• 제목/요약/키워드: transmission tower-line system

검색결과 63건 처리시간 0.029초

345KV 송전선의 과도안정도계산 I (A study on transient stability of 345 KV power transmission line)

  • 이재숙
    • 전기의세계
    • /
    • 제18권1호
    • /
    • pp.24-29
    • /
    • 1969
  • This is preliminary study concerning the future construction and operation of 345KV power transmission line in Korea which will be added to the existing 161KV power system by the end of 1970 in order to increase the power carrying capacity between Seoul and Pusan area; 350 kilo meters aparts, in accordance with the ambitious second five years power development schedule of Korea Electric Company. The result of this study says that an intermidiate switching station should be installed at the middle position of the line to improve the transient stability of the system, considerable amount of capacitors or synchronous condenser are to be installed to reduce the voltage drop at receving end of line during the heavy load hours, and also in some measure to avoid the voltage rise by self-excitation of power generators during the light load hours and while energizing the line. This is the first attempt to realize the EHV power transmission line in Korea so that the additional study is necessary on the kind and size of conductors, the necessary number of insulators and the suitable clearance distances between conductor and steel tower or earth from the technical and economical view points. These are necessary steps to be taken by the writer before getting into the calculation on the transient stablity of the power system.

  • PDF

대형 송전선로에 의한 TV 전파장해 고찰 (Ghost and Blocking of TV signal by UHV Transmission Lines)

  • 신구용;이동일
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 E
    • /
    • pp.1776-1778
    • /
    • 1998
  • KEPCO has been constructing the 765 kV double circuit transmission line since 1997. It is worried that the 765 kV transmission lines make TV interference(Ghost and Blocking) due to high tower and multi sub-conductors. This paper presents the mechanism, the measuring method and the results of TV ghost and blocking measurement using a new TV ghost measurement system in a vehicle which was developed by KEPRI.

  • PDF

특수 고장력전선을 사용한 장경간 가공송전선로 설계 (Design of Long Span Overhead Transmission Line using Special High-tension Wire)

  • 나상용;지평식
    • 전기학회논문지P
    • /
    • 제65권3호
    • /
    • pp.183-187
    • /
    • 2016
  • Recently, power demand has been increasing every year according to variation of electrical equipments and temperature rise in summer season. So, much more overhead line is being demanded to copy with increasing power demand and operate reliable power system. This paper analysis the characteristics of long span overhead transmission line using special high-tension wire in such as a safety factor, coefficient of elasticity, and the coefficient of linear expansion. Based on the analysis, we proposed the effectiveness of special high-tension wire having much more advantages with respect to height of steel tower and dip compared with conventional ACSR in long span overhead transmission line.

Longitudinal reaction on conductors due to tornado wind load

  • Dingyu Yao;Ashraf El Damatty
    • Wind and Structures
    • /
    • 제38권4호
    • /
    • pp.325-339
    • /
    • 2024
  • The longitudinal force resulting from tornado loads on transmission line is considered a crucial factor contributing to the failure of transmission line structures during tornado events. Accurate estimation of this longitudinal force poses a challenge for structural designers. Therefore, the objective of this paper is to provide a set of charts that can be easily used to estimate the peak longitudinal forces transferred from the conductors to a tower. The critical wind field and corresponding configuration considered in this paper are previously studied and determined. The charts should account for all the conductor parameters that can affect the value of the longitudinal force. In order to achieve that, a parametric study is first conducted to assess the variation of the longitudinal forces with different conductor parameters, based on the critical tornado configuration. Results of this parametric study are used to develop the charts that can be used to calculate longitudinal forces by adopting a multi-variable line regression. The forces calculated from charts are validated by finite element analysis. An example for the usage of the charts is provided at the end of this paper.

Vortex induced vibration and its controlling of long span Cross-Rope Suspension transmission line with tension insulator

  • Tu, Xi;Wu, Ye;Li, Zhengliang;Wang, Zhisong
    • Structural Engineering and Mechanics
    • /
    • 제78권1호
    • /
    • pp.87-102
    • /
    • 2021
  • Long span cross-rope suspension structure is an innovative structural system evolved from typical Cross-Rope Suspension (CRS) guyed tower, a type of supporting system with short span suspension cable supporting overhead power transmission lines. In mountainous areas, the span length of suspension cable was designed to be extended to hundreds or over one thousand meters, which is applicable for crossing deep valleys. Vortex Induced Vibration (VIV) of overhead power transmission lines was considered to be one of the major factors of its fatigue and service life. In this paper, VIV and its controlling by Stockbridge damper for long span CRS was discussed. Firstly, energy balance method and finite element method for assessing VIV of CRS were presented. An approach of establishing FE model of long span CRS structure with dampers was introduced. The effect of Stockbridge damper for overall vibration of CRS was compared in both theoretical and numerical approaches. Results indicated that vibration characteristics of conductor in long span CRS compared with traditional tower-line system. Secondly, analysis on long span CRS including Stockbridge damper showed additional dampers installed were essential for controlling maximum dynamic bending stresses of conductors at both ends. Moreover, factors, including configuration and mass of Stockbridge damper, span length of suspension cable and conductor and number of spans of conductor, were assessed for further discussion on VIV controlling of long span CRS.

송전선로 설계 기술자료 계산시스템 개발 (Development of the Technical Calculation System for Transmission Line)

  • 변강;민병욱;위화복;김세현;박기용;남궁도
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.488-490
    • /
    • 2004
  • The technical data for transmission line design and maintenance are calculated by a very complicated numerical formula so it is almost impossible to solve them by hand. Therefore the TOWER+ EXPERT SYSTEM was developed to systematically support technical data for transmission line design and maintenance. This system is able to calculate technical data which is applied to all conductors in our county, - that is 12 kinds of systems with 86 numbers of standard conductors, - and is programed to be user friendly by adopting dialogue windows, menu selection functions. Moreover, it minimizes input data by automatically providing standard transmission line design data, and it includes guidance of applicable work, program usage, data input process, help, explanation of terms and automatic error recovery functions that even a beginner can easily use.

  • PDF

765kV 1회선 송전선로 기술기준 및 설계방안 (Technology and Design Standards of 765kV 1cct Transmission Line)

  • 심순보;민병욱;박갑호;조춘익;김재열;신일섭
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.80-82
    • /
    • 2002
  • To solve the difficulty in obtaining transmission routes and substation sites. increase the transmission capacity between generation sites and load centers. and enhance the stability of the power system. we have constructed and operated the 765kV double circuit transmission line(hereunder T/L) from the Dangjin thermal power plant and the Uljin nuclear power plant to the metropolitan. It makes it possible for us to accumulate know-how of the 765kV system that is the highest operating system level in Asia. As the second 765kV project, we are going to construct the 765kV single circuit T/L between Ansung and Gap yung. Because of the different electrical and mechanical characteristics. we are in need of different design technology. This paper presents the optimal design of 765kV single circuit transmission line after due consideration about the arrangement of conductors. the shape of a tower, insulation, etc.

  • PDF

3차원 GIS & CAD를 기반으로 하는 송전선로 경과지 선정시스템 개발 (A development the system to assist planning and designing a route for transmission line based 3D GIS and CAD technology)

  • 백승도;김태영;민병욱;위화복;최진성;방항권
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.63-65
    • /
    • 2006
  • These days, it is not easy to construct the transmission line because of the environmental association activity, a civil appeal, etc. To solve these kinds of difficulties, the program with leading-edge IT technology, such as GIS, 3 dimensions CAD, computer graphic, etc., is developed to be more transparent and objective in the design stage of the transmission line and the selection stage of the transmission line route. Comparing this program with previous methods, this program is composed of the environmental evaluation program, data producing program for analysis and selecting line route program because it is not possible to conduct those kinds of work without any help from the computer and well-developed program. To confirm the performance of the program, the result from the program and the human were compared. Therefore, the result from the program was same as the result conducted by human. In addition, the program makes the selection of the transmission line route easier by checking the mountainside, lumbering, the estimated cost of the tower construction, etc. in real-time.

  • PDF

Response of transmission line conductors under different tornadoes

  • Dingyu Yao;Ashraf El Damatty;Nima Ezami
    • Wind and Structures
    • /
    • 제37권3호
    • /
    • pp.179-189
    • /
    • 2023
  • Multiple studies conducted in the past evaluated the conductor response under one tornado wind field, while the performance of transmission lines under different tornado wind fields still remains unknown. Thus, the objective of this paper is to estimate the variation in the conductor's critical longitudinal and transverse reactions under different tornado wind fields, as well as providing the corresponding critical tornado configurations. The considered full-scale tornadoes are the Spencer, South Dakota, 1998, the Stockton, Kansas, 2005 and the Goshen County, Wyoming, 2009. Computational Fluid Dynamics (CFD) simulations were previously conducted to develop these wind fields. All tornadoes have been rescaled to have a common velocity matching the upper limit of the F2 Fujita scale. Eight conductor systems, each including six spans, are considered in this paper. For each conductor, parametric studies are conducted by varying the location of the three tornado wind fields relative to the tower of interest, therefore the peak reactions associated with each tornado are determined. A semi-analytical closed-form solution, previously developed and validated, is used to calculate the reactions. The study conducted in this paper can be divided into two parts: In the first part, a parametric study considering a wide range of tornado locations is conducted. In the second part, the parametric study focuses on the tornado location leading to the critical tangential velocity on the tower. Based on this extensive parametric study, a critical tornado defined as the Design Tornado and its critical locations, tornado distance R = 125 m, tornado angle 𝜃 = 15° and 30°, are recommended for design purposes.

The Analysis Results of Lightning Overvoltages by EMTP for Lightning Protection Design of 500kV Substations

  • Ju Hyung-Jun;Lee Heung-Ho
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권4호
    • /
    • pp.366-370
    • /
    • 2005
  • To meet increasing power demand, 500 kV power systems are under consideration in the regions of some Middle Asian countries. As the power system voltage becomes higher, the cost for the power system insulation increases significantly. 500 kV transmission systems will become the basis of a region's power system and they require much higher system reliability. Consequently, by the methods of limiting overvoltages effectively, a reasonable insulation design and coordination must be accomplished. In particular, the Substations must be constructed to be of outdoor type. In order to determine the various factors for the insulation design, the EMTP (Electro-magnetic transient program) is used for the magnification of transient phenomena of the 500 kV systems in the planned network. In this paper, we will explain the calculation results of lightning overvoltages by the EMTP for lightning protection design for the 500 kV substations. To obtain reliable results, the multi-story tower model and EMTP/TACS model are introduced for the simulation of dynamic arc characteristics.