A Case Study on the Construction of Large Cross Section Tunnel for Underground Ventilation System (지하환기소 대단면 터널 시공 사례 연구)

  • Noh, Seung Hwan;Choi, Sung Wook;Noh, Sang Lim
    • Tunnel and Underground Space
    • /
    • v.27 no.4
    • /
    • pp.195-204
    • /
    • 2017
  • This case study introduces the construction of large cross section tunnel for underground ventilation system in Sillim-Bongcheon Tunnel Project. In order to grant the safety and efficiency in connecting the ventilation shaft (7.8 m of width, and 6.6 m of height) to a tunnel for axial fan facility (20.8 m of width, and 12.3 m of height), gradual enlargement of tunnel cross section was employed between those and temporary support method was determined based on Q system. In addition, some original designs were revised during construction stage to improve the efficiency of excavation in large cross section tunnel. The advance length was optimized and top heading of the tunnel was excavated without partition in accordance with ground condition and numerical stability analysis results. It is believed that some experiences and considerations in this case study will be useful for the future design and construction in similar large cross section tunnel such as large underground ventilation system or road tunnel with four lanes.

A Study on the Principal Factors of Rail Tunnel Cross-Section Design due to High Speed (고속화에 따른 철도터널의 단면규모 결정요소에 대한 고찰)

  • Ryu, Dong-Hun;Lee, Hyeon-Jeong;Han, Sang-Yeon;Shin, Hyon-Il;Jung, Byung-Ryul;Song, Chung-Ryul
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1487-1501
    • /
    • 2011
  • Recently, fast-growing up railway transportations. Because, regional traffic congestion problem solving and a period of rapid expansion to meet the demand of industries. In addition the government also suggest to new paradigm for the future 'Low Carbon, Green Growth' is presented as a new national vision. To meet the social needs and the time demands, Last of the railway increase very long tunnels and huge deep tunnels. Especially this trend accelerated high speed up in the tunnel, the revision of design criteria and research challenges are being actively improved. Mainly in the tunnel cross-section was under the control of the vehicle train speed 150km/hr by the construction of the vehicle cross-section of the tunnel. More than 200km/hr rail tunnel depending on the vehicle's speed caused the tunnel to the pressure fluctuations will be governed by the aerodynamic changes. Considering the economy to ensure the optimum cross-section of the railway tunnel to the description scheme is selected cross-section of the railway tunnel to determine the size domestic or international railway tunnel for the elements((based on fast Algorithm design criteria, the center line spacing, streetcar line, cross-sectional shape, sectoral issues, such as interface and aerodynamics) based on design practices and to review results. In this study, to propose guidelines depending on the size of a railway tunnel cross section for the size of the determining reasonable factors when designing the railway tunnel and cost-effective standards guidelines.

  • PDF

An Experimental Study of Smoke Movement in Tunnel Fires with Aspect Ratio of Tunnel Cross Section (터널 화재시 터널 단면의 종횡비에 따른 연기 거동에 관한)

  • Lee, Sung-Ryong;Ryou, Hong-Sun;Kime, Choong-Ik
    • Proceedings of the KSME Conference
    • /
    • 2003.11a
    • /
    • pp.115-120
    • /
    • 2003
  • In this study, smoke movement in tunnel fires was investigated with various aspect ratio(0.5, 0.667, 1.0, 1.5, 2.0) of tunnel cross section. Reduced-scale experiments were carried out under the Froude scaling using 8.27 kW ethanol pool fire. Temperatures were measured under the ceiling and vertical direction along the center of the tunnel. Smoke front velocity and temperature decrease rate were reduced as higher aspect ratio of the tunnel cross-section. Smoke movement was evaluated by analysis of vertical temperature distribution 3 m downstream from the fire source. Elevation of smoke interface according to N percent rule was under about 60% of tunnel height.

  • PDF

A Case Study on the effects of Elephant Foot Method considering the rate of Changes in Tunnel Cross Section (터널 단면적 변화를 고려한 각부보강 영향성 평가)

  • Lee, Gil-Yong;Oh, Hyeon-Mun;Cho, Kye-Hwan;Oh, Jeong-Ho;Kim, Jong-Ju;Kim, Yong-Seong
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.1
    • /
    • pp.111-118
    • /
    • 2018
  • In case of excavation of the tunnel under weak ground conditions, such as fault zone, leg pile reinforcement with the purpose of suppressing tunnel crown settlement and side wall displacement is commonly applied. There are convergence, crown settlement, leg settlement, and the axial force of leg as a main factor for confirming the safety of support considering the installation angle and length of leg pile reinforcement according to the increase in rate of change of tunnel cross-section. In particular, the influence of right corner settlement, among variables for safety confirmation during excavation, has been analyzed as the dominant factor in the most important priority management showing larger displacement tendency than the increase in rate of the cross-section. And, it was analyzed that the occurrence tendency of axial force on leg pile reinforcement showed the influence of behavior according to the friction support concept mechanism of the pile reinforcement rather than the increase in rate of tunnel cross-section, as it showed a small increase compared to the increase rate of the tunnel cross-section which did not show a great correlation from the viewpoint of the change of the axial force by the length of each leg pile reinforcement with regards to the change in rate of increase in tunnel cross-section. If a certain length of the leg pile reinforcement is selected based on the above grounds, even if the cross-section of the tunnel in poor ground condition is somewhat larger, it has been proved to be a more reasonable method considering the workability and economical efficiency by not extending the length of the leg pile reinforcement by force.

Development of Cross Section Management System in Tunnel using Terrestrial Laser Scanning Data (지상 레이저 스캐닝 자료를 이용한 터널단면관리시스템 개발)

  • Roh, Tae-Ho;Kim, Jin-Soo;Lee, Young-Do
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.11 no.1
    • /
    • pp.90-104
    • /
    • 2008
  • Laser scanning technology with high positional accuracy and high density will be widely applied to vast range of fields including geomatics. Especially, the development of laser scanning technology enabling long range information extraction is increasing its full use in civil engineering. This study taps into the strengths of a terrestrial laser scanning technique to develop a tunnel cross section management system that can be practically employed for determining the cross section of tunnels more promptly and accurately. Three dimensional data with high density were obtained in a prompt and accurate manner using a terrestrial laser scanner. Data processing was then conducted to promptly determine arbitrary cross sections at 0.1meter, 0.5meter and 1.0meter intervals. A laser scanning technique was also used to quickly and accurately calculate the overbreak and underbreak of both each cross section and the entire tunnel section. As the developed system utilizes vast amounts of data, it was possible to promptly determine the shape of arbitrary cross section and to calculate the overbreak and underbreak more accurately with higher area precision. It is expected, therefore, that the system will not only enable more efficient and cost effective tunnel drilling management and monitoring but also will provide a basis for future construction and management of tunnel cross section.

  • PDF

A study on the optimum cross-section design that satisfies the criteria of aural discomfort in Honam high speed railway tunnel (이명감 특성을 고려한 호남고속철도 터널단면 설정에 관한 연구)

  • Kim, Seon-Hong;Mun, Yeon-O;Seok, Jin-Ho;Kim, Gi-Rim;Kim, Chan-Dong;Yu, Ho-Sik
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.10a
    • /
    • pp.19-36
    • /
    • 2007
  • When the trains runs at a high speed in the tunnel, passengers feel a pain in the ear that fast pressure fluctuation inside the tunnel being delivered with pressure fluctuation inside the passenger car. These phenomena are called "aural discomfort". Aural discomfort increase the passengers' uncomfort so that it is decreased a service level and serious case, it is able to damage the ear of the passenger. therefore aural discomfort must be considered the high-speed railroad tunnel cross-section design. To solve the problem of aural discomfort in a railway tunnel, some countries have standards on aural discomfort. It has been studied that different countries have different standards on aural discomfort. For that reason, the criteria of aural discomfort was reviewed through the standards of Kyungbu HSR line and different countries in this paper. And then Numerical Analysis of the Characteristics with tunnel cross-section change has been used for the selection of the optimum cross-section of Honam. The numerical analysis results were compared to field test results in order to verifying the reliability of the numerical analysis.

  • PDF

Aerodynamic analysis on the step types of a railway tunnel with non-uniform cross-section

  • Li, Wenhui;Liu, Tanghong;Huo, Xiaoshuai;Guo, Zijian;Xia, Yutao
    • Wind and Structures
    • /
    • v.35 no.4
    • /
    • pp.269-285
    • /
    • 2022
  • The pressure-mitigating effects of a high-speed train passing through a tunnel with a partially reduced cross-section are investigated via the numerical approach. A compressible, three-dimensional RNG k-ε turbulence model and a hybrid mesh strategy are adopted to reproduce that event, which is validated by the moving model test. Three step-like tunnel forms and two additional transitions at the tunnel junction are proposed and their aerodynamic performance is compared and scrutinized with a constant cross-sectional tunnel as the benchmark. The results show that the tunnel step is unrelated to the pressure mitigation effects since the case of a double-step tunnel has no advantage in comparison to a single-step tunnel, but the excavated volume is an essential matter. The pressure peaks are reduced at different levels along with the increase of the excavated earth volume and the peaks are either fitted with power or logarithmic function relationships. In addition, the Arc and Oblique-transitions have very limited gaps, and their pressure curves are identical to each other, whereas the Rec-transition leads to relatively lower pressure peaks in CPmax, CPmin, and ΔCP, with 5.2%, 4.0%, and 4.1% relieved compared with Oblique-transition. This study could provide guidance for the design of the novel railway tunnel.

A study on the selection of optimal cross section according to the ventilation system in TBM road tunnels (TBM 도로터널의 환기방식에 따른 최적단면 선정에 관한 연구)

  • Lee, Ho-Keun;Kang, Hyun-Wook;Kim, Hyun-Soo;Kim, Hong-Moon
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.2
    • /
    • pp.135-148
    • /
    • 2013
  • Recently, road tunnels have become longer and the plans for long and deep road tunnel have been underway in urban areas. These long and deep tunnel excavations include NATM and TBM. Shield TBM is applied to around 80% of traffic tunnels in Europe, and approximately 30% of them in other developed countries. However, as much of equipment is imported from foreign countries at high prices and distribution rate of TBM tunnel is considerably low in Korea, NATM excavation method is commonly used. To increase TBM tunnel, it is necessary to do assure economic feasibility with the supply-demand of TBM equipment. For this, the selection of standardized TBM diameter is urgently needed. Therefore, the study aims to estimate the standardized optimum section properties of TBM by examining TBM excavation cross section utilization depending on the volume of traffic, the number of lane and its cross-section type(single or double deck), and ventilation system.

Security Interpretation of the Restriction Boundary of Building for Antiquated Tunnel using 3 Dimensional Surveying (3차원 측량에 의한 노후 터널의 건축한계 확보 해석)

  • Bae Sang-Ho;Lee Hyung-Seok
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.24 no.3
    • /
    • pp.251-259
    • /
    • 2006
  • For the electrification of the existing railways, the security of the restriction boundary of building with mechanistic stability research on the antiquated tunnel must be accomplished essentially. If the tunnel don't secure its restriction boundary of building, the reconstruction based on improvement of tunnel alignment are generated and its surveying data are required. The precise surveying was conducted with the same coordinate system for three tunnels of Youngdong tramline, and the restriction boundary of building of the straight and curve section were analyzed effectively by acquiring the data of profile and cross section, profile rail-height, rail-grade, cross tunnel height, and restriction boundary of building. This study is presented for valuation data of the stability of the electrification design to construct and analyze restriction boundary of building, which compared with the drawing and its existing design using profile and cross section. After this, it is interoperable to increase the development of real-time monitoring system on the tunnel structures.

Assessment of time-dependent behaviour of rocks on concrete lining in a large cross-section tunnel

  • Mirzaeiabdolyousefi, Majid;Nikkhah, Majid;Zare, Shokrollah
    • Geomechanics and Engineering
    • /
    • v.29 no.1
    • /
    • pp.41-51
    • /
    • 2022
  • Tunneling in rocks having the time-dependent behavior, causes some difficulties like tunnel convergence and, as a result, pressure on concrete lining; and so instability on this structure. In this paper the time-dependent behaviour of squeezing phenomenon in a large cross section tunnel was investigated as a case study: Alborz tunnel. Then, time-dependent behaviour of Alborz tunnel was evaluated using FLAC2D based on the finite difference numerical method. A Burger-creep viscoelastic model was used in numerical analysis. Using numerical analysis, the long-time effect of squeezing on lining stability was simulated.This study is done for primary lining (for 2 years) and permanent lining (for 100 years), under squeezing situations. The response of lining is discussed base on Thrust Force-Bending Moment and Thrust Force-Shear Force diagrams analysing. The results determined the importance of consideration of time-dependent behaviour of tunnel that structural forces in concrete lining will grow in consider with time pass and after 70 years can cause instability in creepy rock masses section of tunnel. To show the importance of time-dependent behavior consideration of rocks, elastic and Mohr-Coulomb models are evaluated at the end.