• Title/Summary/Keyword: trip-out

Search Result 182, Processing Time 0.034 seconds

Errors and Causes in Railroad Demand Forecasting (the Incheon International Airport Railroad) (철도수요예측 오차현황 및 원인분석에 관한 연구 (인천국제공항철도 사례를 중심으로))

  • NamKung, Baek-Kyu;Chung, Sung-Bong;Park, Cho-Rong;Lee, Cheol-Ju
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.2309-2318
    • /
    • 2010
  • It is a plan the government increases a railroad section SOC investment, and to activate railroad construction while a railroad wins the spotlight with green transportation. But an error of the demand forecast that is a base of a railroad investment evaluation follows in occurring big, there is it with an operation with an obstacle of a railroad investment. Case of the Incheon International Airport Railroad which went into operation recently, While a present transportation demand showed about 10% than a demand forecasted in a past conference, it was magnified in a social problem. A lot of research was gone on in road project about traffic demand forecast and error, a study to find out the error cause is an insufficient situation although errors of a railroad occurs big. So, this study looked for errors and causes about trip generation model and modes sharing model of railroad demand forecast but it was defined causes so that it can occur similar problems in the future. Especially it investigated causes after comparing rate of development plan for the realization and O/D size in trip generation model and after comparing rate of modes sharing of past and current and conducting a survey for airport users. In conclusion, it suggested method to reduce errors of railroad demand forecasting in the future.

  • PDF

Development of Arc-horn to be mounted on 154kV Transmission Line Arrester (154kV 송전선로 피뢰기 설치용 아킹혼 개발)

  • Min, Byeong-Wook;Kim, Woo-Kyum;Lee, Buk-Chang;Choi, Han-Yeol;Park, Jae-Ung;Keum, Eui-Yeon
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.335-336
    • /
    • 2008
  • Overhead transmission lines are mainly crossing mountainous area. They are easily affected in weathers like typhoon, strong wind, lightning, heavy rain, or heavy snow. Sometimes these weathers cause transmission line faults. A lightning flashover is most often fault. Nowadays lightning density in KOREA is growing high and lightning flashovers occur more often. A lightning flashover on transmission line is mostly cleared by momentary operation of a circuit breaker, so power failure happens rarely. However, when both circuits trip simultaneously due to the lightning flashovers on double circuit transmission line, short time power failure and voltage drop happen. KEPCO has used transmission line arresters to avoid double circuit simultaneous trip out since 2003. And transmission line arresters cannot be installed with KEPCO's present metal fittings, so various fittings have been used for each transmission line arrester manufacturer. This paper introduces development and standardization of arc-horn and metal fittings for transmission line arrester which can be used for both existing lines and new lines in KEPCO.

  • PDF

A Study on the Prediction of Nugget Diameter of Resistance Spot Welded Part of 1.2GPa Ultra High Strength TRIP Steel for Vehicle (차체용 1.2GPa급 초고장력 TRIP강판의 저항 점 용접부 너겟 지름 예측에 관한 연구)

  • Shin, Seok-Woo;Lee, Jong-Hun;Park, Sang-Heup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.3
    • /
    • pp.52-60
    • /
    • 2018
  • In the automobile industry, in order to increase the fuel efficiency and conform to the safety regulations, it is necessary to make the vehicles as light as possible. Therefore, it is crucial to manufacture dual phase steels, complex phases steels, MS steels, TRIP steels, and TWIP from high strength steels with a tensile strength of 700Mpa or more. In order to apply ultra-high tensile strength steel to the body, the welding process is essential. Resistance spot welding, which is advantageous in terms of its cost, is used in more than 80% of cases in body welding. It is generally accepted that ultra-high tensile strength steel has poor weldability, because its alloy element content is increased to improve its strength. In the case of the resistance spot welding of ultra-high tensile steel, it has been reported that the proper welding condition area is reduced and interfacial fracture and partial interfacial fracture occur in the weld zone. Therefore, research into the welding quality judgment that can predict the defect and quality in real time is being actively conducted. In this study, the dynamic resistance of the weld was monitored using the secondary circuit process variables detected during resistance spot welding, and the factors necessary for the determination of the welding quality were extracted from the dynamic resistance pattern. The correlations between the extracted factors and the weld quality were analyzed and a regression analysis was carried out using highly correlated pendulums. Based on this research, a regression model that can be applied to the field was proposed.

Estimation of Freeway Traffic Accident Rate using Traffic Volume and Trip Length (교통량과 통행길이를 고려한 고속도로 교통사고 예측 연구)

  • Baek, Seung-Geol;Jang, Hyeon-Ho;Gang, Jeong-Gyu
    • Journal of Korean Society of Transportation
    • /
    • v.23 no.2
    • /
    • pp.95-106
    • /
    • 2005
  • Road accidents are considered as the result of a complex interplay between road, vehicle, environments, and human factors. Little study, however, has been carried out on the attributes of human factor compared to the road geometric conditions and traffic conditions. The previous researches focused on mainly both traffic and geometric conditions on specific location. Therefore, it's hard to explain phenomenon of the high traffic accident rates where road and traffic conditions are good. Because of these reasons, accident analysis has contributed on geometric improvement and has not contributed on traffic management such as selection of attention section, driver napping alert, etc. The freeway incident management is also associated with reliable prediction of incident occurrences on freeway sections. This paper presents a method for estimating the effect of trip length on freeway accident rate. A PAR (Potential Accident Ratio), the new concept of accident analysis, considering TLFDs (Trip Length Frequency Distributions) is suggested in this paper. This approach can help to strengthen freeway management and to reduce the likelihood of accidents.

A Study on the Risk Factors at the Broadcasting Production Site (방송 제작 특성에 기반한 유해위험요인 분석)

  • Nam, Yun Kyung;Jin, Sangeun;Lee, Jong-Bin;Kim, Kyungwoo;Na, Minoh
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.67-75
    • /
    • 2020
  • Due to various industrial accident that occur to the staff in the broadcasting production sites, the issue of safety at the broadcast production site is becoming a social issue. Nevertheless, not many researches have been carried out on the actual conditions of the staff's production environment and its safety issues. Therefore, the purpose of this study was to prepare a countermeasure based on engineering knowledge by analyzing working environment to improve the poor working environment of staff. First, this study analyzed statistical data of industrial accidents over the past five years to find out the current status of disasters at broadcasting production sites. As a result, the intensity of the accident was not weak in that the loss days was more than one month in 85% of accident. In addition, the type of accident was high in the fall/trip accidents. Second, this study visited 10 broadcasting production sites for risk assessment. By analyzing the characteristics of the working environment and 104 questionnaires, we predicted the types of accidents that can occur in the broadcasting production site. As a result, accident types such as fall, collision, and trip were relatively high, similar to the characteristics of construction site. Third, it was possible to quantify the scale of the risk in the broadcasting production, and as a result, the quantity of temporary structure and accident risk were proportional. In other words, this study analyzes broadcasting work environment and defines risk factors based on safety engineering knowledge. Finally, this study suggested a guideline to improve the safety of the broadcasting production site.

Accuracy Improvement of RTT Measurement on the Alternate Path in SCTP (SCTP에서 대체 경로의 RTT 정확도 향상)

  • Kim, Ye-Na;Park, Woo-Ram;Kim, Jong-Hyuk;Park, Tae-Keun
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.5B
    • /
    • pp.509-516
    • /
    • 2009
  • The Stream Control Transmission Protocol(SCTP) is a reliable transport layer protocol that provides several features. Multihoming is the one of the features and allows an association(SCTP's term for a connection) between two endpoints to use multiple paths. One of the paths, called a primary path, is used for initial data transmission and in the case of retransmission an alternate path is used. SCTP's current retransmission policy attempts to improve the chance of success by sending all retransmissions to an alternate destination address. However, SCTP's current retransmission policy has been shown to actually degrade performance in many circumstances. It is because that, due to Karn's algorithm, successful retransmissions on the alternate path cannot be used to update RTT(Round-Trip Time) estimation for the alternate path. In this paper we propose a scheme to avoid such performance degradation. We utilize 2bits which is not used in the flag field of DATA and SACK chunks to disambiguate original transmissions from retransmissions and to keep RTT and RTO(Retransmission Time-Out) values more accurate.

A Study on the Analysis of Failures Related to Emergency Diesel Generators in Overseas Nuclear Power Plants (원전용 비상디젤발전기 국외 손상사례 분석에 관한 연구)

  • Chang, Jung-Hwan;Kim, Jin-Sung;Chung, Hae-Dong;Cho, Kwon-Hae
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.5 no.1
    • /
    • pp.32-37
    • /
    • 2009
  • The emergency diesel generator (EDG) in a nuclear power plant (NPP) shall start within 10 secondss and supply electrical power to engineered safety features within one minute and less if a loss of offsite power (LOOP), A design-basis event, or their combination occur. Each NPP has an EDG set consisting of two diesel generators for redundancy. In addition to the EDG set, an alternate Alternating Current Diesel Generator (AAC DG) is installed and shared by several units to cope with a station black out (SBO), i.e., loss of the offsite power concurrent with reactor trip and unavailability of the EDG set. The objective of this study is to analyze the failure data of emergency diesel generators reported in overseas nuclear power plants.

  • PDF

A Study on the Possibility of Place Marketing in Railway (철도 부분의 장소 마케팅 도입 가능성 검토)

  • Lee, Won-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.915-920
    • /
    • 2009
  • Place Marketing is a new strategy for the regional development, using the regional image, facility and history. The purpose of this paper is to search the possibility of place marketing in the area of railway. Already there were some cases to vitalize the close line and out-of-business station. In this context, some ideas to connect the railway with trip, leisure and regional festival are recommended. For the market place, the cooperation with local government is essential.

Control Method for Cut-out of Shorted Load in the Auxiliary Power Supply (보조전원장치의 단락부하 차단기 개방을 위한 제어방법)

  • 황광철;조국춘;최종묵
    • Proceedings of the KSR Conference
    • /
    • 1998.11a
    • /
    • pp.249-254
    • /
    • 1998
  • This paper describes the control methods to cut out the NFB(No Fuse Breaker) of shorted load in the auxiliary power supply, Generally, when the short-circuit occurs in the load of the auxiliary power supply, the auxiliary power supply stops the operation according to the protection sequence. Finally, the other auxiliary power supply stops the operation by the same fault, To resolve this problem, we suggest the control method to trip the NFB of shorted load. That is, when the short circuit occurs, the controller changes control mode from voltage mode to current mode without the operation of output contactor(SIVK) in the auxiliary power supply. The auxiliary power supply provides a large current for the short-circuit load. After some time, the NFB of the short-circuit load is cut off and the auxiliary power supply Provides stable voltage for the loads except for the short-circuit load.

  • PDF

A Study on TPS based on ATO for Driverless LRT (ATO 자동운전 기반의 무인운전 경전철 TPS에 관한 연구)

  • Lee, Chang-Hyung;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1132-1137
    • /
    • 2008
  • Automatic Operation based on ATO (Automatic Train Operation) is necessary for driverless Light Rail Transit business. When this kind of driverless LRT operation plan is made, TPS (Train Performance Simulation) is traditionally simulated at all-out mode and coasting mode based on manual operation. Commercial schedule speed equals to all-out speed minus $9{\sim}15%$ make-up margin. Coasting mode TPS simulation is also run at commercial schedule speed to calculate run time and energy consumption. But TPS based on manual operation should make an improvement on accuracy in case of driverless LRT operation Plan. In this paper, new fast mode TPS simulation using ATO pattern is proposed and show near actual ATO result. The actual ATO pattern can be accurately simulated with the introduction of 4 parameters such as commercial braking rate, jerk, station stop profile and grade converted distance. Normal mode TPS simulation for commercial schedule speed can be designed to have fast mode trip time plus 3 seconds/km margin recommended by korean standard LRT specification.

  • PDF