, which supports the main drilling system. Structural instability and collapse of the drill floor can threaten the structural integrity of the entire unit. This study simulates the behavior of fire subsequent to blowout and assesses the thermal load. A heat transfer structure analysis of the drill floor was carried out using the assessed thermal load, and the risk was noted. In order to maintain the structural integrity of the drill floor, passive fire protection of certain areas was recommended.

Characteristics of Pollutant Loads and Water Quality in Kwangyang Bay, Korea

  • Lee Dae-In;Park Chung-Kil;Cho Hyeon-Seo
    • Fisheries and Aquatic Sciences
    • /
    • v.6 no.3
    • /
    • pp.149-154
    • /
    • 2003
  • The characteristics of pollutant loads from the various sources and seawater quality in Kwangyang Bay were evaluated. Total flow rate was estimated to be $10,868,066.8 m^3/day$ with a flow rate of R2l (the Seomjin River) as the highest one. Total COD, TN and TP loads of the input rivers and the ditches were about 27,591.8, 25,029.6 and 586.4 kg/day, respectively. Wastewater discharging loads was the greatest contributors to pollutant loads in the inner part of Kwangyang Bay. COD values in the inner part of the bay was over 3.0 mg/L, which exceeded the seawater quality criteria III of Korea. The average values of DIN and DIP were 8.62 ${\mu}gN/L\;and\;1.26\;{\mu}gP/L$, respectively. The limiting factor for algal growth was DIN. In he total discharging loads of the watershed from unit loading estimations, BOD, TN and TP were 9,132.3, 2,727.2 and 304.2 kg/day, respectively. In addition, municipal sewage by the population as pollution sources and the city of Kwangyang as administrative district had the highest loads. For a appropriate water quality recovery of Kwangyang Bay, it is suggested that it is essential to estimate reduction rate of total pollutant loads by water quality modeling.

Development of control system for complex microbial incubator (복합 미생물 배양기의 제어시스템 개발)

  • Hong-Jik Kim;Won-Bog Lee;Seung-Ho Lee
    • Journal of IKEEE
    • /
    • v.27 no.1
    • /
    • pp.122-126
    • /
    • 2023
  • In this paper, a control system for a complex microbial incubator was proposed. The proposed control system consists of a control unit, a communication unit, a power supply unit, and a control system of the complex microbial incubator. The controller of the complex microbial incubator is designed and manufactured to convert analog signals and digital signals, and control signals of sensors such as displays using LCD panels, water level sensors, temperature sensors, and pH concentration sensors. The water level sensor used is designed and manufactured to enable accurate water level measurement by using the IR laser method with excellent linearity in order to solve the problem that existing water level sensors are difficult to measure due to foreign substances such as bubbles. The temperature sensor is designed and used so that it has high accuracy and no cumulative resistance error by measuring using the thermal resistance principle. The communication unit consists of two LAN ports and one RS-232 port, and is designed and manufactured to transmit signals such as LCD panel, PCT panel, and load cell controller used in the complex microbial incubator to the control unit. The power supply unit is designed and manufactured to supply power by configuring it with three voltage supply terminals such as 24V, 12V and 5V so that the control unit and communication unit can operate smoothly. The control system of the complex microbial incubator uses PLC to control sensor values such as pH concentration sensor, temperature sensor, and water level sensor, and the operation of circulation pump, circulation valve, rotary pump, and inverter load cell used for cultivation. In order to evaluate the performance of the control system of the proposed complex microbial incubator, the result of the experiment conducted by the accredited certification body showed that the range of water level measurement sensitivity was -0.41mm~1.59mm, and the range of change in water temperature was ±0.41℃, which is currently commercially available. It was confirmed that the product operates with better performance than the performance of the products. Therefore, the effectiveness of the control system of the complex microbial incubator proposed in this paper was demonstrated.

Development of the Embedded System-based Real-time Internal Status Identification System for Overhead Bin (임베디드 시스템 기반 오버헤드 빈 내부 상황 실시간 식별 시스템 개발)

  • Jaeeun Kim;Hyejung Lim;Sungwook Cho
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.2
    • /
    • pp.111-119
    • /
    • 2023
  • Internal storage state, weight data, and weight-centered calculation values for overhead bin can all be seen in this paper's real-time internal status identification system. The suggested system offers such valuable data via a range of sensors, including load cells and switch arrays. The proposed system could locate internal free space, locate the center of gravity, and give real-time visual information. It was developed utilizing an embedded system and the C programming language. These features led to the creation of smart overhead bins and real-time cargo loading monitoring technologies, both of which could one day aid in the creation of a cargo loading automation system.