• Title/Summary/Keyword: tunnel waterproofing method

Search Result 7, Processing Time 0.022 seconds

A study on the EVA reforming processes transparency sheet and nonwoven warm air point adhesion using of tunnel waterproofing method. (EVA개질 투명시트와 부직포를 열풍 점융착한 일체형 방수시트를 이용한 터널방수공법에 관한 연구)

  • Seon Yun-Suk;Kim Jaun-Sull;Kim Su-Ryon;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.185-190
    • /
    • 2005
  • Safe, economical and environment-friendly tunnel construction are required again along with social continuous development, the importance of waterproof work that is portion that actually all of user and builder can find that is embossed by tunnel construction's one of important construction. Also, ECB (Ethylen Copolymer Bitumen) sheet that is used in existing tunnel waterproofing method (ECB waterproofing method) being black because asphalt (Bitumen) is added, by purpose that make illumination of tunnel interior brightly and scar discovery eases in sheet with coating white film, but ECB that is used present according as ECB that asphalt is added does not satisfy high tensile strength of construction field, quality standard of extension. Also ECB denigrates color of black M/B that asphalt is excepted.

  • PDF

Practical 2-Arch Road Tunnel Design in Mountainous area (산악지형에서 효율적인 2-Arch 터널의 설계사례)

  • Jeong, Kyeong-Han;Lee, Joo-Gong;Han, Sung-Su;Hwang, Yong-Sub;Kim, Ji-Sung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.10a
    • /
    • pp.601-612
    • /
    • 2005
  • In mountainous area, Two parallel tunnels have been usually recognized as a road tunnel which has benefits in aspects of cost and stability. However, Design and construction of 2-Arch road tunnel are growing recently due to environmental destruction, compensation of land and difficulty of route separation. As studies are mainly undergoing on only guaranteeing stability and developing a waterproofing-drainage system to avoid water leakage through comprehension for characteristics of 2-arch tunnel behaviors, there is a tendency to evaluate quantity of support by empirical method with a tunnel which has a complicated cross-section and lack of construction ability. In this study, therefore, we made a plan of tunnel cross-section which had shown good construction ability and developed the waterproofing-drainage system which is able to solve the water leakage problem fundamentally by analyzing precedented 2-arch tunnels and investigating their sites in and out of nation. We also determined fixed quantity of support by a large-scale model test and numerical analysis. We want to contribute to 2-arch tunnel design hereafter introducing design procedure and method applied here.

  • PDF

The Continuously Underwater Tunnelling Methods by Incremental launching Methods (연속압출공법(ILM)을 이용한 수저(水底)터널공법에 관한 연구)

  • Jung, Byung-Ryul;Ryu, Dong-Hun;Kim, Joon-Mo
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.28-41
    • /
    • 2009
  • We know the several construction methods for underwater tunnel, but properly submerged concrete box type tunnel was mostly good structure stability and mostly shot length of tunnels. Submerged box type tunnel was buildup the unit segments in dry dock or ship yard by 10 to 20meters. The submerged box was composed with segments was join each together. It was installing the gate and waterproofing the coupling the front hull of a box. The complete submerged box rise up to the surface water, tow in the submerged box by tugboat, going to the destination of tunnel construction site. Beforehand dredge up soil at the bottom of a underwater, sinking the submerged box, connection together complete submerged box in underwater. The research and development ILM tunneling method is receiving careful study. Biggest weakness in submerged concrete box type tunnel was pressure waterproofing, box to box connecting, complete submerged boxes navigation and installation, after operation the submerged tunnel and management concrete box structure. It was positive evidence in submerged concrete box type tunnel. We make a practical application of the principle "the ILM tunneling method in underwater construction methods."

  • PDF

Structure movement-coping Waterproofing technology application for Railroad facilities (철도시설에 있어서의 구조물 거동대응형 방수기술의 적용)

  • Cho, Il-Kyu;Lee, Jong-Yong;Oh, Sang-Keun
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1964-1969
    • /
    • 2010
  • Recently, as construction market scale is getting bigger and transportation industry is developing, the underground structure construction such as subway, tunnel (excavation box) or shield tunnel structure is becoming more diverse, and its demand is gradually increasing. However, for the concrete structures constructed underground, the water leakage is occurred due to the expansion joint and construction joint, or movement, uneven settlement, excessive load and vibration during application causing cracks. Many waterproofing method and materials are used in jobsites, but areas such as underground railroad and subway that has movement and vibration at all times, the ability of waterproofing layer is declined causing repetitive water leakage due to crack, erosion and separation, which is a vicious cycle. Therefore, this study evaluates the responsiveness to a movement for adhesive/flexible waterproofing material that can cope with the vibration and the movement of the structure. Also to recommend a waterproofing technology that can cope with structure movement through examples of actual jobsite applications such as subway and tunnel where there are constant movement and vibration.

  • PDF

Evaluation of Radon Exposure During Highway Tunnel Construction by New Austrian Tunneling Method (NATM 공법에 의한 고속도로 터널 공사 중 라돈 노출 평가)

  • Ye-Ji Yu;Hyoung-Ryoul Kim;Mo-Yeol Kang;Sangjun Choi
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.2
    • /
    • pp.115-125
    • /
    • 2023
  • Objectives: This study was conducted to measure the level of radon in the air at a highway tunnel construction site in a gneiss area using the New Austrian Tunneling Method (NATM) and to evaluate exposure levels by occupation. Methods: Radon concentrations in the air were measured using E-PERM at points 300 m, 600 m, and 900 m from the tunnel entrance during the excavation and waterproofing work inside the tunnel. In addition, radon concentrations were measured during external excavation to compare with the inside of the tunnel. Personal exposure levels for major occupations including tunnel workers, construction equipment operators, waterproofers, shotcrete workers, and safety and health managers who participated in the construction were estimated using radon concentration measured in the work process area and working hours by occupation. Results: As a result of a total of 77 radon measurements, the geometric mean (GM) concentration was 71.1 Bq/m3, and the maximum concentration was 127.3 Bq/m3, which was below the indoor air quality criteria. Radon concentration by process decreased in the order of the tunnel excavation process (GM= Bq/m3, GSD=1.2), waterproofing process (GM=73.35 Bq/m3, GSD=1.2), and outside excavating process (GM=45.28 Bq/m3, GSD=1.2). Processes inside the tunnel were significantly higher than outside excavating processes (p<0.05). There was no statistically significant difference in radon concentration measured inside by distance from the tunnel entrance, but the innermost point of the tunnel, 900 m (GM=79.24 Bq/m3, GSD=1.27), measured the highest. Conclusions: The occupation with the highest individual exposure to radon was tunnel worker (64.16 Bq/m3), followed by construction equipment driver (64.04 Bq/m3) and waterproofer (63.13 Bq/m3).

Numerical study on structural reinforced effects of concrete lining by spray-applied waterproofing membrane (차수용 박층 멤브레인 설치에 따른 콘크리트 라이닝의 구조적 보강효과에 관한 수치해석 연구)

  • Lee, Chulho;Lee, Kicheol;Kim, Dongwook;Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.551-565
    • /
    • 2017
  • A spray-applied waterproofing membrane which consists of polymers has a relatively higher constructability and adhesion than the conventional sheet-type waterproofing materials. Additionally, the spray-applied waterproofing membrane generally shows a waterproofing ability as a composite structure with shotcrete or concrete lining. Because its purpose is waterproofing at the structure, structural effects were not well reported than waterproofing abilities. In this study, structural effects of the membrane-attached concrete lining were evaluated using 3-point bending test by the numerical method. From the analysis, a load-displacement behavior of the concrete lining and fracturing energy after yielding were compared with various conditions. Consequently, concrete lining with spray-applied waterproofing membrane shows higher flexural strength and fracturing energy than the single-layer concrete lining.

A fundamental study of slurry management for slurry shield TBM by sea water influence (해수의 영향에 따른 이수식 TBM의 슬러리 관리를 위한 기초적 연구)

  • Kim, Dae-Young;Lee, Jae-won;Jung, Jae-Hoon;Kang, Han-Byul;Jee, Sung-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.463-473
    • /
    • 2017
  • Bentonite swells when it comes into contact with water and makes it a viscous fluid. Thus it is widely used in civil engineering works for waterproofing. Utilizing the properties of bentonite, the slurry shield TBM supports excavated face with pressurized slurry as well as transporting excavated muck. When bentonite is in contact with seawater, due to the change of double layer thickness, its expandability and viscosity are lowered. This may cause problems for excavation stability and muck discharge due to the increase of sea water inflow when Slurry TBM is used under sea water conditions. In this study, the change of slurry condition caused by the inflow of sea water during tunnel excavation with Slurry TBM was investigated and a slurry management guideline was proposed. For this purpose, a laboratory test was carried out based on the slurry management criterions applied in the field, and a method applicable to the field where sea water is affected has been proposed.