• 제목/요약/키워드: tunnel failure

검색결과 442건 처리시간 0.025초

터널내 온도조건을 고려한 콘크리트 포장의 거동 및 성능 평가 (Behavior and Performance Evaluation of a Concrete Pavement Considering the Temperature Condition in a Tunnel)

  • 류성우;박준영;김형배;이재훈;조윤호
    • 한국도로학회논문집
    • /
    • 제18권2호
    • /
    • pp.11-18
    • /
    • 2016
  • PURPOSES: This paper investigates behavior and performance of concrete pavement in tunnel based on temperature data from field. METHODS : In this study, there are 4 contents to evaluate concrete pavement in tunnel, First, Comparison for distress was conducted at outside, transition, and inside part of tunnel. Secondly, temperature data was collected in air and inside concrete pavement in outside and inside tunnel. Thirdly, FEM analysis was performed to evaluate stress condition, based on temperature data from field. Finally, performance prediction was done with KPRP program. RESULTS: From the distress evaluation, failure of inside tunnel was much less than it of outside tunnel, Temperature change in tunnel was less than out side, and also it was more stable. According to result of FEM analysis, both curling stress status of inside tunnel was lower than it of outside tunnel. Based on KPRP program analysis, performance of inside tunnel was longer than outside. CONCLUSIONS : Through all study about behavior and performance of concrete pavement in tunnel, condition in tunnel has more advantages from environmental and distress point of view. Therefore, performance of inside tunnel was better than outside.

터널 입구부 대절토 사면 안정성 사례 연구 (Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal)

  • 박동순;배종섬
    • 지질공학
    • /
    • 제25권1호
    • /
    • pp.115-129
    • /
    • 2015
  • 대단면 터널 입구부의 대절토 사면은 불안정한 응력분포 및 소성변형 가능성으로 인해 잠재적 취약부로 인식되고 있다. 본 사례연구에는 대단면 터널 갱구부 대절토 사면의 강우 후 유실사고 및 원인규명, 복구공법을 분석하여 제시하였다. 대상 현장은 46 mm의 강우 후 암반의 불연속면을 따라 대규모 평면파괴가 발생하였으며, 상부 절토사면의 불안정을 야기하였다. 지질조사 및 매핑 자료 분석 결과, 붕괴 원인은 풍화된 암반의 불연속면에 협재된 충전물과 지반 포화로 인한 절리면 연화(softening)로 판단되었다. 알칼리 장석이 풍부한 화강편마암은 풍화에 취약한 것으로 나타났다. 침하량 계측자료 분석 결과, 붕괴 직전에 급격한 변위량 증가를 관찰하였으며, 향후 사면 계측관리에 활용할 수 있을 것으로 판단된다. 응급복구 대책으로 콘크리트 공동충전 및 외부로부터 압성토 채움을 성공적으로 시행하였다. 항구복구 대책으로 사면부에는 격자블럭 및 지중 앵커 시스템을, 터널 측벽부에는 추가 락볼트 보강 및 그라우팅 공법을 성공적으로 적용하였다. 한계평형해석과 평사투영해석을 통해 원 사면의 불안정성과 보강방법의 유효성을 확인하였다. 본 사례연구는 향후 유사한 대절토 사면에 귀중한 참고자료로 활용될 것으로 기대된다.

터널 갱구지역 사면안정성 및 산사태 위험도 평가 (Slope stability analysis and landslide hazard assessment in tunnel portal area)

  • 정해근;서용석
    • 한국터널지하공간학회 논문집
    • /
    • 제15권4호
    • /
    • pp.387-400
    • /
    • 2013
  • 본 연구에서는 터널 갱구사면을 대상으로 사면안정성 및 산사태 위험도를 평가하였다. 먼저 사면안정성 해석을 통해 붕괴위험도가 가장 높은 구간을 선정하고 구체적인 붕괴규모를 파악하였다. 해석결과 해발고도 485~495 m인 구간은 강우시 안전율이 0.99로 불안정한 상태로 나타났다. 이 때 붕괴심도는 최대 2.1 m이며 붕괴 길이는 사면의 경사방향으로 18.6 m로 분석되었다. 해당구간에서 사면붕괴 시 파생되는 사태물질의 이동특성을 실시간으로 분석하고 터널 갱구부에 미치는 영향을 파악하고자 산사태 시뮬레이션 해석을 수행하였다. 해석결과 사태물질은 7.74 m/sec의 평균속도를 보이며 주로 계곡부를 따라 산 하부로 이동하는 것으로 분석되었다. 사태물질은 산 하부로 갈수록 점차 확산되며 10초 후에 터널 갱구부 위를 지나고 20.2초 후에 산하부에 도달하는 것으로 분석되었다. 특히 터널 갱구부는 사태물질 이동경로의 중심부에 위치하고 있어 산사태 발생 시 직접적인 피해를 받는 것으로 나타났다.

확률론적 기법을 이용한 터널 지보시스템의 신뢰성 평가 (Reliability Assessment of Tunnel Support Systems Using a Probability-Based Method)

  • 박도현;박의섭;송원경;류동우
    • 터널과지하공간
    • /
    • 제20권1호
    • /
    • pp.39-48
    • /
    • 2010
  • 본 연구에서는 확률론적 기법을 토대로 터널 지보시스템의 신뢰성을 평가할 수 있는 프로그램을 개발하였다. 개발된 프로그램은 솔버로서 FLAC2D를 사용하며 수치해석과 확률론적 해석의 전 과정을 자동적으로 처리할 수 있다. 지반을 모델링한 수치해석시 상당한 계산시간이 소요되므로 시뮬레이션 기법을 적용하여 터널 지보시스템의 신뢰성을 확률론적으로 평가하는 것은 현실적으로 불가능하다. 따라서 본 연구에서는 샘플의 수를 시뮬레이션 기법에 비해 상당히 줄일 수 있어 확률론적 해석을 하는 데 효율적인 점추정법을 사용하였다. 본 연구에서 개발한 프로그램을 터널 프로젝트에 적용하여 결정론적 접근법에 의한 결과와 비교 분석하였다. 이로부터 확률론적 접근법은 파괴확률을 토대로 터널 지보시스템의 신뢰성을 정량적으로 평가할 수 있고 터널 지보설계시 의사결정의 도구로서 활용될 수 있다는 것을 확인하였다.

터널형상의 Trapdoor 모형실험을 통한 지반 거동에 관한 연구 (Ground Behavior around Tunnel Using Tunnel-shaped Trapdoor Model Test)

  • 한영철;김상환;정상섬
    • 한국지반공학회논문집
    • /
    • 제30권4호
    • /
    • pp.65-80
    • /
    • 2014
  • 본 연구에서는 실제 터널 단면의 형상을 갖는 Trapdoor시험과 수치 해석을 수행하여 주변지반의 거동, 이완하중의 분포 및 점진적인 파괴 현상에 대하여 분석하였다. 지반하중은 Trapdoor의 하강에 따라 급격히 감소 후에 다시 크게 증가하여 일정한 이완하중에 도달하여 아칭효과를 확인 할 수 있었으며, 느슨 모래의 경우가 조밀 모래 보다 상대적으로 큰 값을 나타내었다. 전단대의 형성은 터널 어깨부에서 발생하여 터널 측벽에서 $63^{\circ}$(느슨) 및 $69^{\circ}$(조밀) 방향으로 시작하여 완만한 곡선을 이루며 지표를 향하여 진행하는 형상을 나타내었다. 터널 상부에서의 전단대의 폭원은 1.83b~1.92b(b는 터널폭)로서 기존 제안식으로 구한 값과 유사한 범위를 보였으나, 전단대의 높이는 대심도의 경우 터널고의 1.5~2.0배 정도로서 기존의 제안 값(약 3.0배) 보다 상대적으로 낮은 것으로 나타났다.

이개부 병변을 가진 하악 대구치의 치료에 있어 치근절제술과 터널화의 임상결과 비교 (Comparison of root resection and tunnel preparation in the clinical outcome of furcation-involved mandibular molars)

  • 김철우;박진우;서조영;이재목
    • Journal of Periodontal and Implant Science
    • /
    • 제39권1호
    • /
    • pp.53-58
    • /
    • 2009
  • Purpose: The resective treatment in mandibular Degree III furcation areas includes root resection and tunnel preparation. The purpose of this retrospective study is to evaluate which treatment procedure(root resection vs tunnel preparation) has more favorable prognosis in mandibular Degree III furcation involvement. Materials and methods: The subjects of this study were patients who were treated their mandibular posteriors with either root resection(22 teeth on 22 patients) or tunnel preparation(24 teeth on 22 patients) and have participated in periodic recall check program for at least 2 years. Failure rate, plaque index, bleeding on probing and probing pocket depth were measured and the results were compared and statistically analysed. Results: Failure rates of root resection and tunnel praparation were 13.6% and 16.7%, respectively, and showed no significant difference between two procedures. No significant differences were observed between two procedures with respect to plaque index, bleeding on probing and probing pocket depth. Conclusion: root resection and tunnel preparation are both effective procedures to treat mandibular posterior furcation involvement, if adequate treatment of choice is made and patient's cooperation is accompanied. However, tunnel preparation is more preservative procedure in mandibular posterior furcation involvement since root canal treatment and prosthetic restoration are needed additionally, in case of root resection.

대심도 풍화대층에서 NATM 터널의 지반거동 및 보강방법 (Ground Behavior and Reinforcing Methods of NATM Tunnel through Deep Weathered Zone)

  • 천병식;송승훈;안정환
    • 한국지반공학회논문집
    • /
    • 제23권8호
    • /
    • pp.87-95
    • /
    • 2007
  • 본 연구에서는 대심도 풍화대에 시공되는 2차로 도로터널을 기준으로 터널의 굴착방법과 지반보강그라우팅에 의한 지반변위 및 지반응력의 분석을 통하여 최적의 시공방안을 찾고자 하였다. 터널 직경은 약 12m를 적용하였으며, 상부 강관다단그라우팅 및 측벽 보강그라우팅을 적용하였다. 검토된 굴착방법은 링컷 굴착방법과 중벽분할 굴착방법이다. 터널 천단의 소성율과 연직응력비를 분석한 결과, 풍화대지반에 굴착되는 터널에서 토피고(H)가 터널직경(D)의 4배 이상일 경우(H>4D) 대심도 터널로 판단할 수 있었다. 해석결과 중벽분할 굴착방법이 링컷 굴착방법에 비하여 대심도 풍화대 NATM터널에서 안정성이 높은 굴착방법으로 판단할 수 있었다. 또한, 측벽 보강그라우팅 실시로 터널 내공변위 및 침하 발생을 억제할 수 있었다.

터널 건전도 평가를 위한 라이닝 모델실험 (Model Test of Lining for Estimation of Tunnel Soundness)

  • 김영근
    • 자연, 터널 그리고 지하공간
    • /
    • 제1권2호
    • /
    • pp.59-71
    • /
    • 1999
  • Recently, many deformations in tunnel such as crack and leakage were occulted. Specially, the defects of tunnel lining have been a serious problem in safety and stability many repair works for maintenance in tunnel have been carried out. Therefore, it is necessary to estimate the structural cracking for countermeasure in deformed tunnel and to investigate on the characteristics of lining system and the soundness of tunnel. In this study model tests for tunnel lining were carried out using test apparatus and centrifuge, In the direct loading test, the prototype was Kyungbu high-speed railway tunnel and the scale is 1/10, and lining models were made of concrete. Test conditions included load conditions such as direction, shape and type, lining conditions such as single and double lining, thickness, and reinforcement. In centrifuge model test, the prototype was Seoul subway tunnel and the scale is 1/100, and lining models were made of aluminum and hydrostone. Test conditions included tunnel defects such as thickness shortage. behind cavity and longitudinal cracks, reinforcement methods such as epoxy, grouting and carbon sheet. From these model tests , the characteristics of deformation and failure for tunnel lining were estimated, and the structural behaviors of deformed lining and the effects of repair and reinforcement for tunnel lining were researched.

  • PDF

주관상동맥-폐동맥 이상연결증의 외과적 수술요법 (Surgical Treatment of Anomalous Connection of Left Coronary Artery to the Pulmonary Artery [ALCAPA])

  • 이정렬
    • Journal of Chest Surgery
    • /
    • 제26권3호
    • /
    • pp.228-233
    • /
    • 1993
  • Patients with anomalous connection of the left coronary artery to the pulmonary artery are at risk for myocardial infarction, and early or sudden death. Between 1986 to 1992, a total of 4 of these patients underwent surgical intervention with various operative techniques at our institution. Age at operation ranged from 2 months to 43 years. Three infant patients had congestive heart failure, 2 of them had mitral regurgitaion, and 1 had ST-T change on elctrocardiogram. Operative techniques included direct coronary artery transfer to the aorta[n=2], intrapulmonary tunnel from the aortopulmonary window[n=1], coronary artery bypass using saphenous vein[n=1]. One deaths occured at 2 weeks after direct coronary arterial transfer due to respiratory failure caused by Respiratory Syncitial virus pneumonia. Supravalvar pulmoanry stenosis occured after intrapulmoanry tunnel. We recommend direct aortic implatation of the anomalous coronary artery at the time of diagnosis. Intrapulmonary tunnel from aortopulmonary window or subclavian-coronary anastomosis could be alternatives in whom aortic implantation is not feasible anatomically.

  • PDF

Wind tunnel studies of cantilever traffic signal structures

  • Cruzado, Hector J.;Letchford, Chris;Kopp, Gregory A.
    • Wind and Structures
    • /
    • 제16권3호
    • /
    • pp.225-240
    • /
    • 2013
  • The wind-induced vibrations of the mast arm of cantilever traffic signal structures can lead to the fatigue failure of these structures. Wind tunnel tests were conducted on an aeroelastic model of this type of structure. Results of these experiments indicated that when the signals have backplates, vortex shedding causes large-amplitude vibrations that could lead to fatigue failure. Vibrations caused by galloping were only observed for one particular angle of attack with the signals having backplates. No evidence for galloping, previously thought to be the dominant cause of fatigue failures in these structures, was observed.