• 제목/요약/키워드: total load management

검색결과 415건 처리시간 0.026초

안양천 유역의 강우시 비점오염원에 따른 유출부하특성에 관한 연구 (Study on Runoff Characteristics of Nonpoint Sources during Rainfall in Anyangchun Watershed)

  • 황병기;유세진;차영기
    • 환경영향평가
    • /
    • 제10권3호
    • /
    • pp.223-234
    • /
    • 2001
  • In this study, we conducted a survey to examine the runoff characteristics of nonpoint sources, which wash off pollutants from the surface of basin during rainfall and affect water pollution of streams. An Anyangchun basin in the region Ewiwang City was selected as a study site. The basin divided into several subbasins such as Wanggokchun, Ojeonchun, and Anyangchun based on the tributaries, which confluence to the main stream of Anyangchun. Four times of field examination had been carried out between July and August of 2000, and water quality data collected from the surveys had been analysed. The survey includes in-situ flow, DO and PH measurements in the outlet of catchment. Laboratory analysis includes BOD, TN, TP. From the result, pollutant by runoff of nonpoint sources were washed out along with stormwater in the beginning of rainfall, and flowed into streams resulted in stream pollution. In case of BOD, the load from Ojeonchun catchment, most of which included urban areas, took up 50% of the total load from the entire watershed. Thus, by the results, it is clear that runoff load by urban nonpoint sources plays an important role in the control and management of nonpoint sources for the watershed.

  • PDF

환자 분류에 기초하여 입원병동의 적정 간호인력을 산정하는 모델 (Mathematical Model for In-Ward Nursing Staffing Optimization Based on Patient Classification System)

  • 김경옥;박미정;이인광;박경순;손호선;김경아;서창진;차은종
    • 대한의용생체공학회:의공학회지
    • /
    • 제37권2호
    • /
    • pp.75-83
    • /
    • 2016
  • Nursing staffing is of major interest in hospital management, however, no practical method has been developed. The present study proposed a mathematical model based on the patient classification system for nursing staffing optimization. A few characteristic parameters possibly determined experimentally and/or empirically were introduced followed by systematic calculation of the required number of nurses. An essential concept of the model is the unit work load defined as the amount of nursing work performed on single patient per unit time, where the work load is defined as the number of nursing staffs multiplied by the working hours. The unit work load was considered to vary with the patient classification level as well as the working time during a day, both of which were represented by corresponding parameter values. The number of patients for each class and the number of working hours were multiplied to the unit work load, and added up to obtain the total required work load. As the next step, the averaged number of hours that a nurse could provide per day was formulated considering the degree of nursing practice experience into 3 levels. Finally, the appropriate number of nursing staffs was calculated as the total work load divided by the average working hours per nurse. The present technique has a great advantage that the number of nursing staffs to fulfill the required work load is systematically calculated once the characteristic parameters are appropriately determined, leading to instant and fast evaluation. A practical PC program was also developed to apply the present model to nursing practice.

수질오염총량관리계획 수립을 위한 유달율 적용방안 검증 연구 (A Study on Verification of Delivery Ratio Methodology for Basic Plan at TPLMs(Total Pollutant Load Management System))

  • 이성준;이한필;박지형;김용석;황하선
    • 대한환경공학회지
    • /
    • 제39권12호
    • /
    • pp.714-722
    • /
    • 2017
  • 수질오염총량관리제도(이하 총량제)는 하천의 목표수질을 달성하기 위해 유역에서 배출되는 오염물질의 총량을 관리하는 제도이다. 유역에서 배출되는 오염물질의 허용총량은 수질모델을 활용하여 산정하며, 이과정에서 오염부하량은 발생, 배출, 유달부하량으로 구분할 수 있다. 유달부하량은 배출부하량과 유달율의 곱으로 계산되며 유달율은 유역에서 배출된 오염물질이 하천의 특정지점에 도달하는 비율로 정의된다. 본 연구에서는 Hwang(2016) 등이 제시한 기준유량 조건의 유달율 추정방법을 영강유역에 적용하고 QUALKO2 수질모델의 수질 입력자료를 생성하여 기준유량 조건의 유달율 산정방법(식 (3))과 평균 개념의 유달율 산정 방법(식 (2))의 비교분석을 통해 유달율 추정방법에 대한 검증 연구를 수행하였다. 연구결과, 유달율 함수식은 식 (2)와 식 (3) 모두 사용 가능하나, 배출계수 적용에 따라 방법론을 달리할 필요가 있다. 식 (2)를 사용할 경우는 배출계수를 저수량, 평수량 구분없이 1로 동일하게 사용해야 하며, 식 (3)을 사용할 경우는 기술지침에서 정한 배출계수(저수량 0.15, 평수량 0.5)를 적용해야 할 것으로 판단된다.

영산강수계 비점오염원 중점관리지역 선정에 관한 연구 (A Study on the Selection of Non-point Pollution Management Regions with High Priority Order in the Yeongsan River Basin)

  • 이재춘;박혜린;임병진;이창희;이수웅;이용운
    • 생태와환경
    • /
    • 제45권4호
    • /
    • pp.347-355
    • /
    • 2012
  • In this study, non-point pollution sources in the Yeongsan river basin are analyzed; then, the priority regions (areas divided on a small scale) of management are selected for efficient water management of the Seungcheon and Jooksan reservoirs, which were constructed as one of the 4 major rivers restoration projects. The priority regions are decided by using the criteria of the excessive rate of target water quality, non-point pollution load per unit area, total TP load and down flow distance. The results of this study are as follows. The upper 10% of the priority regions for non-point pollution management includes YB15, YB05, YB10, YB24, YB14 and YB11 for the Seungcheon reservoir watershed, and YC24, YC25, YC30, YC34, YC22 and YC17 for the Jooksan reservoir watershed. However, a few regions in each of the Seungcheon and Jooksan reservoirs need to be selected in higher order, and the non-point pollution removal facilities in the regions need to be installed with respect to budget, urgent matter, and so on.

WCBT를 이용한 대규모 자격관리 성능개선 시스템의 설계 및 구현 (Design and Implementation of a Large Scale Qualification Management System for Performance Improvement Through the Use of a WCBT(Web and Computer based Test))

  • 장영현
    • 한국컴퓨터정보학회논문지
    • /
    • 제13권2호
    • /
    • pp.67-78
    • /
    • 2008
  • 본 논문에서는 대규모 국가기술자격 종합관리시스템 구축 및 운영에서 중요한 관리요소인 상설검정체계가 안정성과 시스템부하 측면에서 불안요소를 가지고 있는바, 최대 효율성과 안정성을 기반으로 WBT(Web-based test)와 CBT(Computer-based test)의 장점만을 혼용한 WCBT시스템을 설계하고 구현하였다. 제안된 시스템의 성능평가를 위하여 기본적 시뮬레이션으로 파일럿시스템에서 제안 기술을 적용하여 검증 한 후 대한상공회의소 실시간 국가기술자격 시험에 적용한 결과 안정성이 입증되어 지방상공회의소까지 지속적으로 확대할 계획이다. 제안 시스템은 해외자격시험에서 자주 발생되는 통신장애 문제를 근본적으로 해결하였으며 시스템부하 측면에서 최대 효율성을 보여주었다. 본 논문에서 설계 및 구현한 WCBT 서버 및 클라이언트시스템은 운영자 및 시험 감독자의 관리체계와 편리성에서도 좋은 평가를 도출하였다.

  • PDF

Evaluation of Applicability of the ESTIMATOR Model for the Analysis of Nutrient Load Characteristics

  • Shin, Yong-Chul;Heo, Sung-Gu;Lim, Kyoung-Jae;Choi, Joong-Dae
    • 한국농공학회논문집
    • /
    • 제47권7호
    • /
    • pp.67-75
    • /
    • 2005
  • It has been well-known that the Nonpoint Source (NPS) pollutions are the primary contributors to water quality degradation in the receiving water bodies as well as the Point Source (PS) pollutions. To develop an effective management practice for water quality improvement, pollutant loads must be first estimated. In many studies, the Numeric Integration (NI) method has been used because of its ease of application, irrespective of the total number of samples collected for each storm event. Thus, there have been needs for more accurate pollutant load estimation with a limited number of water quality samples. In this study, NI method and regression method using the USGS ESTIMATOR model were comparatively used to calculate the pollutant loads for the Wolgokri watershed, Gangwon Province. The $NO_{3}$-N, T-N, and T-P loads using NI method and ESTIMATOR model were 13.85 kg/ha, 45.92 kg/ha, and 1.887 kg/ha, and 11.93 kg/ha,43.20 kg/ha, and 1.650 kg/ha, respectively. The estimated loads using ESTIMATOR model were lower than those using NI method by $86\%$, $94\%$, and $87\%$. These discrepancies in the estimated loads using a different load estimation method could be explained in that the total number of samples were not sufficient enough for NI method. Thus, ESTIMATOR model is recommended for the frequently stream discharge and less frequently measured water quality data.

Ex-ante Evaluation of Economic Costs from Power Grid Blackout in South Korea

  • Kim, Chang-Seob;Jo, Manseok;Koo, Yoonmo
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권3호
    • /
    • pp.796-802
    • /
    • 2014
  • South Korea is recently under serious situation in supplying electricity with enough power reserve. A single fault of power plant at a peak-load time may lead to a total blackout for whole area connected by a single electric grid and isolated from other grids. Despite of the seriousness of blackout, however, there are scarce studies with ex-ante analysis of the economic costs from blackout. In order to evocate the seriousness, we calculate the economic costs for both industrial and household sectors with using some survey data and statistical methodologies. As a result, total economic costs are 39.23 trillion KRW (35.83 trillion KRW for industrial sector, 3.40 trillion KRW for household sector).

GIS를 활용한 영산호 수계 오염원 데이터베이스 구축과 오염원관리 사용자 인터페이스 (Database and User Interface for Pollutant Source and Load Management of Yeungsan Estuarine Lake Watershed Using GIS)

  • 양홍모
    • 한국조경학회지
    • /
    • 제28권6호
    • /
    • pp.114-126
    • /
    • 2001
  • The purpose of this study is to establish the databases of pollutant sources and water quality measurement data by utilizing GIS, and making the user interface for the management of pollutant sources. Yeongsan Estuarine Lake was formed of a huge levee of 4.35 km constructed by an agricultural reclamation project. Water quality of the reservoir has been degraded gradually, which mainly attributes to increase of point and non-point source pollutant loads from the lake's watershed of 33,374.3 $\textrm{km}^2$ into it. Application of GIS to establishment of the database was researched of pint source such as domestic sewage, industrial wastewater, farm wastes, and fishery wastes, and non-pont source such as residence, rice and upland field, and forest runoffs of the watershed of the lake. NT Acr/Info and ArcView were mainly utilized for the database formation. Land use of the watershed using LANDSAT image data was analyzed for non-point source pollutant load estimation. Pollutant loads from the watershed into the reservoir were calculated using the GIS database and BOD, TN, TP load units of point and non-point sources. Total BOD, TN, TP loads into it reached approximately to 141, 715, 2,094 and 4,743 kg/day respectively. The loads can be used as input parameters for water quality predicting model of it. A user-friendly interface program was developed using Dialog Designer and Avenue Script of AcrView, which can perform spatial analysis of point and non-point sources, calculate pollutant inputs from the sources, update attribute data of them, delete and add point sources, identify locations and volumes of water treatment facilities, and examine water quality data of water sampling points.

  • PDF

평지밭과 고랭지밭의 비점오염에 대한 분석과 비교 (Analysis and Comparison about NPS of Plane Field and Alpine Field)

  • 최용훈;원철희;서지연;신민환;양희정;임경재;최중대
    • 한국물환경학회지
    • /
    • 제25권5호
    • /
    • pp.682-688
    • /
    • 2009
  • A plane field and a sloped field located at low-land plane and alpine areas, respectively, were monitored with respect to runoff, water quality and fertilizer uses from March to December, 2008. Runoff volume and Non-Point Source (NPS) loads were estimated and analyzed with respect to fertilizer uses. Total TN and TP loads from the sloped field were higher than those from plane field because of larger chemical uses in the alpine field than in the plane field. Organic matter load from plane field was higher than that from sloped field because more organic compost was applied to plane field than to sloped field. Event Mean Concentration (EMC) of measured water quality indices were relatively higher in both fields. Organic matter load per 1 mm rainfall were higher in plane field and TN and TP loads per 1 mm rainfall were higher in sloped field than those in respective comparing field. It was concluded that the type and application method of fertilizer could play an important role in the estimation of NPS pollution loads and the development of Best Management Practices (BMPs). However, it was recommended that long-term monitoring is necessary to better describe the relationship between fertilizer uses and water quality from agricultural fields because numerous natural and management factors other than fertilizer also affect runoff quality.

낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구 (A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River)

  • 손태석;박재범;신현석
    • 한국물환경학회지
    • /
    • 제25권5호
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.