• 제목/요약/키워드: transmission pole

검색결과 135건 처리시간 0.025초

초고압 송전선로용 V련 현수애자장치의 개발 (A Development of V type Suspension String Set for UHV Transmission Lines)

  • 손흥관;이형권;금의연;민병욱;최진성;최인혁
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.497-499
    • /
    • 2004
  • Due to a typhoon named MAEMI on Sep12, 2004, 7 transmission towers collapsed and 3 were damaged in the Gyeongnam and Busan areas. These caused long-term black-outs in Goeje-do. When a transmission tower collapses or is damaged, Construction will take more than 2 months and this will be accompanied by long-term black-outs. Therefore a temporary iron pole is used in such emergencies. Current temporary rehabilitation angle steel iron Pole consistes of around 800 members, 2,800 bolts and it takes about 5 days to construct a temporary transmission line. Consiquently wide black-outs occur during the construction of the temporary transmission line. To reduce black-out time, the construction period must be reduced as much as possible. This paper presents new methods to reduce temporary transmission line construction time to within 48 hours by applying a self-reliance assembling method instead of the current man power assembling method and by modulizing each angle steel with duralumin.

  • PDF

송전선로 비상복구용 자주조립식 철주 개발 (Development of the Self-Build based Emergency Towers for Overhead Transmission Line)

  • 변강;민병욱;최진성;박재응;백수곤
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.494-496
    • /
    • 2004
  • Due to a typhoon named MAEMI on Sep12, 2004, 7 transmission towers collapsed and 3 were damaged in the Gyeongnam and Busan areas. These caused long-term black-outs in Goeje-do. When a transmission tower collapses or is damaged, Construction will take more than 2 months and this will be accompanied by long-term black-outs. Therefore a temporary iron pole is used in such emergencies. Current temporary rehabilitation angle steel iron Pole consistes of around 800 members, 2,800 bolts and it takes about 5 days to construct a temporary transmission line. Consiquently wide black-outs occur during the construction of the temporary transmission line. To reduce black-out time, the construction period must be reduced as much as possible. This paper presents new methods to reduce temporary transmission line construction time to within 48 hours by applying a self-reliance assembling method instead of the current man power assembling method and by modulizing each angle steel with duralumin.

  • PDF

절점 해석 기법을 이용한 탄성지지 장비 시스템의 고체음 전달 해석 (Structureborne Noise Transfer Analysis Using Pole Parameter Method for Resiliently Mounted Equipment)

  • 최태묵;김태석;조대승;정정훈
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2005년도 춘계학술대회논문집
    • /
    • pp.398-402
    • /
    • 2005
  • Structureborne noise induced by shipboard equipment is one of the most significant noise source of ships and can be effectively reduced by resiliently mounting them. In this paper, the pole parameter method is investigated for estimating the structureborne noise reduction of resiliently mounted equipment. In addition, we suggest how to evaluate pole parameters from dimensional and material information of each component consisting of resiliently mounted equipment. To validate and discuss the proposed method numerical analysis for single and double resiliently mounted equipment systems using both pole parameter method and FEM have been done.

  • PDF

결함 접지 구조를 이용한 새로운 5-단 저역 통과 여파기 (A New Type of 5-Pole Low Pass Filter Using Defected Ground Structure)

  • 임종식;김철수;안달;정용채;남상욱;김광수
    • 한국전자파학회논문지
    • /
    • 제16권6호
    • /
    • pp.594-602
    • /
    • 2005
  • 본 논문에서는 결함 접지 구조(Defected Ground Structure, DGS)를 이용하여 설계한, 전송 선로의 폭이 매우 넓어진 새로운 형태의 5-단 저역 통과 여파기(5-pole Low Pass Filters, LPF)를 제시한다. 이를 위하여 종래에 제시 되었던 3-단 DGS LPF설계 방법을 임의의 N-단 LPF설계에도 적용할 수 있도록 일반화 시키고$(N\geq5)$, 한 예로써 5-단 LPF를 설계 및 측정 결과가 제시된다. LPF원형 회로로부터 필요한 소자값들을 갖는 서로 다른 크기의 DGS를 결정하기 위하여, 매우 정확한 인덕턴스 값을 예측해 주는 곡선 맞춤(curve-fitting) 방법도 제시되었다. 제안하는 5-단 LPF는 병렬 캐패시턴스 구현을 위해 개방 스터브 대신 선폭이 크게 보상된 낮은 임피던스의 전송 선로를 갖는다. 따라서 개방 스터브를 사용할 때 필수적으로 요구되는 T-나 Cross-불연속 접합 소자가 없고, 또한 기존의 LPF에서 직렬 인덕턴스 때문에 필요했던 높은 임피던스 전송 선로가 없다.

Optimal Design of Ferromagnetic Pole Pieces for Transmission Torque Ripple Reduction in a Magnetic-Geared Machine

  • Kim, Sung-Jin;Park, Eui-Jong;Kim, Yong-Jae
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권6호
    • /
    • pp.1628-1633
    • /
    • 2016
  • This paper derives an effective shape of the ferromagnetic pole pieces (low-speed rotor) for the reduction of transmission torque ripple in a magnetic-geared machine based on a Box-Behnken design (BBD). In particular, using a non-linear finite element method (FEM) based on 2-D numerical analysis, we conduct a numerical investigation and analysis between independent variables (selected by the BBD) and reaction variables. In addition, we derive a regression equation for reaction variables according to the independent variables by using multiple regression analysis and analysis of variance (ANOVA). We assess the validity of the optimized design by comparing characteristics of the optimized model derived from a response surface analysis and an initial model.

건식진공펌프의 배기 소음 저감 (Exhaust Noise Reduction of Dry vacuum Pump)

  • 안영찬;이해진;이정윤;양정직;오재응
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2007년도 춘계학술대회논문집
    • /
    • pp.349-354
    • /
    • 2007
  • This paper considers acoustic analysis of silencer within a Dry vacuum pump. Main object is noise reduction of Dry Vacuum Pump using the silencer. First, we measured SPL and Intensity for noise source identification and then, designed for the silencer corresponding with noise character. 4-pole parameter are used for predicting transmission loss which is one of characteristics of silencer when we designed for silencer. Calculated Transmission Loss to change main effective factor and selected to optimal value using Design of Experiment. Finally, noise reduction is estimated to compare existing silencer with optimal silencer.

  • PDF

건식 진공 펌프의 배기 소음 저감 (Exhaust Noise Reduction of Dry Vacuum Pump)

  • 안영찬;이해진;박상길;이유엽;오재응
    • 한국소음진동공학회논문집
    • /
    • 제17권10호
    • /
    • pp.950-957
    • /
    • 2007
  • This paper considers acoustic characteristics of silencer within a dry vacuum pump. The main objective is to reduce noise in dry vacuum pump using the new designed silencer. First, SPL and sound intensity are measured for noise source identification and the new model silencer is designed corresponding to noise characteristics. 4-pole parameters are used to predict the transmission loss which is one of the interest characteristics of the new silencer. The calculated transmission loss is then used to change main effective factor and optimal value is selected by using design of experiment. By conducting an experiment, it is proved that the new designed silencer has reduced noise level by 6 dB(A) more than the original one.

HVDC ${\pm}500kV$ 가공 송전선로의 최적 도체방식 선정을 위한 전기환경특성 평가 (Assessment of the Electrical Environmental Characteristics to Decide Optimal Bundle Type for HVDC ${\pm}500kV$ Overhead Transmission Lines)

  • 주윤노;길경석;양광호;이성두;황기현
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제55권11호
    • /
    • pp.520-526
    • /
    • 2006
  • Corona interferences, such as radio noise, audible noise and television noise, need to be taken into account in the design of HVDC transmission line conductor configuration. Therefore the line designer requires data from which to estimate the corona performance of any set of conductors. To get a sufficiently complete set of design data, it is necessary to examine the corona test of a large number of conductor geometries. This paper presents the results of corona cage test among three types of candidate conductors. It is quite clear from test results that the conductor geometries play an important role in establishing the magnitude of corona noise. Corona noise data from corona cage test are expressed as a statistical distribution of results obtained over long periods of time and various weather conditions. Therefore we can determine an environmentally-friendly conductor bundle for HVDC overhead transmission line. Based on this finding results, various simulations about HVDC line configurations, such as pole space and pole height, will be conducted. And then finally an optimal configuration for HVDC transmission line will be decided.

Free vibration analysis of tapered FRP transmission poles with flexible joint by finite element method

  • Saboori, Behnam;Khalili, Seyed Mohammad Reza
    • Structural Engineering and Mechanics
    • /
    • 제42권3호
    • /
    • pp.409-424
    • /
    • 2012
  • Since relatively low elasticity modulus of the FRP materials results in lower natural frequencies, it is necessary to study the free vibration of FRP transmission poles. In this paper, the free vibration of tapered FRP transmission poles with thin-walled circular cross-section is investigated by a tapered beam element. To model the flexible joints of the modular poles, a rotational spring model is used. Modal analysis is performed for typical FRP poles with/without joint and they are also modeled by ANSYS commercial finite element software. There is a good correlation between the results of the tapered beam finite element model and those obtained from ANSYS as well as the existing experimental results. The effects of different geometries, material lay-ups, concentrated masses at the pole tip, and joint flexibilities are evaluated. Moreover, it is concluded that using tougher fibres at the inner and outer layers of the cross-section, results in higher natural frequencies, significantly.

실증시험을 통한 강관주기초의 거동특성 (Behavior of Single Pole Foundation using Experimental Study)

  • 김대홍;오기대
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.598-604
    • /
    • 2010
  • The drilled pier foundation is widely used to support transmission line structures due to its simplicity of construction. When this foundation type is used in conjunction with a single shaft or H-frame structure, it is subjected to a high overturning moment, combined with modest vertical and shear loads. Since the length and diameter of drilled piers are often governed by a maximum permissible deflection, many drilled piers being installed today are very conservatively designed. In this study, Nine prototype field-tests (1/8 scale) have been conducted in order to determine the vertical and lateral resistance of drilled pier foundation for single pole structures. These test results reveal the test piers behaved essentially as rigid bodies in soil (6D) and the center of rotation of the pier were typically 0.6~0.4 of the pier depth below ground surface. Test results also show the relationship between the applied load and the deflection at the top of the pier is highly nonlinear.

  • PDF