• Title/Summary/Keyword: tunnelling

Search Result 1,979, Processing Time 0.023 seconds

Identification and importance analysis of hazards affecting the stability of TBM tunnelling works (TBM 터널 굴착 안정성에 영향을 미치는 위험요소 도출 및 중요도 결정)

  • Seong, Joo-Hyun;Youn, Jun-Ung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.973-984
    • /
    • 2017
  • There is a growing need to apply TBM tunnelling method for the construction of underground facilities such as subways and utility tunnels in urban areas. Due to the variability and uncertainty of the ground, tunnelling in urban areas has various safety hazards which could cause damage to people and properties and it is very costly to recover from accidents. Therefore, it is very important to identify hazards from the planning and design phase and to establish risk mitigation measures. In this study, a total of 31 hazards affecting the stability of TBM tunnelling works in urban areas were listed from both the technical literature and correspondence with experts in tunnelling area. The importance and priorities of the hazards were analyzed by conducting Delphi technique, which is a decision-making method by consensus among experts. Finally, 12 hazards that satisfy the content validity criteria were settled and could be used as major control factors for accident prevention during TBM tunnelling works.

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.

TBM tunnelling on Rock

  • Pelizza, Sebastiano;Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.6 no.2
    • /
    • pp.85-100
    • /
    • 2004
  • In this paper the historical and technological developments of rock TBM and the technical classification of the machines proposed by ITA (International Tunnelling Association) are initially presented. Then the general criteria for the TBMs selection are discussed and at the end the limiting geological conditions for the application of TBMs are analysed.

  • PDF

버력처리 기계

  • 조현
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.7 no.3
    • /
    • pp.9-23
    • /
    • 2005
  • PDF

터널의 화재

  • 오해진
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.99-102
    • /
    • 1999
  • PDF

중국법

  • Gang, Dae-Gyu
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.80-82
    • /
    • 2019

GIS-based Tunnelling-induced Building/Utility Damage Assessment System-Development and Application (GIS기반의 터널시공에 따른 주변건물/매설관 손상평가 시스템-개발 및 적용)

  • 유충식;전영우;김재훈;박영진;유정훈
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.233-240
    • /
    • 2003
  • A GIS-based tunnelling risk management system (GIS-TURIMS) has been developed in this study The developed system uses ArcView 8.2 as a basic platform and the built-in interface(VBA) has been used to perform first-order simplified analyses for prediction of tunnelling-induced ground movements and building damage assessment. The main emphasis in this study was to develop a working framework that can be used in the perspective of tunnelling risk management. The developed system is capable of carrying out computationally intensive first-order analyses for ground movement prediction as well as building/utilities damage assessment with fully taking advantage of the GIS technologies. This paper describes the concept and details of the GIS-TURIMS development and implementation.

  • PDF