• Title/Summary/Keyword: unit cost

Search Result 2,130, Processing Time 0.028 seconds

PM Policy with Random Maintenance Quality Following the Expiration of Non-Renewing Warranty (비재생보증이 종료된 이후의 확률적 보전효과를 갖는 예방보전정책)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.15 no.1
    • /
    • pp.77-86
    • /
    • 2008
  • This paper develops the optimal periodic preventive maintenance policy following the expiration of non-renewing warranty. We assume that Wu and Clements-Croome's (2005) periodic PM model with random maintenance quality is utilized to maintain the system after the non-renewing warranty is expired. Given the cost structure to the user during the cycle of the product, we drive the expressions for the expected cost rate per unit time. Also, we obtain the optimal number and the optimal period by minimizing the expected cost rate per unit time. The numerical examples are presented for illustrative purpose.

Replacement Model Following the Expiration of Free RRNMW (무료 재생교체-비재생수리보증이 종료된 이후의 교체모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.18 no.6
    • /
    • pp.697-705
    • /
    • 2011
  • This paper proposes an optimal replacement policy following the expiration of a free renewing replacement-non-renewing minimal repair warranty. To do so, the free renewing replacement-non-renewing minimal repair warranty is defined and then the maintenance model following the expiration of free renewing replacement-non-renewing minimal repair warranty from the user's point of view is studied. As the criteria to determine the optimality of the maintenance policy, we consider the expected cost rate per unit time from the user's perspective. We derive the expressions for the expected cycle length and the expected total cost to obtain the expected cost rate per unit time. Finally, the numerical examples are presented for illustrative purposes.

Preventive maintenance model following the expiration of NFRRW (비재생무료교체-수리보증이 종료된 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Journal of the Korean Data and Information Science Society
    • /
    • v.22 no.4
    • /
    • pp.775-784
    • /
    • 2011
  • In this paper, we consider the periodic preventive maintenance model for repairable system following the expiration of non-renewing free replacement-repair warranty (NFRRW). Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.

Comparing Various Types of Stacking Methods Considering Relocations (적재형태별 재취급을 고려한 기대취급횟수 비교)

  • Park Twae-Kyung;Kim Kap-Hwan
    • Journal of Intelligence and Information Systems
    • /
    • v.12 no.2
    • /
    • pp.83-98
    • /
    • 2006
  • When unit loads are stacked in multiple tiers, as the number of tiers increases, the space consumption per unit load decreases; at the same time, the number of relocations during retrieval operations increases. This study derives formulas fur estimating the expected number of relocations for retrieving a random unit load from various types of stacks with different combinations of the number of rows, the number of columns, and the number of tiers. Based on the derived formulas, the handling cost and the space cost of the different types of stacks are compared with each other.

  • PDF

Effect of Re-liquefaction System on Operating Expenditure of LNGC in Terms of Fuel Oil Consumption Cost and BOG Combustion Cost (천연가스 운반선의 재액화 장치가 운항비용에 미치는 영향에 관한 연구: 연료비용 및 증발 가스 연소비용 관점에서)

  • You, Youngjun;Lee, Joon Chae
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.57 no.3
    • /
    • pp.152-159
    • /
    • 2020
  • Ship owners had pursued higher benefits by demanding the new design and construction of ships with higher operational efficiency. There was a necessity for shipyards to suggest a more economical design and advanced operation concept in order to meet the demands. Especially, since BOG combustion and activation of the re-liquefaction unit had to be taken into account in ship design in addition to fuel oil and gas consumption, the evaluation of the operating efficiency considering the technological trends was necessary. In this paper, it was aimed to study the design philosophy and operation strategy by considering the effect of fuel oil and gas consumption, BOG combustion, and activation of the re-liquefaction unit on the operating cost for laden voyage according to ship speed, BOR, and activation of the re-liquefaction unit. For this purpose, the costs were acquired by conducting the sailing simulation of an LNGC based on a mathematical model including the maneuvering equations of motion. The design philosophy and operation strategy was reviewed in terms of the operating cost.

Preventive Maintenance Model after Minimal Repair Warranty (최소수리보증 이후의 예방보전모형)

  • Jung, Ki-Mun
    • Communications for Statistical Applications and Methods
    • /
    • v.17 no.6
    • /
    • pp.865-877
    • /
    • 2010
  • This paper considers the periodic preventive maintenance model for a repairable system following warranty expiration. We consider three types of warranty policies: free repair warranty, pro-rata repair warranty, and combination repair warranty. Under these preventive maintenance models, we derive the expressions for the expected cycle length, the total expected cost, and the expected cost rate per unit time. In addition, we explain the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for a Weibull distribution case.

Basic Study on the Measurement of Unit Productivity Data By Image Processing Technology (이미지 프로세싱을 활용한 생산성 정보 측정방안에 관한 연구)

  • Lee, Chan-Kyu;Lee, Seung-Hyun;Son, Jae-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.281-282
    • /
    • 2012
  • Construction performance and productivity improvement are key focus areas in construction industry for any nation. There have been frequent delays and cost overruns in construction projects and poor productivity is one of the major contributions. For this reasons, there have been many research studies performed on the improvement of construction productivity for several decades. However, measuring productivity on a construction job site is still not an easy work. Because collecting reliable data consistently from the job site requires a lot of personnel efforts causing extra time and cost. This paper provides a basic study on the application of image processing technology for measuring unit productivity. It presented the possibility of unit productivity measurement by image processing technology through case study.

  • PDF

Performance Analysis of a Parallel System Having a Cold Standby Unit

  • Sharma, S.C.;Bae, S.;Baek, J.B.;Singh, K.P.
    • International Journal of Reliability and Applications
    • /
    • v.8 no.1
    • /
    • pp.67-82
    • /
    • 2007
  • This paper deals with the effectiveness analysis of an engineering system, which has two units of different strengths in parallel and one unit as a cold standby unit. Failure times for all the units have negative exponential distribution whereas their repair times have general distribution. Single server caters the need for the system. The effectiveness analysis of the system is done by using regenerative point technique. The different measures of effectiveness such as mean sojourn time, mean time to system failure, availability, busy period, etc, are derived. Cost factors also taken into consideration.

  • PDF

Insulation Performance Evaluation of the Curtain Wall Anchoring Unit by 3D Heat Transfer Simulation and Life Cycle Cost Analysis (3차원 전열해석 및 생애비용 분석을 통한 커튼월 앵커링 유닛의 단열성능 향상 방안 평가)

  • Kang, Seung-Hee;Song, Seung-Yeong
    • Journal of the Korean Solar Energy Society
    • /
    • v.23 no.4
    • /
    • pp.63-70
    • /
    • 2003
  • It is very important to improve the insulation performance of curtain wall anchoring unit since it is composed of materials with high thermal conductivity, such as aluminium, steel and so on. This study aims to evaluate the heating energy performance and economical efficiency of various alternatives which are different in position and material of insulation. As results, alternative of inserting the urethane washer & pad and coating the anchoring unit with urethane foam can improve the heating energy performance and L.C.C(Life Cycle Cost) by 6.33% and 0.95%, respectively, as compared with the existing case.

A New Algorithm for Unit Commitment (기동정지계획의 새로운 해법)

  • Lee, Sang-Do;Baek, Young-Sik
    • Proceedings of the KIEE Conference
    • /
    • 1996.07b
    • /
    • pp.704-706
    • /
    • 1996
  • This paper presents a new algorithm of unit commitment for optimal operation in power system. The proposed method developed algorithm that determined generators considering load variations at each stages. It has established forecast unit commitment over time horizon at first and next calculated quality cost of generators and then committed generator that has minimum quality cost at unit commitment schedule over time horizon. It is used that Objet-Oriented Programming for effective realization, and simple handling of complex program. The proposed method has applied at example system and the results has shown superior economics and computational requirement than the conventional method.

  • PDF