• Title/Summary/Keyword: transfer facilities

Search Result 429, Processing Time 0.037 seconds

The Service Evaluation of Connection and Transfer Facilities in the High-speed Railway Stations (고속철도역의 연계환승시설 서비스 수준 평가)

  • Han, Sung-Yoeb;Kim, Kang-Seob;Park, Min-Kyu;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.761-772
    • /
    • 2009
  • The introduction of KTX (Korea Train eXpress) provided passengers with a much faster mode of transport, and KTX has become a model railway system. Express railway stations are emphasized as public transit transfer centers, but their service evaluations were not performed appropriately so far. It is possible to know the level of service by developing valuation criteria for their evaluations. The evaluation of transfer centers mainly consists of two parts; connective service with other travel m odes, and transfer service inside transfer stations. Connection is defined as the inter-connection of multi-transportation vehicles, and transfer means that a passenger changes his travel mode to another. Such connective service and transfer service are evaluated by the level of service in terms of transfer facilities, the appropriateness of station layout and the quality of information throughout the facilities. We developed the service evaluation indicators of connective facilities and referred to the indicators of transfer facilities. We examined the 7 stations in Korea that are currently in operation and standardized the methodology of the evaluation process by applying the indicators suggested in this study.

  • PDF

A Study on Demand calculation for facility design of Complex Transfer Center (복합환승센터의 시설설계를 위한 수요산정에 관한 연구)

  • Kim, Yeon-Woong;Jo, Chang-Hee;Kim, Si-Gon
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.722-729
    • /
    • 2010
  • Deciding peak-time demand will be most important factor to decide facilities' capacity of complex transfer centers. Concentration of demand is growing more and more in urban railroad that has 3 minutes headway by using MOE of 15 minutes demand. It is far from reality. Moreover there are various demand and reflection of business facilities' demand and commerce facilities' demand is being requested in complex transfer centers. This study focused on it and suggested demand calculation method about facility design of complex transfer centers.

  • PDF

Assessment of Transfer Center by Facility Design Analysis (설계분석 프로그램을 이용한 환승센터 내부 및 외부 시설물 평가)

  • Lee, Jeong-Yeop;Han, Dong-Hui;Lee, Ju-Yeong;Lee, Yeong-In
    • Journal of Korean Society of Transportation
    • /
    • v.27 no.5
    • /
    • pp.169-177
    • /
    • 2009
  • Establishing a public transportation transfer system that can reduce personal automobile use in the CBD and absorb the demand, thereby reducing congestion, is a necessity. However, the current transfer system and facilities are lacking in intermodal connectivity, require long transfer times, have complex flow patterns, and are lacking in information systems and convenience. The design analysis program of this study is to develop a program that executes computations of design analysis of transfer facilities by utilizing the existing design standards for facilities such as facilities for boarding and alighting, elements for convenience, and pedestrian facilities. Developing an analytical tool through which individual or integrated design analysis can be conducted on the design standards of various facilities is an important study for improving the work accuracy and efficiency of designing an actual transfer center.

Patterns on Sewer Transfer Flow for Rain Weather Period in the Area with Combined Sewer System for the Management of TMDLs (수질오염총량관리 합류식지역의 우기시 관거이송 변화유형)

  • Park, Jun Dae;Oh, Seung Young;Kim, Ji-Tae
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.6
    • /
    • pp.1008-1015
    • /
    • 2010
  • Discharged pollution load is varied as rainfall changes in the area with combined sewer system. Changes in discharged pollution load are directly related with those of sewer transfer flow. Therefore, it is important to identify the pattern of sewer transfer flow for the analysis of changes in discharged pollution load. This study reviewed the type of distribution of sewer transfer flow for 17 sewage treatment plants and developed simple formular to estimate sewer transfer flow as rainfall changes. 11 facilities showed to have some relation with rainfall in the change of sewer transfer flow but 6 facilities to have no relation. Relationships between rainfall amount and sewer transfer flow showed that 6 facilities out of 11 had relatively strong relationships above R2=0.5, which were considered to be affected directly by rainfall changes. The formular which explain the relationship between rainfall and sewer transfer flow can be applied in the analysis of rainfall effects on discharged pollution load, therefore, the more appropriate evaluation will be done.

Two-Level Hierarchical Production Planning for a Semiconductor Probing Facility (반도체 프로브 공정에서의 2단계 계층적 생산 계획 방법 연구)

  • Bang, June-Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.159-167
    • /
    • 2015
  • We consider a wafer lot transfer/release planning problem from semiconductor wafer fabrication facilities to probing facilities with the objective of minimizing the deviation of workload and total tardiness of customers' orders. Due to the complexity of the considered problem, we propose a two-level hierarchical production planning method for the lot transfer problem between two parallel facilities to obtain an executable production plan and schedule. In the higher level, the solution for the reduced mathematical model with Lagrangian relaxation method can be regarded as a coarse good lot transfer/release plan with daily time bucket, and discrete-event simulation is performed to obtain detailed lot processing schedules at the machines with a priority-rule-based scheduling method and the lot transfer/release plan is evaluated in the lower level. To evaluate the performance of the suggested planning method, we provide computational tests on the problems obtained from a set of real data and additional test scenarios in which the several levels of variations are added in the customers' demands. Results of computational tests showed that the proposed lot transfer/planning architecture generates executable plans within acceptable computational time in the real factories and the total tardiness of orders can be reduced more effectively by using more sophisticated lot transfer methods, such as considering the due date and ready times of lots associated the same order with the mathematical formulation. The proposed method may be implemented for the problem of job assignment in back-end process such as the assignment of chips to be tested from assembly facilities to final test facilities. Also, the proposed method can be improved by considering the sequence dependent setup in the probing facilities.

Assessment of the New Capacity and LOS of Transfer Facilities in the High-speed Railway Stations (고속철도역 환승시설 용량 및 서비스수준 산정 방안)

  • Kim, Jong-Hae;Kim, Si-Gon;Lee, Kyung-No
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1374-1384
    • /
    • 2008
  • The Design manual for adjusting the capacity and LOS of facilities has been shared in urban railways and high-speed railway stations. However, the pattern of urban railways users and those of high-speed railway users are different from each other. For an example, the high-speed railway users tend to carry voluminous luggages and the transportation disadvantaged such as children and the elderlies. Accordingly, we see that the scale of facilities and the station itself should be constructed differently. The transfer facilities in the high-speed railway stations are classified widely into walking assisting facilities and convenient facilities. We invented the concept of PME(Pedestrian Moving Equivalent) and PWE(Pedestrian Waiting Equivalent)for the spatial calculation of those who are with wheeled luggages, back packs, and children to reflect the uniqueness of users in high-speed railway stations. These equivalents have been applied to the design of the facilities to asses the new Capacity and LOS that are users' favored.

  • PDF

Programs for Higher Efficiency of Private Sector Investment in Educational Facilities -With Focus on Combining of Public Service Facilities- (학교시설 민자 사업의 효율화 방안 -공공서비스 시설의 복합화 중심으로-)

  • Kang, Hyun-bin;Lee, Jae-Lim
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.8 no.1
    • /
    • pp.11-22
    • /
    • 2009
  • School is a basic and the most fundamental facility of city planning just like other basic public facilities including the village office. Every plan is established on the basis of school. However, the problems such as the population reduction resulting from the nuclear family-zation and low birth rate, employment and welfare of the aged people resulting from "the old aged society", and the infant nursing and education resulting from a rapid increase of the working couples become notable and accordingly more requirements are being made. Reflecting this trend, the concept and operation system should be changed. Up to now, the BTL projects of the educational facilities are gaining a reputation of being efficient in terms of national budget running, but at the same time receiving negative reputation in terms of budget saving under the civil creativity and efficiency. Through upgrading the private sector investment projects into the BTO+BTL system and further into the BTO(Build Transfer Operate), we can accomplish the original goals of the private sector investment projects, and can make the education budget operation more efficient, and can greatly improve the education environments. However, we should not underestimate in this process that these facilities should not negatively affect the education environments. In any situation, the owners of schools are students.

  • PDF

Estimating Internal Transfer Trips Considering Subway Express Line - Focusing on Smart Card Data Based Network - (지하철 급행노선을 고려한 내부환승 추정방안 - 스마트카드 자료기반 네트워크를 중심으로 -)

  • Lee, Mee Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.613-621
    • /
    • 2019
  • In general, transfer in subway stations is defined as transfer between lines and station transfer. In transfer between lines, passengers change from one subway line to another by utilizing horizontal pedestrian facilities such as transfer passages and pedestrian way. Station transfer appears in the situation that subway lines of enter and exit gate terminals differs from those of boarding and alighting trains and passenger trips utilize both vertical pedestrian facilities such as stair and escalator and horizontal facilities. The hypothesis on these two transfers presupposes that all subway lines are operated by either local train or express in subway network. This means that in a transfer case both local and express trains are operated in the same subway line, as a case of Seoul Metro Line 9, has not been studied. This research proposes a methodology of finding the same line transfer in the Seoul metropolitan subway network built based on the smart card network data by suggesting expanded network concept and a model that passengers choose a theirs minimum time routes.

The Development and Application of the Service Evaluation Indicators of Transfer Facilities in the High-speed Railway Stations (고속철도역 환승시설 서비스 평가지표 개발 및 적용)

  • Kim, Cheol-Sun;Kim, Si-Gon;Kim, Jung-Hwan
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1385-1395
    • /
    • 2008
  • The introduction of KTX(Korea Train Express) has brought an historic change to the overall transit system in Korea. Especially, the high-speed railway stations are expanding the scope as public transit centers. However, we cannot deny that the evaluation on the high-speed railway stations had not been performed successfully so far. The evaluation covers from the connectivity of the scope from door to the stations and the transfer service in the interior of stations. We developed the service evaluation indicators of transfer facilities in the high-speed railway stations. The indicators consist of level of service(LOS), the propriety of allocation, and the quality of information throughout the facilities in the centers. We examined the 7 stations in Korea and standardized the methodology of the evaluation process by applying the indicators. Also, the evaluation is performed easy for anyone to follow.

  • PDF