• Title/Summary/Keyword: transfer orbit

Search Result 154, Processing Time 0.025 seconds

Geostationary Satellite Launch and Early Operations (정지궤도위성 발사 및 발사후 초기운용)

  • Han, Cho-Young;Chae, Jong-Won;Kim, Su-Kyum;Won, Su-Hee
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.66-68
    • /
    • 2011
  • Chollian is a geostationary satellite, and its bipropellant propulsion system is mainly composed of one main engine for orbit transfer and fourteen thrusters for on-station operations. The Chollian was launched successfully at Kourou Space Center in French Guiana. After it separated from the launcher, the propulsion system was initialised automatically. Then three times of main engine firing were successfully performed, and the target obit insertion was accomplished. This paper details the major CPS events during LEOP phase for the Chollian satellite.

  • PDF

Successive Backward Sweep Method for Orbit Transfer Augmented with Homotopy Algorithm (호모토피 알고리즘을 이용한 Successive Backward Sweep 최적제어 알고리즘 설계 및 궤도전이 문제에의 적용)

  • Cho, Donghyurn;Kim, Seung Pil
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.44 no.7
    • /
    • pp.620-628
    • /
    • 2016
  • The homotopy algorithm provides a robust method for determining optimal control, in some cases the global minimum solution, as a continuation parameter is varied gradually to regulate the contributions of the nonlinear terms. In this paper, the Successive Backward Sweep (SBS) method, which is insensitive to initial guess, augmented with a homotopy algorithm is suggested. This approach is effective for highly nonlinear problems such as low-thrust trajectory optimization. Often, these highly nonlinear problems have multiple local minima. In this case, the SBS-homotopy method enables one to steadily seek a global minimum.

Simultaneous imaging and radiometric performance simulation for computer generated GOCI optical system with measured characteristics

  • Jeong, Soo-Min;Jeong, Yu-Kyeong;Ryu, Dong-Ok;Yoo, Jin-Hee;Kim, Seong-Hui;Cho, Seong-Ick;Ham, Sun-Jeong;Youn, Heong-Sik;Woo, Sun-Hee;Kim, Sug-Whan
    • Bulletin of the Korean Space Science Society
    • /
    • 2008.10a
    • /
    • pp.27.3-28
    • /
    • 2008
  • In this study, we report a new Monte Carlo ray tracing technique for estimating GOCI (Geostationary Ocean Color Instrument) radiative transfer characteristics and imaging performance simultaneously. First, a full scale GOCI optical model was constructed with measured characteristics at the component level and placed in the geostationary orbit. An optical model of approximated GOCI target area centered at the Korean penninsular was then built using the USGS coastal line data and representative land and sea surface reflectivity data. The light rays launched from a simulated sun model travel to the Earth surface, where they are reflected and scattered. Some of the light rays that are headed to the GOCI model in the orbit were selected and traced, as they have entered into the GOCI aperture. As they pass through each GOCI optical part, the ray path and intensity are adjusted according to the measured characteristics for reflection, transmission, refractive index and surface scattering. The ray-traced imaging and radiative transfer performance indicators confirm that the computer generated GOCI optical system with measured characteristics can be used for in-orbit operation simulation following the designed measurement sequence. The computational technique and its implications as a operation support tool are discussed.

  • PDF

TC & R Communication Link Performance Analysis of Geostationary Satellite Employing PCM/PSK/PM on Super Synchronous Transfer Orbit (PCM/PSK/PM 방식을 사용하는 정지궤도 위성의 슈퍼 천이 궤도에서 S-Band TC & R 통신 링크 성능 분석)

  • Lee, Sun-Ik;Yeom, Kyung-Whan
    • The Journal of Korean Institute of Electromagnetic Engineering and Science
    • /
    • v.25 no.11
    • /
    • pp.1142-1155
    • /
    • 2014
  • The classical PCM/PSK/PM scheme has been commonly used for TC & R applications between satellites and ground stations in the S-band. We analyzed TC & R link performance between ground station and the geostationary satellite which employs PCM/PSK/PM, when the satellite are particularly on the Super Synchronous Transfer Orbit(SSTO). The satellite parameters on SSTO are assumed to be those operating on the geostationary orbit, considering heritage aspect. In the uplink, the results shown indicate that sufficient margins over 3 dB are obtained when the EIRP of ground station is greater than 65 dBW. The down link performance is of great interest. By adjusting the telemetry modulation index and ranging modulation index, we could obtain the required margin of 3.0 dB in the down link, and find out the minimum G/T of ground station. In conclusion, the previously operated ground stations during LEOP at COMS launch, can be operational when GEO injection is made using SSTO(65,000 km and 70,000 km).

Korea Pathfinder Lunar Orbiter (KPLO) Operation: From Design to Initial Results

  • Moon-Jin Jeon;Young-Ho Cho;Eunhyeuk Kim;Dong-Gyu Kim;Young-Joo Song;SeungBum Hong;Jonghee Bae;Jun Bang;Jo Ryeong Yim;Dae-Kwan Kim
    • Journal of Astronomy and Space Sciences
    • /
    • v.41 no.1
    • /
    • pp.43-60
    • /
    • 2024
  • Korea Pathfinder Lunar Orbiter (KPLO) is South Korea's first space exploration mission, developed by the Korea Aerospace Research Institute. It aims to develop technologies for lunar exploration, explore lunar science, and test new technologies. KPLO was launched on August 5, 2022, by a Falcon-9 launch vehicle from cape canaveral space force station (CCSFS) in the United States and placed on a ballistic lunar transfer (BLT) trajectory. A total of four trajectory correction maneuvers were performed during the approximately 4.5-month trans-lunar cruise phase to reach the Moon. Starting with the first lunar orbit insertion (LOI) maneuver on December 16, the spacecraft performed a total of three maneuvers before arriving at the lunar mission orbit, at an altitude of 100 kilometers, on December 27, 2022. After entering lunar orbit, the commissioning phase validated the operation of the mission mode, in which the payload is oriented toward the center of the Moon. After completing about one month of commissioning, normal mission operations began, and each payload successfully performed its planned mission. All of the spacecraft operations that KPLO performs from launch to normal operations were designed through the system operations design process. This includes operations that are automatically initiated post-separation from the launch vehicle, as well as those in lunar transfer orbit and lunar mission orbit. Key operational procedures such as the spacecraft's initial checkout, trajectory correction maneuvers, LOI, and commissioning were developed during the early operation preparation phase. These procedures were executed effectively during both the early and normal operation phases. The successful execution of these operations confirms the robust verification of the system operation.

A Study on Earth-Moon Transfer Orbit Design

  • No, Tae-Soo;Lee, Ji-Marn;Jeon, Gyeong-Eon;Lee, Dae-Ro;Kim, Ghang-Ho
    • International Journal of Aeronautical and Space Sciences
    • /
    • v.13 no.1
    • /
    • pp.106-116
    • /
    • 2012
  • Optimal transfer trajectories based on the planar circular restricted three body problem are designed by using mixed impulsive and continuous thrust. Continuous and dynamic trajectory optimization is reformulated in the form of discrete optimization problem. This is done by the method of direct transcription and collocation. It is then solved by using nonlinear programming software. Two very different transfer trajectories can be obtained by the different combinations of the design parameters. Furthermore, it was found out that all designed trajectories permit a ballistic capture by the Moon's gravity. Finally, the required thrust profiles are presented and they are analyzed in detail.

A Study of Attitude Determination Techniques for Satellite (위성체의 자세결정기법에 관한 연구)

  • Cho, K.R.;Suh, D.H.
    • Journal of Advanced Navigation Technology
    • /
    • v.2 no.2
    • /
    • pp.100-106
    • /
    • 1998
  • The cone intercept method (CIM) is generally used for attitude determination of a spin-stabilized satellite. The method is popularly used on a transfer orbit, but it is well known that it can also be used for the geosychronous orbit. In this paper, the CIM is applied to the geosynchronous orbit and its performance and limitations will be investigated from the results. The CIM impliments two sensors (Sun and Earth sensors). The Sun sensor finds the angle between the spin-axis and the direction vector to the Sun and the Earth sensor does the angle between the spin-axis and the direction vector to the Earth. By using these two cone angles, the CIM gives the direction of the spin-axis of the satellite.

  • PDF

다목적실용위성 2호 추진시스템 비행모델 개발

  • Lee, Kyun-Ho;Han, Cho-Young;Yu, Myoung-Jong;Choi, Joon-Min
    • Aerospace Engineering and Technology
    • /
    • v.3 no.1
    • /
    • pp.97-102
    • /
    • 2004
  • Propulsion System provides the required velocity change impulse for orbit transfer from parking orbit to mission orbit and three-axis vehicle attitude control impulse. KOMPSAT-2 propulsion system(PS) is an all-welded, monopropellant hydrazine system. The PS consists of the subassemblies and components such as Thrusters, Propellant Tank, Pressure Transducer, Propellant Filter, Latching Isolation Valves, Fill/Drain Valves, interconnecting propellant line assembly, and thermal hardwares for operation-environment control of the PS. This paper summarizes a development process of the liquid propulsion system from the design engineering up to the test and evaluation.

  • PDF

In-orbit Stray light Performance Simulation for Geostationary Ocean Color Imagers

  • Jeong, Yu-Kyeong;Jeong, Soo-Min;Ryu, Dong-Ok;Kim, Sug-Whan;Hong, Jin-Suk;Youn, Heong-Sik;Woo, Sun-Hee;Kim, Seong-Hui
    • Bulletin of the Korean Space Science Society
    • /
    • 2009.10a
    • /
    • pp.49.4-50
    • /
    • 2009
  • We report stray light modeling and analysis results for the current and proposed next generation ocean color imagers with Sun and the target area around Korean penninsular as viewed from geostationary orbit. The imagers used in this study are GOCI of 140mm in diameter and a proposed next generation GOCI (GOCI-II) of about 300mm in diameter. First, we built complete GOCI and GOCI-II 3D optical system models with the realistic surface characteristics. These optical models were incorporated into the in-house built Intergrated Ray Tracing (IRT) algorithm, connecting the Sun, the measurement target area and the instruments via single ray tracing computation for radiative transfer and scattering. The stray light level was then estimated for possible orbital configurations for science measurement and in-orbit calibration operation. The simulation details, results and their implications are presented.

  • PDF

위성 추진시스템의 추력제어밸브 작동에 따른 추진제 비정상 유동 특성

  • Kim, Jeong-Soo;Han, Cho-Young;Lee, Kyun-Ho
    • Aerospace Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.51-56
    • /
    • 2002
  • Satellite propulsion system is employed for orbit transfer, orbit correction, and attitude control. The monopropellant feeding system in the low-earth-orbit satellite blowdowns fuel to the thrust chamber. The thrust produced by the thruster depends on fuel amount flowed into the combustion chamber. If the thruster valve be given on-off signal from on-board commander in the satellite, valve will be opened or closed. When the thrusters fire fuel flows through opened thruster valve, instantaneous stoppage of flow in according to valve actuation produces transient pressure due to pressure wave. This paper describes transient pressure predictions of the KOMPSAT-2 propulsion system resulting from latching valve and thrust control valve operations. The time-dependent set of the fluid mass and momentum equations are calculated by MOC.

  • PDF