• Title/Summary/Keyword: underground mining

Search Result 301, Processing Time 0.031 seconds

Application of Digital Image Correlation Method for Measurement of Rock Pillar Displacement and Vibration Due to Underground Mine Blasting (지하 광산발파에 따른 암반광주의 변위 및 진동 측정을 위한 이미지 영상 상관법 적용연구)

  • Ko, Young-Hun;Seo, Seung-Hwan;Lim, Hyun-Sung;Jin, Tai-Lie;Chung, Moon-Kyung
    • Explosives and Blasting
    • /
    • v.37 no.4
    • /
    • pp.1-9
    • /
    • 2019
  • In this study the applicability of a Digital Image Correlation (DIC) method was investigated by measuring the displacement and vibration of rock pillar due to underground mining blasting. When combined with a high speed photography technology, the DIC method provides an excellent photographic image processing ability that can be used to convert the evolving full-field surface properties of structures to 2D or 3D set of coordinate values. The measured coordinate sets are then used to calculate the displacement, strain, and velocity of the target structure. This technique is widely used in science and engineering, and continuously finds its new application areas. In this study, the DIC system and the conventional seismograph were compared for their ability to measure the displacement and vibration produced by blasting. In the field test both methods showed similar results. Thus, it is concluded that the DIC method is feasible to measure the ground displacements and vibrations from blasting.

A Basic Study on Real Time 3D Location-Tracking in Ground and Underground Using MEMS Sensor (MEMS 센서를 이용한 지상 및 지하에서의 실시간 3차원 위치추적 기술에 관한 기초적 연구)

  • Seol, Munhyung;Jang, Yonggu;Jeon, Heungsoo;Kang, Injoon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.4
    • /
    • pp.47-52
    • /
    • 2013
  • In Korea, the number of mining operations are getting smaller. But buried accidents are on the increase every year. For this reason, it is important to safety management in construction process, especially the worker's safety. In the field of construction needs utilization of integration system according to purpose of utilization, particularly in underground construction sites utilizing is emphasized even more. The current element technologies of location tracking, sensors and wireless communication possible to utilize but it is still difficult to utilization of integration system in construction field because a study is not complete on commercialization and availability. In this study, for real time 3-dimensional management of ubiquitous construction site in ground and underground, measure data using MEMS sensor, EDM and DGPS in 2 test site. Also results were analysed by MATLAB. As a result, error is verification less than 3 meter that possible to distinguish with the naked eye and construct direction of study based on result of former.

Principles and application of DC resistivity tomography and borehole radar survey. (전기비저항 토모그래피와 시추공 레이다 탐사의 원리 및 응용)

  • Kim Jung-Ho;Yi Myeong-Jong;Cho Seong-Jun;Song Yoon-Ho;Chung Seung-Hwan
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.92-116
    • /
    • 1999
  • Tomographic approaches to image underground structure using electrical properties, can be divided into DC resistivity, electromagnetic, and radar tomography, based on the operating frequency. DC resistivity and radar tomography methods have been recently applied to site investigation for engineering purpose in Korea. This paper review these two tomography methods, through the case histories acquired in Korea. As another method of borehole radar survey, borehole radar reflection method is included, and its inherent problem and solution are discussed, how to find the azimuth angle of reflector using direction-finding-antenna. Since the velocity anisotropy of radar wave has been commonly encountered in field data, anisotropic radar tomography is discussed in this paper. In DC resistivity tomography, two subjects are focussed, electrode arrays, and borehole effect owing to the conductive fluid in borehole. Using the numerical modeling data, various kinds of electrode ways are compared, and borehole effect is illustrated. Most of the case histories presented in this paper are compared with known geology, core logging data, and/or Televiewer images.

  • PDF

The Application of Observational Method for Tunnel Analysis in Gneiss Rock (편마암에서 계측결과와 RMR을 이용한 터널의 거동 연구)

  • Jeong, Kang-Jin;Kim, Chan-Kuk;Hwang, Eui-Seok;Kim, Hak-Moon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.916-924
    • /
    • 2006
  • This research concentrates on presenting a more reasonable and engineering tunnel interpretation method with the numerical value observation data using the Hoek-Brown Model that uses mining observation data gained during construction, and the experience material constant of m and s for Seoul Underground tunnel field, which was evaluated as RMR III and RMR IV for its bedrock ratings, and by modifying and complementing the properties of ground materials with the direct method, one method in back analysis, and by using the field measurement value.

  • PDF

Complex analysis of rock cutting with consideration of rock-tool interaction using distinct element method (DEM)

  • Zhang, Guangzhe;Dang, Wengang;Herbst, Martin;Song, Zhengyang
    • Geomechanics and Engineering
    • /
    • v.20 no.5
    • /
    • pp.421-432
    • /
    • 2020
  • Cutting of rocks is very common encountered in tunneling and mining during underground excavations. A deep understanding of rock-tool interaction can promote industrial applications significantly. In this paper, a distinct element method based approach, PFC3D, is adopted to simulate the rock cutting under different operation conditions (cutting velocity, depth of cut and rake angle) and with various tool geometries (tip angle, tip wear and tip shape). Simulation results showed that the cutting force and accumulated number of cracks increase with increasing cutting velocity, cut depth, tip angle and pick abrasion. The number of cracks and cutting force decrease with increasing negative rake angle and increase with increasing positive rake angle. The numerical approach can offer a better insight into the rock-tool interaction during the rock cutting process. The proposed numerical method can be used to assess the rock cuttability, to estimate the cutting performance, and to design the cutter head.

On Monitoring of Induced Stress and Displacement for Support Design around Tunnel in Weak Rock (연약 암반내 터널 보갱법 설계를 위한 2차 응력 및 변위 계측에 관한 연구)

  • 임한욱;이상은
    • Tunnel and Underground Space
    • /
    • v.4 no.3
    • /
    • pp.297-304
    • /
    • 1994
  • This study aimed at analysis of induced stress and deformation behavior in rock mass around coal seams of Sam Chuck coal mine. For this study Vibrating Wire Stressmeters and Multi-point Borehole Extensometers were installed in the area of coal shale near coal seams. Induced stress and displacement in this area were coutinuously increased for 6 days from the begining of measurement, and then converged. But induced stress and displacement occurred when there were another openings by tunnelling and mining. The value of final induced stress was 21.8kgf/$\textrm{cm}^2$, displacement of rod extensometer was 1.3 mm at arch. Especially, over 1 mm of displacement between E2 and E3 in rod extensometer was measured.

  • PDF

Application on Cable bolt as Tunnel Support System (터널 보강재로서의 케이블 볼트의 적용성 평가)

  • Kim, Young-Ho;Yoo, Chan-Ho;Han, Beom-Seok;Kim, Seoung-Wook;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1530-1535
    • /
    • 2009
  • The cable bolt is useful underground space support system such as mining in Europe. In spite of favorable strength characteristics, past record of the cable bolt is rarely in Korea. In this study, to evaluate the mechanically characteristics the cable bolt on tunnel support system. To conduct the laboratory strength test in order to enquire material properties as reinforcement material and numerical analysis was performed considering laboratory test results. To estimate the behavior characteristics on tunnel system in which supported by the cable bolt system and compared the behavior characteristics with the rebar rock bolt system result.

  • PDF

Case study of microseismic techniques for stability analysis of pillars in a limestone mine (석회석 광산 내 광주의 안정성 분석을 위한 미소진동 계측기술의 현장적용)

  • Kim, Chang Oh;Um, Woo-Yong;Chung, So-Keul;Cheon, Dae-Sung
    • Tunnel and Underground Space
    • /
    • v.26 no.1
    • /
    • pp.1-11
    • /
    • 2016
  • This study deals with the case that was the field application of the microseismic monitoring techniques for the stability monitoring in a domestic mine. The usefulness and limitations of the microseismic techniques were examined through analyzing the microseismic monitored data. The target limestone mine adopted a hybrid room-and-pillar mining method to improve the extraction ratio. The accelerometers were installed in each vertical pillar within the test bed which has the horizontal cross-section $50m{\times}50m$. The measured signals were divided into 4 types; blasting induced signal, drilling induced signal, damage induced signal, and electric noise. The stability analysis was performed based on the measured damage induced signals. After the blasting in the mining section close to the test bed, the damage of the pillar was increased and rockfall near the test bed could be estimated from monitored microseismic data. It was possible to assess the pillar stability from the changes of daily monitored data and the proposed safety criteria from the accumulated monitored data. However, there was a difficulty to determine the 3D microseismic source positions due to the 2D local sensor arrays. Also, it was needed to use real-time monitoring methods in domestic mines. By complementing the problems encountered in the mine application and comparing microseismic monitored data with mining operations, the microseismic monitoring technique can be used as a better safety method.

Automatic Determination of the Azimuth Angle of Reflectors in Borehole Radar Reflection Data Using Direction-finding Antenna (방향탐지 안테나를 이용한 시추공 레이다 반사법 탐사에 있어서 반사층 방위각의 자동 결정)

  • Kim Jung-Ho;Cho Seong-Jun;Yi Myeong-Jong;Chung Seung-Hwan
    • Geophysics and Geophysical Exploration
    • /
    • v.1 no.3
    • /
    • pp.176-182
    • /
    • 1998
  • The borehole radar reflection survey can image the underground structure with high resolution, however, we cannot get any information on the orientation of the reflectors with dipole antenna alone. The direction-finding antenna system is commonly used to give the solution to the problem. However, the interpretation of the data from direction- finding antenna may be time-consuming, and sometimes have ambiguities in the sense of precise determination of the azimuth. To solve the problem, we developed the automatic azimuth finding scheme of reflectors in borehole radar reflection data using direction-finding antenna. The algorithm is based on finding the azimuthal angle possibly showing the maximum reflection amplitude in the least-squared error sense. The developed algorithm was applied to the field data acquired in quarry mine. It was possible to locate nearly all of the reflectors in three dimensional fashion, which coincide with the known geological structures and man-made discontinuities.

  • PDF

Prediction of Ground Subsidence Hazard Area Using GIS and Probability Model near Abandoned Underground Coal Mine (GIS 및 확률모델을 이용한 폐탄광 지역의 지반침하 위험 예측)

  • Choi, Jong-Kuk;Kim, Ki-Dong;Lee, Sa-Ro;Kim, Il-Soo;Won, Joong-Sun
    • Economic and Environmental Geology
    • /
    • v.40 no.3 s.184
    • /
    • pp.295-306
    • /
    • 2007
  • In this study, we predicted areas vulnerable to ground subsidence near abandoned underground coal mine at Sam-cheok City in Korea using a probability (frequency ratio) model with Geographic Information System (GIS). To extract the factors related to ground subsidence, a spatial database was constructed from a topographical map, geo-logical map, mining tunnel map, land characteristic map, and borehole data on the study area including subsidence sites surveyed in 2000. Eight major factors were extracted from the spatial analysis and the probability analysis of the surveyed ground subsidence sites. We have calculated the decision coefficient ($R^2$) to find out the relationship between eight factors and the occurrence of ground subsidence. The frequency ratio model was applied to deter-mine each factor's relative rating, then the ratings were overlaid for ground subsidence hazard mapping. The ground subsidence hazard map was then verified and compared with the surveyed ground subsidence sites. The results of verification showed high accuracy of 96.05% between the predicted hazard map and the actual ground subsidence sites. Therefore, the quantitative analysis of ground subsidence near abandoned underground coal mine would be possible with a frequency ratio model and a GIS.