Development of a Remote Inspection Method and Device for Line Sleeves on Transmission Line (송전선로 직선슬리브 원격점검 방법 및 장치)

  • Lee, Jae-Kyung;Jung, Nam-Joon;Kim, Ho-Ki;Kim, Kyeong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.60 no.4
    • /
    • pp.206-213
    • /
    • 2011
  • Line sleeves, which used to connect ACSR cables when transmission lines were constructing, sometimes cause power transmission failure due to deterioration and corrosion. Therefore, power transmission line should be inspected regularly to prevent national disaster. Current inspection tool detects insertion length of transmission line on line sleeves, the inspection tool includes enormous error by operator. Moreover, the system is not controlled remotely, negligent accident would be caused while inspecting. To deal with those problems, KEPCO reviewed several ways to inspect line sleeves and proposes new method to inspect line sleeve by measuring magnetic flex which penetrate junction of steel and aluminum sleeve. The developed inspection tool is reliable enough to detect eccentric sleeves. Also, the developed inspection device was applied on actual transmission line and verified its effectiveness.

Laser Power Beaming Based Wireless Power Transmission System for Multiple Charging of Long-distance Located Electric Vehicle (원거리 전기 자동차의 다중 충전을 위한 레이저 파워 빔 기반의 무선 전력 전송 시스템)

  • Eom, Jeongsook;Kim, Gunzung;Choi, Jeonghee;Park, Yongwan
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.11 no.6
    • /
    • pp.379-392
    • /
    • 2016
  • This paper presents the design and simulation of a laser power beaming (LPB) system for an electric vehicle that establishes an optimal power transmission path based on the received signal strength. The LPB system is possible to transfer power from multiple transmitters to a single receiver according to the characteristics of the laser and the solar panel. When the laser beams of multiple transmitters aim at a solar panel at the same time, the received power is the sum of all energy at a solar panel. Our proposed LPB system consists of multiple transmitters and multiple receivers. The transmitter sends its power characteristics as optically coded pulses with a class 1 laser beam and powers as a high-intensity laser beam. By using the attenuated power level, the receiver can estimate the maximum receivable powers from the transmitters and select optimal transmitters. Throughout the simulation, we verified the possibility that different LPB receivers were achieved their required power by the optimal allocation of the transmitter among the various transmitters.

Study on Application of Reinforcement Device to Provide Greater Dynamic Stability for Power Transmission Towers and its Effect

  • Yang, Kyeong-hyeon;Bae, Choon-hee;Jeong, Nam-geun;Kim, Doo-young;Kim, Sung-min;Jang, Yong-hee
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.1
    • /
    • pp.33-41
    • /
    • 2016
  • To verify that the friction damper used to high buildings as a kind of control technology of wind vibration can reduce dynamic behaviors of PTTs effectively, slip dampers in this paper are proposed to absorb the energy through relatively frictional movement of slip dampers applied to main post of a PTT (Power Transmission Tower) when dynamic displacement of a PTT occurs. The result of dynamic analysis is presented to determine the capacity of the damper system by controlling damping ratio on the resonance condition. It is observed that by installing slip dampers at a PTT the strain amplitudes of the main post caused by wind load are effectively reduced. Therefore it is shown that the proposed damper satisfies the strengthened wind-load design standards, and its efficacy was also validated experimentally by field testing.

Transmission Power Control using FACTS Device (FCATS Device를 이용한 송전전력 제어)

  • Park, Seung-Ho;Kim, Young-Jo;Kim, Young-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2006.10d
    • /
    • pp.152-154
    • /
    • 2006
  • This paper presents an electric power control scheme in the transmission line using a UPFC(Unified Power Flow Controller). From the practical application viewpoint, the simultaneous realization of the power response desired. The author propose a new power control algorithm for UPFC. To verify the effectiveness of the proposed algorithm, a protype inverter is built and some experiments are carried out.

  • PDF

Calculation of Phase Center of Large Geomorphological Object on the Surface

  • Kim Jun-su;Park Sang-Eun;Kim Duk-jin;Moon Wooil M.
    • Proceedings of the KSRS Conference
    • /
    • 2005.10a
    • /
    • pp.741-744
    • /
    • 2005
  • A numerical scattering model for artificial metal structure based on physical optics approximation is developed to identify the height of phase center, and the result is compared with interferometric SAR DEM. The interferometric SAR data were gathered by AIRSAR during PACRIM- II campaign on Jeju Island. Power transmission towers on piedmont pasture along the slopes of Mt. Halla look like elliptic risings in TOPSAR DEM. The heights of risings are quantitatively analyzed using a scattering model in the way of achieving the height of phase centers of power transmission towers. A numerical algorithm is developed on the basis of physical optics approximation. The structure of power transmission tower was decomposed into hundreds of rectangular metal plates, of which the scattering matrix is known in analytic form, and the calculated scattering fields were summed coherently. The effect of direct backscattering component, ground-scatterer component and scatterer-ground component are decomposed and computed individually for each rectangular metal plate. The $\Deltak-radar$ equivalent was used to calculate height of phase center of the scatterer. The heights of a selected power transmission tower and scattering algorithm results give existence and location of the transmission towers but not actual tower heights.

  • PDF

Congestion and Loss cost for economic subject using Optimal Power Flow (최적 조류 계산을 이용한 경제주체별 혼잡 및 손실비용 산정)

  • Seo, Chul-Soo;Yoon, Gi-Gab;Park, Sang-Ho;Choy, Young-Do;Lee, Jae-Gul;Son, Hyun-Il;Kim, Jin-O
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.430-431
    • /
    • 2011
  • Recently the power system consists of the more complicated structure, due to increase of power demands. In this circumstance, the congestion and loss capacity in transmission line is also increased. Accordingly, the investment planning of transmission system is required to reduce the congestion and loss of the transmission line. In study of the planning of domestic and international transmission expansion, the reliability of transmission planning and minimizing Investment cost is focused. However, the study has not been performed systematically in economic aspects. Typically, the congestion and loss costs have been individually calculated. It is not consider the mutual relationship between the congestion cost and the loss cost. This paper proposes a method to compute concurrently the congestion and loss costs. This purpose is to calculate the more exact value for economic assessment of the power system operation.

  • PDF

Maximization of Transmission System Loadability with Optimal FACTS Installation Strategy

  • Chang, Ya-Chin;Chang, Rung-Fang
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.5
    • /
    • pp.991-1001
    • /
    • 2013
  • Instead of building new substations or transmission lines, proper installation of flexible AC transmission systems (FACTS) devices can make the transmission networks accommodate more power transfers with less expansion cost. In this paper, the problem to maximize power system loadability by optimally installing two types of FACTS devices, namely static var compensator (SVC) and thyristor controlled series compensator (TCSC), is formulated as a mixed discrete-continuous nonlinear optimization problem (MDCP). To reduce the complexity of the problem, the locations suitable for SVC and TCSC installations are first investigated with tangent vector technique and real power flow performance index (PI) sensitivity factor and, with the specified locations for SVC and TCSC installations, a set of schemes is formed. For each scheme with the specific locations for SVC and TCSC installations, the MDCP is reduced to a continuous nonlinear optimization problem and the computing efficiency can be largely improved. Finally, to cope with the technical and economic concerns simultaneously, the scheme with the biggest utilization index value is recommended. The IEEE-14 bus system and a practical power system are used to validate the proposed method.

A Study on an Transmission Right Issuance Quantity Assessment Method by using Power Transfer Distribution Factor(PTDF) under FlowGate Right(FGR) (FlowGate Right(FGR) 도입 시 Power Transfer Distribution Factor(PTDF)를 이용한 송전권 계약용량 산정 방법 연구)

  • Baeck, Woong-Ki;Bang, Young-Sun;Chun, Yeong-Han;Kim, Jung-Hoon;Kwak, No-Hong;Lee, Baek-Seok
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.861-863
    • /
    • 2005
  • LMP based congestion management method is suggested as an effective tool, because network congestion can be handled by energy price. It is now being widely used in the North American Electricity Markets. Among them, FGR(Flow-gate rights) is considered to be appropriate for our system, as power flow through the congested line is unidirectional and congestion occurs in the known place. In the CBP market, hedging through transmission right is not necessary even though location pricing system is adopted, because there are no risks in the energy price. Rut, transmission rights should be adopted in the advanced market. Key issue when implementing FGR is how to decide transmission right issuance quantify. This paper deals with a method to decide transmission right issuance quantity by using power. Transfer Distribution Factor(PTDF).

  • PDF

Analysis of the optimum optical signal power and the longest transmission length in nonlinear optical transmission systems (비선형 광통신 시스템에서 최대 전송거리 및 최적 광신호 세기 도출에 관한 연구)

  • Kim, Sung-Man
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.7 no.3
    • /
    • pp.567-571
    • /
    • 2012
  • To design the long-haul optical communication system, we need to decide the type of optical fiber and optical amplifier, span length of optical amplifier, dispersion compensation method, optical signal power, etc. Therefore, we need to predict the performance of optical communication system when we change one of the system parameters. In this paper, we investigate the method of predicting the maximum transmission length of the designed optical communication system and finding the optimum optical signal power to obtain the maximum transmission length.

Effects of Reclosing for Insulation Coordination in 345kV Combined Transmission Lines (345kV 혼합송전선로에서 재폐로가 절연설계에 미치는 영향)

  • Lee, Jong-Beom;Jung, Chae-Kyun;Lim, Kwang-Sik;Kang, Ji-Won
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.59 no.5
    • /
    • pp.847-853
    • /
    • 2010
  • This paper describes switching surge analysis for reclosing decision in 345kV combined transmission line with XLPE power cable. Reclosing operation should be decided based on the detailed technical analysis in combined transmission line because this line includes power cable section which is week on insulation. Insulation of power cable can be breakdown at the week point in case of reclosing moment. Therefore the detailed analysis has to be carried out by considering several conditions such as length ratio of power cable section, arrestor, inserting resistance, charging rate, grounding resistance, etc.. On the other hand sheath voltage on IJ(Insulated Joint) is analyzed to check dangerous condition on cable cover. Analysis is performed by EMTP/ATP. Analysis results show that reclosing can be operated as the single line-to-ground fault occurs on overhead line in 345kV combined transmission line, if the inserting resistance is considered before the operation of main circuit breaker.