Analysis of Operational Status and Effectiveness of Single-Track Accredited Program in ABEEK (공학교육인증의 단일인증프로그램 운영실태 및 효과분석)

  • Han, Jiyoung
    • Journal of Engineering Education Research
    • /
    • v.23 no.4
    • /
    • pp.66-75
    • /
    • 2020
  • This study was conducted using the literature review and survey research to analyze the operational status and effectiveness of the single-track accredited program, which has been mandatory since 2016. The research targets to achieve the purpose of the study were the nationwide engineering education accreditation system operating colleges, departments, and engineering education innovation centers. Finally, 183 copies were collected from faculty members at 69 colleges and 554 copies at the department level. As a result of the survey, the college recognized more positively about the operation of the single-track accredited program, and more than 50% of respondents said that there were difficulties due to the operation of the system. The contents required were analyzed and presented. Based on this, the engineering education accreditation system, including the single-track accredited program, suggested the direction of support at the government level and the ABEEK level to better settle down in the field of engineering colleges.

Route Analysis Algorithm using Fuzzy Reasoning in Route Planning (항로 계획시의 퍼지 항로분석 알고리즘)

  • 구자윤
    • Journal of the Korean Institute of Navigation
    • /
    • v.20 no.3
    • /
    • pp.65-71
    • /
    • 1996
  • Recently, the Track Control System which was separated from the Course Control System so-called Auto-Pilot has been developed for track-keeping in coastal area. From this year, the NAV Sub-committee in IMO commenced to consider the Performance Standard for the Track Control System vigorously. This system will be integrated with ECDIS and IBS so that captain/officers should analysis ship's motion characteristics accurately in the route planning using the electronic nautical charts. In this paper, a new Route Analysis Algorithm using fuzzy reasoning in route planning was proposed for 2, 700 TEU container ship. In order to verify the track-keeping, the author established a ship mathematical model and executed the simulation of the Route Analysis Algorithm at on-line condition with Pentium PC. The results of ship trajectories of the Route Analysis Algorithm were found to be effective to get track control automatically.

  • PDF

Requirement of Track Maintenance Plan Support System (궤도유지보수작업계획수립지원 시스템의 요구조건)

  • Lee Jee-Ha;Hwang Sung-Ho;Park Ok-Jung
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.886-891
    • /
    • 2004
  • The process of determining whether, when, where and how to intervene, of deciding on optimum allocation of resources and minimizing the cost is a very complex problem: different track sections tend to behave differently under the effects of loading; decision-making processes for maintenance work are closely interrelated technically and economically; decision-making for maintenance plans is based on a large quantity of technical and economic information, extensive knowledge and above all experience. For that reason, It is considered very important to develope objective and computer-aided decision-making support system for track maintenance plan. On this paper, we made a survey of the state-of-art of decision-making support systems for track maintenance which were developed and used abroad and reviewed requirements of system and present the plan of develope decision-making support system for track maintenance appropriate to local condition.

  • PDF

Precast concrete slab track - state of the art (프리캐스트 콘크리트 슬래브궤도 기술현황)

  • Jang Seung Yup;Yang Sin Chu;Kim Jeong Il;Kim Tae Wook
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.104-110
    • /
    • 2003
  • Precast concrete slab track has been already turned out to be more efficient than cast-in place concrete slab track in view of the easiness of construction and the quality control of concrete. Thus, there is a great need to bring in the precast slab track system. In order to develop the realistic precast slab track system that is well conformed to our circumstances, the performance criteria of slab track, and the state-of-the art of precast slab track systems that are used in other countries are briefly discussed here.

  • PDF

Evaluation on the condition and quality of railway track substructure (궤도노반의 상태 및 품질평가에 관한 연구)

  • Kim, Dae-Sang;Park, Tae-Soon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.346-353
    • /
    • 2005
  • Track substructure(ballast, subgrade) should have sufficient strength and adequate stiffness to fully support track superstructure(rail, fastener, sleeper). Vertical support stiffness of track comes from the sufficient thickness, adequate strength and stiffness of material of substructure layers. Since the vertical support stiffness of track substructure is closely related with the track geometry, the evaluation of the stiffness is very important to understand the track states. This paper introduces the system, which are composed of Ground Penetrating Radar(GPR), Portable Ballast Sampler(PBS), and Light Falling Weight Deflectometer(LFWD), to evaluate substructure condition and summarizes the field test results performed with the reliable system.

  • PDF

Simulation Tool Development for Dynamic Tracked Tensioning System in Tracked Vehicles (궤도차량의 동적 궤도장력 조절시스템을 위한 시뮬레이션 툴 구축)

  • 김일민;김민철;임훈기;허건수
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2002.04a
    • /
    • pp.76-81
    • /
    • 2002
  • The characteristics of the track are important concerning the mobility of tracked vehicles. It can be represented in terms of the track tension and maintaining the track tension adequately guarantees the stable and improved driving of the tracked vehicles. The track tension must be known in order to be controlled and it needs to be estimated in real-time because it is difficult to be measured. The tension around idler and sprocket can be controlled by the frizzy logic control system base on the estimated values. Dynamic Track Tensioning System(DTTS) which is estimating and controlling the track tension. In this paper, simulation tool is developed in order to apply the DTTS to real battle tanks. To construct the simulation tool, the Modeling the tracked vehicle, constructing estimation system, and designing controller should be achieved first and then all subsystem should be organized in one. The simulation tool make the RecurDyn model of tracked vehicle, which is plant model, and the control system exchange their data simultaneously. Simulation with many kinds of driving conditions and road conditions is carried out and the results are interpreted. The interpretation provides necessary information to apply the DTTS to real battle tanks.

  • PDF

A Study on Real Time Catenary Impedance Estimation Technique using the Synchronized Measuring Data between Substation and Train (변전소와 차량간의 동기화를 통한 실시간 전차선로 임피던스 예측 기법 연구)

  • Jung, Hosung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.62 no.10
    • /
    • pp.1458-1464
    • /
    • 2013
  • This paper proposed a new real time catenary impedance estimation technique using synchronized power data from the measured data of operating vehicle and substation for catenary protective relay and fault locator setting. This paper presented estimation equation of catenary impedance using synchronized power data between substation and vehicle of AT feeding system for the performance verification of the proposed technique. Also AC feeding system is modeled through power analysis program and performance was verified through simulation according to various load changes. We verified that average 2.38%(distance equivalent 23.8 m) error appeared between the proposed estimation equation of catenary impedance and power analysis program simulation output in no connection double track system between up track and down track. Furthermore, We confirmed that estimation error is bigger depending on the increasing the distance from substation and vehicle impedance using only using vehicle current when calculating vehicle impedance in connection double track system between up track and down track. But, We confirmed that the proposed technique estimated accurately catenary impedance regardless of vehicle impedance and distance from substation.

Pressure Monitoring System in Gastro-Intestinal Track (소화기관내의 압력 모니터링 시스템)

  • 김용인;박석호;김병규;박종오
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.10 no.11
    • /
    • pp.1089-1094
    • /
    • 2004
  • Diseases in the gastro-intestinal track are on an increasing trend. In order to diagnose a patient, the various signals of the digestive organ, such as temperature, pH, and pressure, can offer the helpful information. Among the above mentioned signals, we choose the pressure variation as a monitoring signal. The variation of a pressure signal of the gastro-intestinal track can offer the information of a digestive trouble or some clues of the diseases. In this paper, a pressure monitoring system for the digestive organs of a living pig is presented. This system concept is to transmit the measured biomedical signals from a transmitter in a living pig to wireless receiver that is positioned out of body. The integrated solution includes the following parts: (1) the swallow type pressure capsule, (2) the receiving set consisting of a receiver, decoder box, and PC. The merit of the proposed system if that the monitoring system can supply the precise and repeatable pressure in the gastro-intestinal track. In addition, the design of low power consumption enables it to keep sending reliable signals while the pressure capsule is working in the digestive organ. The subject of the study for the pressure monitoring system is in-vivo experiments for a living pig. We achieved the pressure tracings in digestive organs and verified the validity of system after several in-vivo tests using pressure monitoring system. As a result, we found each organ has its own characterized pressure fluctuation.

Study on Design of Rail Level Crossing System for Preventing from Non-Alarming Status Caused by Track Shunting Sensibility Errors (레일 단락감도 불량으로 발생하는 무경보 예방을 위한 건널목보안장치 설계)

  • Jang, Dong-Wan;Jeon, Tae-Hyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.1
    • /
    • pp.160-166
    • /
    • 2010
  • Railroad level crossing systems are used to prevent train from collisions by informing pedestrians and vehicles of approaching trains on the level crossing. The current detection systems mostly use track-based electrical circuits to detect approaching trains. The making and breaking of the circuit when the train wheel passes along the track sends a signal to barriers that restrict access to the track. Unfortunately, this track-based signal system is vulnerable to malfunctions in certain situations. If the rail becomes rusted due to moisture, weather conditions, or infrequent use, the electrical circuit detection system could fail. Such a failure could lead to a train-vehicle or train-pedestrian collision. This paper suggests a replacement of the electrical circuit-based system with an infrared detection system. The research shows that an infrared detection system improves safety by reducing the frequency of detection failure of the alarming circuit to system.

Improvement of Railway Signaling System for KTX and Conventional Trains Operated on a Five-Display Signal System Under a Four-Display Signaling System (4현시 철도신호체계에서 KTX 및 일반열차의 5현시 신호체계 운행을 위한 시스템 개선방안)

  • Lee, See-bin;Lyou, Joon
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.22 no.2
    • /
    • pp.162-169
    • /
    • 2016
  • Gyeong-bu railway line in Korea between Seoul and Cheon-an was built as two double tracks. A four-display signaling system, only for the metro line, was installed on the second double track so KTX and conventional trains can only operate on the first double track. This study suggests a method to allow KTX and conventional trains operated on the five-display signaling system to respond to accidents and track defects on the second double-track under the four-display signal system by means of problem analysis, calculation of breaking distances for KTX and conventional trains at each break mode, and improvement of the ATS system.