• 제목/요약/키워드: tunnel enlargement

검색결과 28건 처리시간 0.025초

Fundamental study on enlargement method of existing subway tunnel during operation for sidetrack construction (부본선 건설을 위한 기존 지하철 터널의 운영 중 확폭 방안에 대한 기초연구)

  • Lee, Hyobum;Koh, Sung-Yil;Jun, Jonghun;Yoon, Hee Taek;Yi, Na Hyun;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제22권1호
    • /
    • pp.59-76
    • /
    • 2020
  • As a continuous increase in demand for the transportation infrastructure in the metropolitan area, the renovation of existing metropolitan and urban railway lines for the rapid transport system requires the construction of sidetrack that can operate local and express trains simultaneously. However, the construction of sidetrack after stopping the operation of the existing subway line causes a lot of economic losses, therefore it is essential to study the tunnel enlargement scheme during the operation of the existing subway tunnel. Accordingly, in this paper, basic research on the enlargement plan of the existing subway tunnel was carried out for the renovation of the existing subway line. In order to investigate the method for the sidetrack construction, the Government Complex Gwacheon station on the Gwacheon line of subway line 4 was selected as a virtual research station. Subsequently, four construction plans including tunnel cross-sectional plan for each section were reviewed and constructability and economic feasibility were compared. Finally, the stability assessment was conducted for the selected construction plan which was considered to be relatively unstable by 3-D full numerical analysis considering the sidetrack construction process.

Behavior and pillar stability of enlarged existing parallel tunnels (기존 병설터널의 확폭에 따른 터널 거동 및 필라 안정성 분석)

  • Lee, Myeong-Han;Kim, Bumjoo;Jang, Yeon-Soo;Yun, Ji-Nam;Park, Hyun-Gon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제15권5호
    • /
    • pp.537-546
    • /
    • 2013
  • Traffic congestion in existing tunnels has increased due to increased traffic volume and enlarged vehicles. Enlarging existing tunnels has advantages over constructing new tunnels by reducing land purchasing costs as well as minimizing natural environment destruction. In fact, many overseas projects for enlarging existing tunnels have been reported. Thus, it appears that the demand on enlarging existing tunnels continues to rise in Korea in near future. Nonetheless, the studies related to the enlarged tunnels have been relatively rare since there have been few tunnel enlargement projects in Korea. In the present study, the tunnel behavior and the stability of rock pillar when enlarging existing parallel tunnels were investigated by performing FE analysis and using existing theory and empirical relationships. Four different enlarging cases, depending on the enlargement types and directions, were examined in the study. According to the results, for the tunnels with the same pillar width after enlarged, the uni-laterally enlarged tunnel indicated 5 to 20% higher crown settlement compared to the bi-laterally enlarged tunnel, and for the tunnel with the narrowest pillar, the highest shotcrete stress was observed. Also, the strength/stress ratio for rock pillar was more than 1.0 for all four enlargement cases, and the Matsuda's method was found to give higher strength/stress ratio by about 50% compared to the Peck's method.

Reinforcement of shield tunnel diverged section with longitudinal member stiffness effect (종방향 부재의 강성효과를 고려한 쉴드 터널 분기부 보강 및 해석기법)

  • Lee, Gyu-Phil;Kim, Do
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제21권5호
    • /
    • pp.675-687
    • /
    • 2019
  • In recent years, the needs for double deck-tunnels have increased in large cities due to the increase in traffic volume and high land compensation costs. In Korea, a network type tunnel which is smaller than general road tunnels and crosses another tunnel underground is planned. In the shield tunnel joints between the existing shield tunnel and the box-type enlargement section, a partial steel-concrete joint is proposed where the bending moment is large instead of the existing full-section steel joint. In order to analysis the enlargement section of the shield tunnel diverged section to reflect the three-dimensional effect, the two-dimensional analysis model is considered to consider the column effect and the stiffness effect of the longitudinal member. A two-dimensional analysis method is proposed to reflect the stiffness of the longitudinal member and the column effect of the longitudinal point by considering the rigidity of the longitudinal member as the elastic spring point of the connecting part in the lateral model. As a result of the analysis of the model using the longitudinal member, it was considered that the structural safety of the partial steel-concrete joint can be secured by reducing the bending moment of the joint and the box member by introducing the longitudinal member having the stiffness equal to or greater than a certain value.

Analysis on the behavior of a old tunnel supporting system by enlargement (노후터널 확대시 기존터널 지보재 응력 변화에 대한 분석)

  • Baek, Ki-Hyun;Kim, Woong-Ku;Seo, Kyoung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2010년도 춘계 학술발표회
    • /
    • pp.1382-1387
    • /
    • 2010
  • A 3D FEM numerical analysis was performed to observe the changes of supporting system of a old 1-lane tunnel when it is enlarged to 2-lane, 3-lane and 4-lane. The standard Type-III supporting pattern was applied to the new tunnel because the ground was assumed as Type-III. The observation was carried out at the middle supporting system of the old 1-lane tunnel alignment. The results shows that the changes of old tunnel supporting system began when the new tunnel was excavated at 2D(D is the equivalent diameter of 1-lane tunnel) behind of the observation place and became very rapid from 1D.

  • PDF

Statistical Analysis about Characteristics of Tunnel Portal Slopes on the National Highway in Korea (국내 일반국도 터널 갱구사면 특성 통계 분석)

  • Kwon, O-Il;Baek, Yong;Koo, Ho-Bon;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.745-750
    • /
    • 2005
  • The demand of tunnels has been increased for the linear improvement of general national highway, and road construction and/or enlargement in Korea. Also, the collapses of tunnel portal slope have been increased in recent due to heavy rain caused by global warming. Therefore, it has been risen the requirement of system for the stability of tunnel portal slope in Korea as well as all over the world. The objective of this research is to develop an effective maintenance system for supervising the tunnel portal slope. This paper is a basic proposal to execute a survey on the current status and state of the tunnel portal slopes that were already installed along general national highways.

  • PDF

Evaluation of the rock property around TBM tunnels using seismic reflective survey data and TBM driving data

  • Aoki Kenji;Mito Yoshitada;Yamamoto Takuji;Shirasage Suguru
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 한국지구물리탐사학회 2003년도 Proceedings of the international symposium on the fusion technology
    • /
    • pp.288-295
    • /
    • 2003
  • The relationship between the reflection number obtained from seismic reflective survey and the rock strength value obtained from TBM excavation is examined, and the procedure of the conversion from the reflection number to the rock strength value is proposed. Subsequently, geostatistical method is employed to evaluate the rock properties ahead of the tunnel face and around the tunnel with good precision, using both the seismic reflective survey data and the TBM driving data for the purpose of the tunnel driving and enlargement. The applicability of this evaluation method is examined at the actual tunnel site.

  • PDF

A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • 제27권4호
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

The Temperature Distribution and the Smoke Flow Behaviour During Road Tunnel Fire (도로터널내 화재시 온도분포 및 연기 유동 분석 연구)

  • Choi, Tae-Hee;Yeun, Young-Pyo;Yun, Chul-Uk;Kim, Myung-Bae;Choi, Jun-Seok;Lee, Seung-Ho;Kim, Nag-Young
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제4권1호
    • /
    • pp.37-43
    • /
    • 2002
  • Recently, the construction of tunnels longer than one kilometer has increased rapidly. Considering characteristic of limiting structure of longer tunnel, if fires inside tunnel broke out because of vehicle incidents, the catastroph would have high possibility to take place due to toxic smoke and heat of fire. In case of highway tunnel, safety facilities which can cope with tunnel fire are installed in the tunnel but according to rapid increase of heavy good traffic, dangerous goods and enlargement of tunnel magnitude, the research has to carry out about heat fluxes and smoke behaviour during tunnel fire. Therefore, through full-sized fire experiment the paper analyzed temperature distribution, wind velocity, smoke behaviour during tunnel fire.

  • PDF

A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method (Pre-cutting 공법을 적용한 터널 확폭 시 기존 및 확폭터널의 거동에 관한 수치해석적 연구)

  • Kim, Han-Eol;Nam, Kyoung-Min;Ha, Sang-Gui;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제22권4호
    • /
    • pp.451-468
    • /
    • 2020
  • Aging tunnels with small cross-sections can cause chronic traffic jams. This problem can be solved by widening the tunnel. In general, when the tunnel is expanded, the outer portion of the existing tunnel is excavated through a mechanical or blasting method. Such excavation affects not only the surrounding ground but also the existing tunnel. The application of the pre-cutting method can be a solution to these problems effectively. Therefore, if the widening of tunnel is performed by applying pre-cutting method, analysis of the impact of this method must be performed. In this study, in order to analyze the effect of applying pre-cutting in tunnel widening, numerical analysis is performed at six ground grades, from grade I to weathered rock. The analysis is performed with the expanding lane and the excavation length of pre-cutting as variables. In addition, the analysis is focused on the displacement of crown of the existing tunnel and the enlarged tunnel. As a result, the crown displacement of the enlarged tunnel is confirmed to converge at the same value regardless of the excavation length of the pre-cutting when the tunnel widening is completed. In the case of existing tunnels, uplift of crown occurs within 5 m of the front of the tunnel surface, and the shorter the excavation length of pre-cutting is found to be effective in preventing the occurrence of uplift.