1 |
Kim, H.S., Kim, H.M. (2012), "A study on cross sectional characteristics and available area for using the lower space in TBM road tunnels", Korean Tunnelling and Underground Space Association, Vol. 14-2, pp. 141-157.
과학기술학회마을
DOI
ScienceOn
|
2 |
Ministry of Land, Transport and Maritime Affairs (2009), "National standard of safety facilities installation and management for road tunnel", Korea.
|
3 |
Ministry of Land, Transport and Maritime Affairs (2011), "Handbook of road design", Chapter 6. "Tunnel", Korea.
|
4 |
Korea Expressway Corporation (2012), "Review the tunnel cross-section optimization method"
|
5 |
Byun, S.H., Jeong, J.H., Jun, D.C., Shin, I.J., Sim, D.H. (2011), "A case study on M & E design for double-deck tunnel in urban area", TUNNEL & UNDERGROUND SPACE, Journal of Korean Society for Rock Mechanics, Vol. 21, No. 4, pp. 281-286.
과학기술학회마을
|
6 |
Yoo, Y.H., Kweon, O.S. (2010), "A study on the HRR and fire propagation phenomena for the safety design of deep road tunnel", Korean Tunnelling and Underground Space Association, Vol. 12-4, pp. 321-328.
과학기술학회마을
|
7 |
Korea Expressway Corporation (2006), "CFD analysis method on the selection of critical velocity on expressway tunnel".
|
8 |
Lee, S.C., Kim, S.I. (2012), "The effect of grid number and the location and size of the fire source on the critical velocity in a road tunnel fire", Korean Tunnelling and Underground Space Association, Vol. 14-3, pp. 183-195.
과학기술학회마을
DOI
ScienceOn
|