• 제목/요약/키워드: underground transportation infrastructure

검색결과 22건 처리시간 0.024초

Oil Field Geographical Information System Based on Remote Sensing, GIS and GPS

  • Wang, Ziyu;Chen, Xiuwan
    • 대한원격탐사학회:학술대회논문집
    • /
    • 대한원격탐사학회 2003년도 Proceedings of ACRS 2003 ISRS
    • /
    • pp.1310-1311
    • /
    • 2003
  • Oil Field Geographical Information System (OFGIS) manages multiple spatial data, attribute data, and topographic data, which include almost every kind of ground info rmation and underground information. Subsystems managed by OFGIS include petroleum exploration subsystem (PESS), petroleum development and engineering subsystem (PDESS), petrochemical subsystem (PCSS), petroleum storage and transportation subsystem (PSTSS), petroleum sale subsystem (PSSS), etc. A basic OFGIS framework consists of oil field infrastructure coverage (OFIC), oil field specialized information coverage (OFSIC) and oil field synthesis and decision service coverage (OFSDSC). Basic function of OFGIS includes database management, geographic information management, spatial information processing and application.

  • PDF

Feasibility Analysis on Ground-level Stations and Wireless Power Transfer Technology Applications for Monorail System

  • Hwang, Karam;Chung, Jong-Duk;Lee, Kibeom;Tak, Junyoung;Suh, In-Soo
    • International Journal of Railway
    • /
    • 제7권3호
    • /
    • pp.71-79
    • /
    • 2014
  • Subway systems have been a proved method of public transport and are widely used in major cities around the world. However, the time and cost it takes to construct such systems are very high, as it requires underground tunnels. Cities in various countries have implemented monorail systems as public railway transport as it can be more economical and quicker compared to subway systems in terms of construction. In addition, it provides more convenience towards the public as it is not affected to traffic, and also provides an aerial view of the city. However, the overall construction cost for monorail systems is still significantly high, and as a possible solution to further reduce the overall cost, implementation of ground-level stations and wireless power transfer technology has been proposed in this paper. A concept application layout of ground-level stations and wireless power transfer systems has been discussed, using the Daegu monorail Line 3 system as a simulation base. The expected cost for monorail systems implementing ground-level stations and/or wireless power transfer technology has been estimated based on literature survey, and was compared with the current construction cost of Daegu monorail system. Based on comparison, it has shown that implementation of ground-level stations are the most economical, and can be easily implemented for either starting or expanding the monorail line. Implementation of wireless power transfer technology is also economical, but is more feasible when starting a new monorail line as it requires components which will alter the configuration of the train and infrastructure.

철도시설 공간정보DB 구축을 위한 법제도 개선방안 (Improvement of Regulations for Establishing Spatial Information Data Base of Railway Facilities)

  • 정성봉;최지호;원종운;김동선
    • 대한토목학회논문집
    • /
    • 제37권1호
    • /
    • pp.187-193
    • /
    • 2017
  • 정부는 국가공간정보 활용 기반 마련을 위해 1995년부터 국가 GIS (Geographic Information System)사업을 통해 토지, 도로, 지하시설물, 통계 등 다양한 분야의 GIS활용체계를 구축 운영해 오고 있다. 이러한 기반 하에서 공간정보산업에 대한 중요성이 부각됨에 따라, 국토교통부는 "국가공간정보정책 기본계획"과 "국가공간정보정책 시행계획"을 수립하여, 국가교통분야의 공간정보구축 및 제공을 위한 구체적인 방안을 마련하고 있다. 하지만, 타 분야에 비해 철도 및 철도 관련 시설에 대해서는 공간정보가 체계적으로 구축 제공되지 않고 있다. 즉, 국가공간정보 통합DB에서도 볼 수 있듯이 연계 정보로서의 '교통정보'와 행정정보로서의 '교통'항목이 포함되어 있을 뿐 구체적인 철도 및 철도 관련 시설물에 대한 공간정보에 대한 내용은 부재한 상황이다. 이는 철도 및 관련 시설물에 대한 정보구축 및 활용에 관한 법 제도가 미비하여, 실제 구축사업 및 활용방안에 대한 연구가 부재하기 때문이다. 이에 본 연구에서는 국가공간정보포털의 교통시설 공간정보 DB 구축 동향을 검토하였고, 철도 및 공간정보 관련 법제도를 분석하였으며, 이를 통해 철도 및 관련 시설물의 공간정보 구축 관리 운영 관련 조직설립, 정보 구축 및 관리 관련, 정보 활용관련 법 제도 개선방안을 제시하였다. 본 연구를 토대로 향후 국가 통합공간 정보 내에 다양한 공간정보를 제공하는데 도모할 것이며, 철도 선로 및 시설물에 대한 통합 시설관리, 진보된 유지보수 시스템 등을 구축할 수 있을 것이다.

미래도시 전망 분석 (An Analysis on the Expert Opinions of Future City Scenarios)

  • 조성수;백효진;한정훈;이상호
    • 지역연구
    • /
    • 제35권3호
    • /
    • pp.59-76
    • /
    • 2019
  • 본 연구의 목적은 미래도시의 모습을 시나리오로 만들고, 델파이 분석을 통해 미래도시 변화의 시기와 실현 가능성을 분석하는 것이다. 미래도시 시나리오는 빅데이터 분석과 환경스캐닝 기법, 문헌연구를 통해 도시구조, 토지 이용, 교통 및 인프라, 도시개발로 도출되었다. 델파이는 우리나라와 미국, 영국, 호주, 일본, 중국, 인도 등 6개국 24명의 전문가를 통해 진행되었다. 델파이 구조는 시나리오의 실현 가능성을 리커트 5점 척도로 전망할 수 있도록 구성하였으며, 실현 시기를 근미래(10년 이하), 중미래(10~20년), 먼미래(20년 이상)로 설정하였다. 연구의 분석결과는 다음과 같다. 첫째, 도시구조는 단기적으로 수위 및 광역 대도시(Global and Mega-City)를 중심으로 집중되며, 중장기적으로 지방 중소도시는 쇠퇴할 것으로 전망되었다. 둘째, 토지 이용은 근미래에 수직적, 수평적으로 혼합될 것이며, 공유 공간이 증가될 것으로 예측되었다. 셋째, 교통 및 인프라는 ICT 기반의 통합 플랫폼을 통한 도시관리가 진행되며, 스마트 기술을 통해 공공 및 개인(민간) 교통이 활성화될 것으로 분석되었다. 넷째, 도시개발은 교통 결절지(TOD) 중심의 개발이 활성화될 것이며, 에너지 및 환경 분야에 중점을 둘 것으로 전망되었다.

Stability assessment of tunnel face in a layered soil using upper bound theorem of limit analysis

  • Khezri, Nima;Mohamad, Hisham;Fatahi, Behzad
    • Geomechanics and Engineering
    • /
    • 제11권4호
    • /
    • pp.471-492
    • /
    • 2016
  • Underground tunnelling is one of the sustainable construction methods which can facilitate the increasing passenger transportation in the urban areas and benefit the community in the long term. Tunnelling in various ground conditions requires careful consideration of the stability factor. This paper investigates three dimensional stability of a shallow circular tunnel in a layered soil. Upper bound theorem of limit analysis was utilised to solve the tunnel face stability problem. A three dimensional kinematic admissible failure mechanism was improved to model a layered soil and limiting assumptions of the previous studies were resolved. The study includes calculation of the minimum support pressure acting on the face of the excavation in closed-face excavations. The effects of the characteristics of the layers on the minimum support pressure were examined. It was found that the ratio of the thickness of cover layers particularly when a weak layer is overlying a stronger layer, has the most significant influence on the minimum tunnel support pressure. Comparisons have been made with the results of the numerical modelling using FLAC3D software. Results of the current study were in a remarkable agreement with those of numerical modelling.

세종특별자치시의 발전을 위한 교통체계 연구 (The Research on Transportation Systems Development in Sejong City)

  • 주용준;류창수;박효순
    • 한국정보통신학회논문지
    • /
    • 제18권11호
    • /
    • pp.2738-2744
    • /
    • 2014
  • 전 국토가 골고루 발전할 수 있는 세종시가 조기에 정착할 수 있는 방법 중 교통 인프라 구축이 가장 선행되어야 한다. 여러 가지 교통수단이 있지만, 본 연구에서는 BRT(Bus Rapid Transit)와 철도를 중심으로 연구하였다. 건설비가 지하철보다 10분의 1에 불과하지만, 지하철의 시스템을 갖추어 수송능력을 크게 높이는 신개념 대중교통수단 BRT, 기존선을 활용하여 건설하는 충청권 광역철도가 있다. 또한, 대전지하철 1호선을 정부세종청사까지 연장 운행하여 중앙행정기관 이전과 세종시 인구유입에 따른 교통수요의 급격한 증가에 대비하여 교통편익을 제공하고 세종시에 새로운 교통수단이 추가로 건설하여 인근 지역과 상생 발전을 기대할 수 있다.

도심지 대심도 터널 건설을 위한 제도개선 방안 연구 (A study of measures to improve the system for the construction of deep tunnels in urban area)

  • 문훈기;문준식;신종호
    • 한국터널지하공간학회 논문집
    • /
    • 제25권6호
    • /
    • pp.469-478
    • /
    • 2023
  • 도심지 대심도 터널은 자동차와 열차가 다니던 지상공간을 친환경적인 공원으로 시민에게 돌려주고, 지하는 복합적인 교통인프라 시설의 구축이 가능한 미래지향적인 건설방안이다. 하지만 일부 언론과 영화에서 터널공사는 지반침하, 붕괴 등의 재난의 대상으로 묘사하는 경우가 종종 있었다. 실제로 대부분의 도심지 대심도 터널공사 진행 과정에서 노선 부근 주민의 굴착 반대 민원으로 인해 사업추진에 어려움을 겪고 있다. 본 연구에서는 대심도 터널과 관련된 시민여론조사를 통해서 지하 공간개발에 대한 인식과 대심도 터널 공사에 대한 시민 우려사항을 파악하고 이해관계자의 손실보상에 대한 의견을 조사하였다. 대심도 터널공사와 관련된 현행법령을 검토하여 공사단계별 공공참여 가능성을 분석하고 지하공간의 보상과 관련된 구분지상권에 대하여 살펴보았다. 여론조사에서 시민이 우려하는 대심도 터널공사의 이슈사항이 현행기술로 해결 가능한 문제임을 파악하고 공공참여를 통해 터널공사의 안정성을 확신시키기 위한 제도적 개선 방향과 구분지상권 설정에 이해관계자의 협조를 증진하려는 개선방안을 제시하였다.

부시네스크 식을 이용한 인접 센서 데이터 추세 분석 기반 손망실 계측 센서 데이터 추정 기법 (Lost measurement sensor data estimation technology based on trend analysis of adjacent sensors using Boussinesq equation)

  • 최상일;심승보;공석민;이성원
    • 한국터널지하공간학회 논문집
    • /
    • 제23권4호
    • /
    • pp.221-232
    • /
    • 2021
  • 유지관리에 활용되는 계측 센서들은 교통 수단 통행 및 강우와 같은 다양한 환경적인 요인에 지속적으로 노출됨으로써 손망실 가능성이 점차 증가하게 된다. 관련 연구에 따르면, 국내 지하철 터널 유지관리 계측 센서는 설치 후 약 5~6년이 경과한 상태에서 평균 14.2~14.8%의 손망실율을 보이고, 국외의 경우에는 동일 기준 약 13.9%로 국내외 평균 15%의 유지관리 계측 센서가 5~6년이 지난 후 정상적인 계측 값을 제공하지 못한다는 것을 알 수 있다. 원활한 유지관리를 위해서는 손망실 계측 센서에 대한 보수 및 교체를 통해 해당 계측 데이터를 확보해야 하지만, 일부 손망실된 계측 센서의 경우에는 설치 후 매립되어 유지보수 비용에 단순한 장비 구입만이 아닌 재시공까지 포함되는 등 계측 센서 보수에는 많은 시간 및 비용이 소요되고 이로 인한 지속적인 데이터 손실이 발생한다. 따라서 본 논문에서는 손망실 계측 센서의 보수 및 교체 기간 동안 일시적으로 손실되는 데이터를 추정치로서 보완하여 끊김 없는 인프라 유지관리를 지원할 수 있는 인접 센서 데이터 추세 분석 기반 손망실 계측 센서 데이터 추정 기법을 제안한다.

지하철에서 스마트폰 센서를 이용한 사용자 위치 추적 방법 (A User's Location Localization Method using Smartphone Sensor on a Subway)

  • 조정길
    • 한국융합학회논문지
    • /
    • 제11권3호
    • /
    • pp.37-43
    • /
    • 2020
  • 스마트폰 기반의 추적은 다양한 시나리오에서 널리 연구되어왔다. 그러나 우리가 아는 한, GPS 신호 및 무선 인프라가 항상 이용 가능하지 않는 지하 대중교통 시스템의 추적 문제를 해결한 연구는 극소수에 불과하다. 전동차의 위치를 아는 것은 지하철 승객에게 유용한 서비스를 개발하는데 필요하다. 따라서 지하철 승객을 대상으로 스마트폰 센서를 이용하여 모션 상태 및 정차역을 추정하는 방법이 연구되고 있다. 이 논문에서는 스마트폰의 기압계와 자기 센서를 이용하는 추적 방법을 제안한다. 이 논문에서 제안된 방법은 먼저 기압의 변동 및 자기장의 세기에 따라 전동차가 운행하는지 정차하는지를 추정한다. 그 다음에 고도 값과 자기장 값으로 전동차가 정차하는 정확한 역을 추정한다. 우리는 서울의 지하철 5호선 데이터를 사용하여 제안된 방법을 평가했다. 이전 방법과 비교하여 제안된 방법은 더 높은 정확성을 얻었다.

The responses of battered pile to tunnelling at different depths relative to the pile length

  • Mukhtiar Ali Soomro;Naeem Mangi;Dildar Ali Mangnejo;Zongyu Zhang
    • Geomechanics and Engineering
    • /
    • 제35권6호
    • /
    • pp.603-615
    • /
    • 2023
  • Population growth and urbanization prompted engineers to propose more sophisticated and efficient transportation methods, such as underground transit systems. However, due to limited urban space, it is necessary to construct these tunnels in close proximity to existing infrastructure like high-rise buildings and bridges. Battered piles have been widely used for their higher stiffness and bearing capacity compared to vertical piles, making them effective in resisting lateral loads from winds, soil pressures, and impacts. Considerable prior research has been concerned with understanding the vertical pile response to tunnel excavation. However, the three-dimensional effects of tunnelling on adjacent battered piled foundations are still not investigated. This study investigates the response of a single battered pile to tunnelling at three critical depths along the pile: near the pile shaft (S), next to the pile (T), and below the pile toe (B). An advanced hypoplastic model capable of capturing small strain stiffness is used to simulate clay behaviour. The computed results reveal that settlement and load transfer mechanisms along the battered pile, resulting from tunnelling, depend significantly on the tunnel's location relative the length of the pile. The largest settlement of the battered pile occurs in the case of T. Conversely, the greatest pile head deflection is caused by tunnelling near the pile shaft. The battered pile experiences "dragload" due to negative skin friction mobilization resulting from tunnel excavation in the case of S. The battered pile is susceptible to induced bending moments when tunnelling occurs near the pile shaft S whereas the magnitude of induced bending moment is minimal in the case of B.