• Title/Summary/Keyword: triangular plan

Search Result 22, Processing Time 0.022 seconds

A Study on Information Breakdown through the Analysis of Industrial Engineering EPC Business Process (산업설비 EPC 업무 분석을 통한 정보 분류 내역에 관한 연구)

  • Cho, Hang-Min;Song, Young-Woong;Choi, Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.167-172
    • /
    • 2006
  • It follows recently in an order augmentation of overseas construction market plant field and the project of oil gas field is increasing. Consequently, the hazard which secures the competitive power of the overseas plant enterprise of the domestic building industry enterprises the technical competitiveness security which stands, productivity improvement and strategy management propulsion back positive disposal plan establishment are demanded. Even from in that oil gas field of overseas plant enterprise for an industrial competitive power improvement the application of EPC circulation information which relates with a project accomplishment is more demanded, the EPC phased star efficiently it manages the circulation information contents which occurs from the business which is various it is not presented it cannot there is a contents classification system for. If with him about lower the draft the problem point of information omission back of occurrence and business subject for of the fringe land and duplication business occurs, about lower the productivity decrease actual condition is appearing with such problem point. The research which it sees consequently in order to improve the use characteristic of the augmentation of practical application of the contents management system of oil gas field and building industry information civil official establishhes the contents management system the BPM for (Business Process Management) to present the contents classification system of base, it does to sleep. The part of Business Process materiality the knowledge which is demanded, contents information and system anger it analyzes system anger of industrial equipment circulation information it takes a triangular position and to sleep it does.

  • PDF

A Study for Seepage Control of Levee with a Pervious Toe Drain (제내 비탈끝 배수공을 이용한 제방의 침투조절에 관한 연구)

  • Kong, Young-San;Kang, Tae-Uk;Lee, Sang-Ho
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.6
    • /
    • pp.569-581
    • /
    • 2012
  • The levee is the facility which is constructed along with river for the protection of landside and for passage of water when there is a flood. When the seepage is exposed to the atmosphere on the landside surface of levee, it may eventually lead to levee failure. The seepage water may be removed from the landside surface by a properly designed drainage system. The purpose of the study is to show seepage control effect of a pervious toe drain, and to compare two drainage methods of a pervious toe drain. One is the pervious toe drain suggested by U.S. Army Corps of Engineers (USACE) and the other is that suggested by Japan Institute of Construction Engineering (JICE). The levee model constructed has the following dimension: the base width is 2.6 m; the crest width is 0.4 m; the side slope 1 : 2. The water depth in the riverside is 0.5 m. The shape of the toe drain by USACE is triangular. The shape of the toe drain by JICE is rectangular. They were installed with the base length of 0.4 m. The levee model without the toe drain showed saturation surface on the land side in the experiment but not with the toe drain. The experiment results was applied to a numerical analysis model using SEEP/W to calibrate and verify. The numerical analysis results for 35 cm and 30 cm drain width showed that the drain by JICE is a little bit safer than the drain by USACE. It is also easier to construct the toe drain by JICE. The results in the study would be applied to plan the seepage control for a levee with pervious toe drain.