• Title/Summary/Keyword: tunnel anchor

Search Result 49, Processing Time 0.029 seconds

Global Mobility Management Scheme for Seamless Mobile Multicasting Service Support in PMIPv6 Networks

  • Song, Myungseok;Cho, Jun-Dong;Jeong, Jong-Pil
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.9 no.2
    • /
    • pp.637-658
    • /
    • 2015
  • The development of multimedia applications has followed the development of high-speed networks. By improving the performance of mobile devices, it is possible to provide high-transfer-speed broadband and seamless mobile multicasting services between indoor and outdoor environments. Multicasting services support efficient group communications. However, mobile multicasting services have two constraints: tunnel convergence and handoff latency. In order to solve these problems, many protocols and handoff methods have been studied. In this paper, we propose inter local mobility anchor (inter-LMA) optimized handoff model for mobile multicasting services in proxy mobility IPv6 based (PMIPv6-based) networks. The proposed model removes the tunnel convergence issue and reduces the router processing costs. Further, it the proposed model allows for the execution of fast handoff operations with adaptive transmission mechanisms. In addition, the proposed scheme exhibits low packet delivery costs and handoff latency in comparison with existing schemes and ensures fast handoff when moving the inter-LMA domain.

Case Study of the Stability of a Large Cut-Slope at a Tunnel Portal (터널 입구부 대절토 사면 안정성 사례 연구)

  • Park, Dong Soon;Bae, Jong-Soem
    • The Journal of Engineering Geology
    • /
    • v.25 no.1
    • /
    • pp.115-129
    • /
    • 2015
  • The cut-slope of a large-sectional tunnel portal is recognized as a potential area of weakness due to unstable stress distribution and possible permanent displacement. This paper presents a case study of a slope failure and remediation for a large-scale cut-slope at a tunnel portal. Extensive rock-slope brittle failure occurred along discontinuities in the rock mass after 46 mm of rainfall, which caused instability of the upper part of the cut-slope. Based on a geological survey and face mapping, the reason for failure is believed to be the presence of thin clay fill in discontinuities in the weathered rock mass and consequent saturationinduced joint weakening. The granite-gneiss rock mass has a high content of alkali-feldspar, indicating a vulnerability to weathering. Immediately before the slope failure, a sharp increase in displacement rate was indicated by settlement-time histories, and this observation can contribute to the safety management criteria for slope stability. In this case study, emergency remediation was performed to prevent further hazard and to facilitate reconstruction, and counterweight fill and concrete filling of voids were successfully applied. For ultimate remediation, the grid anchor-blocks were used for slope stabilization, and additional rock bolts and grouting were applied inside the tunnel. Limit-equilibrium slope stability analysis and analyses of strereographic projections confirmed the instability of the original slope and the effectiveness of reinforcing methods. After the application of reinforcing measures, instrumental monitoring indicated that the slope and the tunnel remained stable. This case study is expected to serve as a valuable reference for similar engineering cases of large-sectional slope stability.

Analysis of the Stability and Behavior of a Calcareous Rock Slope During Construction of a Tunnel Entrance (터널출입구 시공에 따른 석회암 사면의 안정성 및 거동 분석)

  • Song, Young-Suk;Yun, Jung-Mann
    • The Journal of Engineering Geology
    • /
    • v.23 no.3
    • /
    • pp.283-292
    • /
    • 2013
  • A calcareous rock slope failed during excavation of the slope for construction of a tunnel entrance. The slope is located at the construction site for widening highway in Yeongwol, Korea. Field surveys, laboratory tests, and numerical analyses were performed to determine the reason for the slope failure. The numerical analysis revealed that the safety factor of the slope before construction of the entrance was less than 1, and that this decreased after construction. After construction of the entrance, the sliding zone of the slope increased and slope stability decreased because the shear strain and plastic zone in the slope over the tunnel entrance showed an increase relative to the lower part of the slope. To enhance the stability of the slope for construction of the tunnel entrance, countermeasures such as rock bolts, rock anchors, and FRP (Fiber glass Reinforced Plastic) grouting were adopted in light of the field conditions. Serial field monitoring performed to confirm the reinforcing effects of the adopted countermeasures revealed a small amount of horizontal deformation of the slope soils, most of the elastic deformation that can regain its former value. In addition, the axial forces of the rock bolt and anchor were more strongly affected by slope excavation during construction of the tunnel entrance than by tunnel excavation or the rainy season, and the axial forces tended to converge after excavation of the tunnel. Therefore, we can confirm that the slope is currently safe.

Mechanical Characteristics of Cementing Plane in Concrete Repair under Various Cementing Conditions (접합조건에 따른 콘크리트 접합부의 역학적 특성)

  • 김재동;정요훈
    • Tunnel and Underground Space
    • /
    • v.13 no.5
    • /
    • pp.362-372
    • /
    • 2003
  • Since the occurrence of Portland cement, a great number of concrete structures were constructed. But the concrete structures have their own life times, which inevitably demand repairing treatments, especially on their surface parts. Currently many various methods have been developed and are being applied fer this purpose. In this study, a newly developed method using pneumatic chipping machine and anchor pin was adopted far repair of old concrete structure and the mechanical characteristics of cementing plane between existing and new concrete were tested. Comparing the removal methods for the decrepit part of existing concrete using pneumatic chipping machine and hydraulic breaker, the peak cohesion was higher when using chipping machine at the cementing plane. On the other hand, the residual cohesion was higher for the case of breaker. Step shaped chipping on the cementing plane was effective in increasing peak cohesion, which results 14% increase in the case of 30 mm step height and 22% in 50 mm height when compared with planar chipping plane. The use of anchor pin increased the residual cohesion, which restricted shear slip on the cementing plane after peak shear stress and the tensile strength of 32% compared with that of non-anchored case. According to the combined effect of step shaped chipping of 30 mm and anchor pin with an interval of 15 cm, the peak cohesion reached up to 77% and the residual cohesion showed 180% of the ones of the fresh concrete, respectively.

Leveraging Proxy Mobile IPv6 with SDN

  • Raza, Syed M.;Kim, Dongsoo S.;Shin, DongRyeol;Choo, Hyunseung
    • Journal of Communications and Networks
    • /
    • v.18 no.3
    • /
    • pp.460-475
    • /
    • 2016
  • The existing Proxy Mobile IPv6 suffers from a long handover latency which in turn causes significant packet loss that is unacceptable for seamless realtime services such as multimedia streaming. This paper proposes an OpenFlow-enabled proxy mobile IPv6 (OF-PMIPv6) in which the control of access gateways is centralized at an OpenFlow controller of a foreign network. The proposed OF-PMIPv6 separates the control path from the data path by performing the mobility control at the controller, whereas the data path remains direct between a mobile access gateway and a local mobility anchor in an IP tunnel form. A group of simple OpenFlow-enabled access gateways performs link-layer control and monitoring activities to support a comprehensive mobility of mobile nodes, and communicates with the controller through the standard OpenFlow protocol. The controller performs network-layer mobility control on behalf of mobile access gateways and communicates with the local mobility anchor in the Proxy Mobile IPv6 domain. Benefiting from the centralized view and information, the controller caches the authentication and configuration information and reuses it to significantly reduce the handover latency. An analytical analysis of the proposed OF-PMIPv6 reactive and proactive handover schemes shows 43% and 121% reduction in the handover latency, respectively, for highly utilized network. The results gathered from the OF-PMIPv6 testbed suggest similar performance improvements.

Clinical Results of Anterior Cruciate Ligament Reconstruction Using Hamstring Tendon (슬괵건을 이용한 전방십자인대 재건술의 임상적 결과)

  • Song Eun Kyoo;Lee Keun Bae;Shin Sang Gyoo;Kim Hyun Jong
    • Journal of Korean Orthopaedic Sports Medicine
    • /
    • v.1 no.1
    • /
    • pp.21-25
    • /
    • 2002
  • Purpose: To evaluate the clinical results after anterior cruciate ligament (ACL) reconstruction with hamstring tendon and Ligament Anchor (LA) screw, which is newly designed for fixation of graft into femur. Materials and Methods: Fifty eight patients who were followed up at least more than 2 years after ACL reconstruction with four strands of Hamstring tendon and LA screw were included in this study. The graft was fixed with LA screw at femoral tunnel and with only bioabsorbable interference screw at tibial tunnel. The mean follow-up period was 28 months. The clinical results were evaluated by physical examination and Lysholm knee score. Widening of bony tunnel and anterior laxity difference compared with normal side by instrumented anterior laxity test with Telos(R) (Telos stress device; Austin & Associates, Inc., Polston, US) were evaluated. Results: The Lysholm knee score improved from 60.0 points preoperatively to 94.0 points at last follow up. On the Lachman test, there were mild (+) instability in 16 cases, moderate (++) in 24,severe (+++) in 18 preoperatively. 50 cases were converted to negative and 8 to mild instability at postoperative follow up. On instrumented anterior laxity test with Telos(R), difference between normal and affected knee on 20 lb was 12.9 mm in average preoperatively, and was decreased to 3.1mm at last follow-up. The femoral tunnel was widened from 10.6 mm postoperatively to 12.7 mm (21.1$\%$) at follow up on antero-posterior plane and from 10.7 mm to 12.4 mm (16.5$\%$) on lateral plane. Tibial tunnels was also widened from 9.8mm to 11.8mm (20.7$\%$) on antero-posterior plane and from 9.9mm to 11.7 mm ($18.9\%$) on lateral plane. Complications were: anterior knee crepitus in 17 case, quadriceps muscle atrophy(>3 cm) in 6, penetration of screw over the lateral femoral cortex in 5, saphenous nerve paresthesia in 2.Conclusions: ACL reconstruction with hamstring tendon and LA screw was one of the choice of grafts and fixation devices in restoring knee stability and in improving clinical results with little complications such as excessive widening of bony tunnel and anterior knee pain

  • PDF

Enhanced PMIPv6 Route Optimization Handover using PFMIPv6 in Mobile Cloud Environment (모바일 클라우드 환경에서 PFMIPv6를 이용한 향상된 PMIPv6 경로 최적화 핸드오버 기법)

  • Na, Je-Gyun;Seo, Dae-Hee;Nah, Jae-Hoon;Mun, Young-Song
    • Journal of the Institute of Electronics Engineers of Korea TC
    • /
    • v.47 no.12
    • /
    • pp.17-23
    • /
    • 2010
  • In the mobile cloud computing, the mobile node should request and receive the services while being connected. In PMIPv6, all packets sent by mobile nodes or correspondent nodes are transferred through the local mobility anchor. This unnecessary detour still results in high delivery latency and significant processing cost. Several PMIPv6 route optimization schemes have been proposed to solve this issue. However, they also suffer from the high signaling costs and handover latency when determining the optimized path. We propose the route optimization handover scheme which adopts the prediction algorithm in PFMIPv6. In the proposed scheme, the new mobile access gateway establishes the bi-directional tunnel with the correspondent node's MAG using the context message when the mobile node's handover is imminent. This tunnel may eliminate the need of separate route optimization procedure. Hence, the proposed scheme can reduce the signaling cost than other conventional schemes do. Analytical performance evaluation is preformed to show the effectiveness of the proposed scheme. The result shows that our scheme is more effective than other schemes.

A Crossover Node Discovery and Local Repair Mechanism for Reducing the Signaling Delay of Resource Reservation on HMIPv6 Networks (HMIPv6 네트워크에서 자원예약 시그널링 지연을 줄이기 위한 크로스오버 노드 발견 및 지역적 자원 갱신 방안)

  • Byun, Hae-Sun;Lee, Mee-Jeong
    • The KIPS Transactions:PartC
    • /
    • v.15C no.1
    • /
    • pp.37-44
    • /
    • 2008
  • In order to minimize the signaling delay for a resource reservation on the new routing path after the handover of Mobile Node(MN) is completed, it is important to discover the crossover node where the old and new routing paths meet. With the 크로스오버 노드 being found, the signaling messages only need to be transferred on the changed part of the end-to-end path. The crossover node is generally discovered using the end-to-end Session ID(SID) of the established session between MN and Correspondent Node(CN). However, in the Hierarchical Mobile IPv6(HMIPv6) network, if the Mobile Anchor Point (MAP) reserves the resource by aggregate with the Home Agent(HA), the crossover node discovery cannot be performed in the general way since the aggregate SID that has established between the previous MAP and HA is different from the that of the current MAP and HA after MN's handover. In this paper, we propose a mechanism to discover the crossover node within the tunnel between the MAP and the HA in an HMIPv6 network, assuming that the Next Steps in Signaling(NSIS) is deployed for the resource reservation and the aggregate reservation is applied over the MAP and HA tunnel. The local repair required for the change of path is performed upon the crossover node discovery. The simulation results show that the proposed scheme reduces the signaling delay for the reservation and outperforms the existing scheme with respect to throughput during the handover.

Assessment of Acid Rock Drainage Production Potential and Damage Reduction Strategy: A Case Study of Tunnel Construction Area (암석의 산성배수 발생개연성 평가 및 피해저감대책: 터널건설예정구간 사례)

  • Kim, Jae-Gon;Lee, Jin-Soo;Kim, Tong-Kwon
    • Economic and Environmental Geology
    • /
    • v.41 no.3
    • /
    • pp.335-344
    • /
    • 2008
  • The acid rock drainage (ARD) production potential of rock was assessed for a tunnel construction area, Kimhae and the damage reduction strategy was discussed based on the ARD risk evaluation. The geology of the studied area consisted of Mesozoic quartz porphyry, sandstone, tuff and granite. Sulfides occurred as a disseminated type in quartz porphyry and granite, and a vein type in sandstone. Quartz porphyry and sandstone with a high content of sulfide were classified as a potentially ARD forming rock. The drainage originated from those rocks may acidify and contaminate the surrounding area during the tunnel construction. Therefore, the drainage should be treated before it is discharged. A slope stability problem due to the ARD was also expected and the coating technology was recommended for the reduction of ARD generation before the application of supplementary work for enhancing slope stability such as shotcrete and anchor. From the ARD risk analysis, those rocks should not be used as aggregate and be used as bank fill material with the system for the minimum contact with rain water and ground-water.

The Evaluation of 3-D Slope Stability Analysis (3차원 사면안정해석법의 유효성 평가)

  • Choi, Young-Jun;Lee, Soo-Heon;Hwang, Seung-Hyun;An, Joon-Sang;Sato, Yuji
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.411-418
    • /
    • 2009
  • So far the Limit Equilibrium Method has been widely used by way of 2-D slope stability analysis for the evaluation of land slides and slope failures. However recently the evaluation of 3-D slope stability analysis has been comparatively possible owing to the developments of obtaining the terrain data and geological data and of 3-D slope stability analysis softwares. In Japan the evaluation of the 3-D slope stability analysis has been necessary for the stability analysis of the tunnel mouth. In this study we inspected the economic effects introducing the 3-D slope stability analysis for larger scale landslides and slope failures. In case of 3-D slope stability analysis of landslides we acquired the results that we reduce the cost of the countermeasure work of pile work by 40% comparing the 2-D slope stability analysis. Moreover in case of the stability analysis of slope failures we figured out the results that we reduce the cost of the countermeasure work of anchor works by 20%. Furthermore we proved that 3-D slope stability analysis is effective for the stability analysis of tunnel mouths around the sides of landslides and large scale embankment which we could have not evaluated by conventional 2-D section stability analysis.

  • PDF