• 제목/요약/키워드: tunnel crown settlement

검색결과 70건 처리시간 0.019초

터널 정보화 시공을 위한 계측 최적방안 분석 (Analysis of optimized survey methods for tunnel construction using IT)

  • 최원일;조국환;박성욱
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.941-946
    • /
    • 2008
  • D&B method in tunnel construction requires accurate and rapid measurement of the ground movement, which of essential for feedback analysis. Recently, survey technique adapting IT is getting more and more emphasized in the field of construction and tunnel survey also follow the same trend. Case study and adaptability of IT technique for tunnel survey will be discussed in this study. The application of laserscannig method in the field of tunnel construction was reported in several advanced country including Austria and Japan. Survey for the crown and shoulder movements by IT survey method was conducted and the results were compared to those do the conventional method. The pipe-roof, grouting, ring-cut are installed in the this site to prevent expected large ground settlement. The result show that laserscanner system is prefered rather than conventional method in that better understanding for the displacement condition and origin condition was liable by the lasersacnnig method. IT survey solution makes if possible to execute more economic and safe construction.

  • PDF

Pre-cutting 공법을 적용한 터널 확폭 시 기존 및 확폭터널의 거동에 관한 수치해석적 연구 (A numerical study on the behavior of existing and enlarged tunnels when widened by applying the pre-cutting method)

  • 김한얼;남경민;하상귀;유한규
    • 한국터널지하공간학회 논문집
    • /
    • 제22권4호
    • /
    • pp.451-468
    • /
    • 2020
  • 단면이 작게 만들어진 노후화된 터널은 만성적인 교통정체를 유발한다. 이는 터널의 확폭을 통하여 해결할 수 있다. 일반적으로 터널을 확폭할 경우, 기계식 또는 발파식 굴착방법을 통하여 기존터널의 외곽부를 굴착하게 된다. 이러한 굴착은 주변 지반뿐만 아니라 기존터널에도 영향을 미치게 된다. Pre-cutting 공법의 적용은 이러한 문제를 효과적으로 해결할 수 있는 방법이 될 수 있다. 따라서 Pre-cutting을 적용하여 확폭을 수행할 경우, 이에 따른 영향분석은 필수적으로 수행되어야 한다. 본 연구에서는 터널 확폭에서 Pre-cutting을 적용할 경우, 이에 따른 영향을 분석하기 위하여 6가지의 지반등급에서 수치해석을 수행하였다. 해석에서는 확대차로와 Pre-cutting의 굴착길이를 변수로 하여 수행하였으며, 기존터널과 확폭터널의 천단침하에 주목하여 분석하였다. 그 결과, 확폭터널의 천단침하는 확폭이 완료가 되면, Pre-cutting의 굴착 길이와 상관 없이 동일한 값으로 수렴하는 것을 확인하였다. 기존터널의 경우, 굴진면의 전방 5 m 내에서 융기가 발생하였으며, Pre-cutting의 굴착 길이가 짧을수록 융기 발생 예방에 효과적인 것으로 나타났다.

굴착공법이 터널변위 거동에 미치는 영향 - 수치해석 연구 (Effects of Excavation Methods on Tunnel Deformation Behavior - A Numerical Investigation)

  • 유충식;김주미;김선빈
    • 한국터널지하공간학회 논문집
    • /
    • 제8권4호
    • /
    • pp.289-305
    • /
    • 2006
  • 본 논문에서는 굴착공법이 터널변위 거동에 미치는 영향에 대한 내용을 다루었다. 먼저 비교적 동일한 시공조건을 대상으로 중벽분할 굴착공법과 링컷공법을 비교하여 각 굴착공법에 따른 터널거동 메카니즘을 고찰하는데 초점을 두었다. 이를 위해3차원 유한요소해석을 수행하였으며, 각 공법별 해석결과로부터 막장 안정, 천단침하, 지표침하, 숏크리트 라이닝의 응력을 비교하였다. 전반적으로 중벽분할 공법을 적용할 경우 굴진과정에서 터널변위 제어에 탁월한 효과가 있는 것으로 나타났으며, 링컷공법 적용 시 지표침하 억제 효과에 보다 효율적인 것으로 나타났다. 본 연구결과를 종합하여 설계 시 고려하여야 할 주안점을 제시하였다.

터널 3차원 절대변위 해석기법을 이용한 막장전방지반 예측 (Prediction of Ground Condition Changes Ahead of Tunnel Face Using Three-Dimensional Absolute Displacement Analysis)

  • 방준호;한일영
    • 한국터널지하공간학회 논문집
    • /
    • 제8권2호
    • /
    • pp.101-113
    • /
    • 2006
  • 안정된 암반에 터널을 굴착하는 경우 아칭효과에 의해 막장주변에 응력재배치가 발생하고 터널 막장 전방에 연약대가 존재하는 경우 응력재배치가 충분히 이루어지지 않아 막장과 연약대 사이의 응력집중으로 인해 변위가 발생하게 된다. 만일 막장에 근접하여 측점에서 종방향, 횡방향, 연직방향의 3차원 절대좌표가 측정되는 경우 막장전방의 지반거동이 반영된 3차원 절대변위가 산정되고, 이러한 3차원 절대변위의 분석을 통해 막장전방의 지반조건을 예측할 수 있게 된다. 본 연구에서는 4개 현장에서 측정된 3차원 변위비의 경향선과 천단침하의 영향선/경향선 분석을 실시하여 연약대 위치를 추정하였고, 3차원 절대변위의 분석에 의해 추정된 연약대 위치를 동일한 구간에서의 TSP탐사로 추정된 연약대 위치와 비교함으로써 3차원 절대변위 해석기법의 현장 적용성을 검증하였다.

  • PDF

터널굴착으로 발생한 주변 단일지층 및 복합지층 지반에서의 지반변위에 대한 거동비교 (Comparison of Ground Movements in A Single Ground Layer and Multiple Ground Layers due to Nearby Tunnel Excavation)

  • 손무락;윤종철
    • 대한토목학회논문집
    • /
    • 제30권3C호
    • /
    • pp.167-174
    • /
    • 2010
  • 본 논문에서는 터널굴착으로 발생한 주변 단일지층 및 복합지층 지반에서의 지반변위에 대한 거동을 상호 비교하기 위하여 수치해석을 수행하였다. 수치해석은 단일지층 및 복합지층 조건에서 서로 다른 시공조건(지반손실량)을 가진 터널에 대해 수행되었으며, 수치해석 결과로부터 얻어진 지표면에서의 최대 침하량과 최대 수평변위량은 지층조건 및 시공조건별로 상호비교되었다. 뿐만 아니라, 수치해석을 통해 얻어진 지표면에서의 최대 침하량은 터널 굴착부 천단에서 발생된 최대 침하량과 지층조건 및 시공조건(지반손실량)별로 상호 비교되었으며, 지표면에서의 최대 침하량과 최대 수평변위량의 관계 또한 지층조건에 따라 상호 비교되었다. 더불어, 지층조건에 따라 터널굴착부에서 발생한 지반손실량($V_L$)과 지표면에서 형성된 총 침하부피량($V_s$)이 서로 비교되었다. 수치해석을 통해 얻어진 결과와 기존 현장계측자료와의 비교가 수행되었으며, 이를 통해 본 연구의 결과가 향후 터널굴착으로 발생된 서로 다른 지층조건을 가진 주변지반에서의 거동을 파악하고 분석하는 실무자료로서 활용될 수 있다는 것을 파악하였다.

경암지반 NATM 터널에서 암반분류 및 계측에 의한 최적지보공 선정에 관한 연구 (Selection of Optimum Support based on Rock Mass Classification and Monitoring Results at NATM Tunnel in Hard Rock)

  • 김영근;장정범;정한중
    • 터널과지하공간
    • /
    • 제6권3호
    • /
    • pp.197-208
    • /
    • 1996
  • Due to the constraints in pre site-investigation for tunnel, it is essential to redesign the support structures suitable for rock mass conditions such as rock strength, ground water and discontinuity conditions for safe tunnel construction. For the selection of optimum support, it is very important to carry out the rock mass classification and in-situ measurement in tunnelling. In this paper, in a mountain tunnel designed by NATM in hard rock, the selectable system for optimum support has been studied. The tunnel is situated at Chun-an in Kyungbu highspeed railway line with 2 lanes over a length of 4, 020 m and a diameter of 15 m. The tunnel was constructed by drill & blasting method and long bench cut method, designed five types of standard support patterns according to rock mass conditions. In this tunnel, face mapping based on image processing of tunnel face and rock mass classification by RMR carried out for the quantitative evaluation of the characteristics of rock mass and compared with rock mass classes in design. Also, in-situ measurement of convergence and crown settlement conducted about 30 m interval, assessed the stability of tunnel from the analysis of monitoring data. Through the results of rock mass classification and in-situ measurement in several sections, the design of supports were modified for the safe and economic tunnelling.

  • PDF

터널 3차원 내공변위의 해석을 통한 막장전방 지반상태변화 예측 (Prediction of Change in Ground Condition Ahead of Tunnel Face Using Three-dimensional Convergence Analysis)

  • 김기선;김영섭;유광호;박연준;이대혁
    • 터널과지하공간
    • /
    • 제13권6호
    • /
    • pp.476-485
    • /
    • 2003
  • 본 연구의 목적은 막장전방에 파쇄대가 존재할 때 터널 3차원 내공변위를 여러 가지 방법으로 해석하여 변위의 변화 경향을 밝히고 지질변화를 예측하는 계측해석기법을 제시하는 것이다. 안정된 지하 암반에 터널을 굴착하게 되면, 터널 막장면을 포함한 무지보 굴착면 주위에 3차원적인 하중전이 현상이 나타나는데 막장 전방의 지반 상태가 변화하거나 연약 파쇠대층이 존재하면 특정한 변위 경향을 보이는 것으로 기존 연구결과 알려져 있다. 터널 천단부 축방향 변위/수직변위 비 등으로부터 터널 막장 전방에서 지반의 강성이 변화하는 불연속면의 존재를 예측할 수 있다. 그러므로, 시공중인 터널 내에서 3차원 절대 내공 변위를 측정하여 본 연구에서 제시된 계측해석 기법을 적용하면 터널 막장 전방의 지층변화나 파쇄대층의 존재를 사전에 예측할 수 있을 것으로 판단된다.

굴착공법이 터널변위 거동에 미치는 영향-유한요소해석 (Effects of Excavation Methods on Tunnel Deformation Behavior using Finite Element Analysis)

  • 유충식;김주미;김선빈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2006년도 춘계 학술발표회 논문집
    • /
    • pp.199-207
    • /
    • 2006
  • Before getting to the actual study of the load distribution factor in various excavating methods, this research is preliminarily focused on the comparison of two different excavation methods, CD cut method and Ringcut method. Especially, the purpose of this research is to study the behavioral mechanism of two tunnels which share the same construction environment but different excavating method. Two numerical analysis models with the same tunnel section and material properties are compared in this study, and they are analyzed by 3D Finite Element Analysis. In each model, face stability, crown displacement, ground settlement, and shotcrete-lining stress are computed. Thus, the general behavior of CD cut method and Ringcut method are studied, and it certified what should be considered for the calculation of the load distribution factor.

  • PDF

연약대를 통과하는 터널의 시공중 변위거동 - 수치해석 연구 (Deformation behavior of tunnels crossing weak zone during excavation - numerical investigation)

  • 유충식;박정규
    • 한국터널지하공간학회 논문집
    • /
    • 제16권4호
    • /
    • pp.373-386
    • /
    • 2014
  • 본 연구에서는 연약대를 관통하는 터널의 변위거동에 관한 연구내용을 다루었다. 이를 위해 발파굴착 공법이 적용되는 터널을 대상으로 다양한 파쇄대 조건을 도출하고 이에 대한 3차원 해석을 수행하여 파쇄대의 주향 및 경사와 터널 변위 거동과의 관계에 대한 매개변수 연구를 실시하였다. 해석결과를 토대로 파쇄대의 공간적 분포 특성에 따른 터널의 파쇄대 관통 전후의 변위 거동을 고찰하였으며 이를 토대로 현재 실무에서 적용되고 있는 3차원 계측결과의 활용방안을 모색하였다. 3차원 해석 결과를 분석한 결과 터널 천단 및 내공변위의 각 성분비는 터널 주변 파쇄대의 터널과의 상대적 위치 및 방향성에 따라 달라지는 것으로 관찰되어 천단 및 내공변위 등 전통적인 터널 안정성 지표와 아울러 터널의 안정성 검토는 물론 주변 파쇄대 존재여부를 판정하는 지표로 활용할 수 있는 것으로 검토되었다.

파쇄대 예측을 위한 터널의 3차원 수치해석 (3-Dimensional Tunnel Analyses for the Prediction of Fault Zones)

  • 이인모;김돈희;이석원;박영진;안형준
    • 한국지반공학회논문집
    • /
    • 제15권4호
    • /
    • pp.99-112
    • /
    • 1999
  • 막장 전방에 파쇄대 등의 불연속면이 존재할 경우, 이를 미리 예측하지 못한채로 굴진을 하게 되면 파쇄대로 인해 터널 굴진에 따라 발생된 종방향 아칭에 영향을 주어 막장면 전방에 응력이 집중하게 된다. 터널 및 지하공간의 설계시에는 불확실한 설계요소를 과다하게 내포하고 있으므로 경제적이고 안정성이 확보된 터널 시공을 위해서는 터널 막장면에서의 정확한 계측으로 막장 전방의 파쇄대를 예측하여 터널 지보체계에 신속히 대비함이 필요하다. 최근의 연구결과에 의하면 3차원 절대변위계측에 의해 터널의 시공 시 굴진에 따라 지반의 강도차이로 인해 발생된 종방향 변위의 변화를 측정하여 막장 전방의 불연속면을 미리 예측할 수 있다고 하였다. 본 연구는 혼합법을 사용한 3차원 수치해석으로부터 얻어지는 변위로부터 L/C (천단부의 종방향 변위[L]와 천단부의 침하량[C]의 비 )와 S/C (측벽의 수평방향 변위[S]와 천단부의 침하량[C]의 비), (Ll-Lr)/C (좌측벽의 종방향변위[Ll]와 우측벽의 종방향변위[Lr]의 차와 천단부의 침하량[C]의 비), 평사투영법을 중심으로 지반에 파쇄대가 존재할 경우에 대해 여러 가지 초기 지중응력조건에서 터널 굴착에 따른 3차원 절대 변위를 분석하여 그 존재를 예측할 수 있는 기법을 제시하였다.

  • PDF