• Title/Summary/Keyword: total completion time

Search Result 179, Processing Time 0.023 seconds

Minimizing the Total Stretch in Flow Shop Scheduling

  • Yoon, Suk-Hun
    • Management Science and Financial Engineering
    • /
    • v.20 no.2
    • /
    • pp.33-37
    • /
    • 2014
  • A flow shop scheduling problem involves scheduling jobs on multiple machines in series in order to optimize a given criterion. The flow time of a job is the amount of time the job spent before its completion and the stretch of the job is the ratio of its flow time to its processing time. In this paper, a hybrid genetic algorithm (HGA) approach is proposed for minimizing the total stretch in flow shop scheduling. HGA adopts the idea of seed selection and development in order to reduce the chance of premature convergence that may cause the loss of search power. The performance of HGA is compared with that of genetic algorithms (GAs).

The Effect of Asynchronous Haptic and Video Feedback on Teleoperation and a Comment for Improving the Performance (비 동기화된 촉각과 영상 시간지연이 원격조종로봇에 미치는 영향과 성능 향상을 위한 조언)

  • Kim, Hyuk;Ryu, Jee-Hwan
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.18 no.2
    • /
    • pp.156-160
    • /
    • 2012
  • In this paper, we investigate the effect of asynchronous haptic and video feedback on the performance of teleoperation. To analyze the effect, a tele-manipulation experiment is specially designed, which operator moves square objects from one place to another place by using master/slave telerobotic system. Task completion time and total number of falling of the object are used for evaluating the performance. Subjective study was conducted with 10 subjects in 16 different combinations of video and haptic feedback while participants didn't have any prior information about the amount of each delay. Initially we assume that synchronized haptic and video feedback would give best performance. However as a result, we found that the accuracy was increased when haptic and video feedback was synchronized, and the completion time was decreased when one of the feedback (either haptic or video) was decreased. Another interesting fact that we found in this experiment is that it showed even better accuracy when haptic information arrives little bit earlier than video information, than the case when those are synchronized.

Scheduling Orders for Minimizing Total Weighted Tardiness (가중납기지연시간을 고려한 최적 주문처리순서에 관한 연구)

  • Lee, Ik-Sun;Yoon, Sang-Hum
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.33 no.2
    • /
    • pp.87-101
    • /
    • 2008
  • This paper considers an order scheduling model to minimize the total weighted tardiness of orders. Each order requires different types of products. Each type of product is manufactured on its dedicated machine specified in advance. The completion time of each order is represented by the time when all the products belonging to the order are completed. The objective of this paper is to find the optimal production schedule minimizing the total weighted tardiness of a finite number of orders. In the problem analysis, we first derive a powerful solution property to determine the sequence of two consecutive orders. Moreover, two lower bounds of objective are derived and tested along with the derived property within a branch-and-bound scheme. Two efficient heuristic algorithms are also developed. The overall performances of the proposed property, branch-and-bound and heuristic algorithms are evaluated through various numerical experiments.

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

Two-Agent Single-Machine Scheduling with Linear Job-Dependent Position-Based Learning Effects (작업 종속 및 위치기반 선형학습효과를 갖는 2-에이전트 단일기계 스케줄링)

  • Choi, Jin Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.3
    • /
    • pp.169-180
    • /
    • 2015
  • Recently, scheduling problems with position-dependent processing times have received considerable attention in the literature, where the processing times of jobs are dependent on the processing sequences. However, they did not consider cases in which each processed job has different learning or aging ratios. This means that the actual processing time for a job can be determined not only by the processing sequence, but also by the learning/aging ratio, which can reflect the degree of processing difficulties in subsequent jobs. Motivated by these remarks, in this paper, we consider a two-agent single-machine scheduling problem with linear job-dependent position-based learning effects, where two agents compete to use a common single machine and each job has a different learning ratio. Specifically, we take into account two different objective functions for two agents: one agent minimizes the total weighted completion time, and the other restricts the makespan to less than an upper bound. After formally defining the problem by developing a mixed integer non-linear programming formulation, we devise a branch-and-bound (B&B) algorithm to give optimal solutions by developing four dominance properties based on a pairwise interchange comparison and four properties regarding the feasibility of a considered sequence. We suggest a lower bound to speed up the search procedure in the B&B algorithm by fathoming any non-prominent nodes. As this problem is at least NP-hard, we suggest efficient genetic algorithms using different methods to generate the initial population and two crossover operations. Computational results show that the proposed algorithms are efficient to obtain near-optimal solutions.

Survey for the Side effects of Radiation Therapy Following Breast Cancer Surgery : Comparision of Modified Raidcal Mastectomy and Breast Conservative Surgery (유방암 환자의 수술후 방사선치료의 부작용의 변화 : 유방절제술과 유방보존술의 비교)

  • Chon, Myong-Hui
    • Journal of Haehwa Medicine
    • /
    • v.5 no.2
    • /
    • pp.473-484
    • /
    • 1997
  • This study was performed to survey the specific information about the time of onset, frequency, duration, and severity of the side effect of radiation therapy following breast cancer surgery, and identify the difference of these data according to the type of breast cancer surgery : modified radical mastectomy(MRM) vs. breast consevative operation(BCO). 38 breast cancer patients were interviewed with side effect profile about radiation therapy. Interview was done weekley from the start of radiation therapy through 6 weeks and 3 month follow-up interview was done at 3 month after completion of the treatment. The results are as follow : 1. Total score of side effect experienced by the breast cancer patients was rapidly increased at 2-3 week after intiating treatement and continousely raised maintaing high score until completion of the treatement. Some problems like cough, dyspnea and pain were more experienced after treatment. 2. Patients with modified radical mastectomy showed more total score of side effects than patients with breast conservative operation. And both patients with MRM and BCO experienced similar pattern of side effect to radiation therapy. Through these data we concluded that side effect to radiation therapy was not ended at completion of treatement. Patents will continously experiend various problems and suffer from not only acute side effects like skin problem, sore throat and swollowing difficulty but also late effect of the radiation therapy. Clinically these data can be used for oncologic nurse to provide informational interventions to prepare breast cancer patients for the radiation therapy.

  • PDF

Simulated Annealing for Two-Agent Scheduling Problem with Exponential Job-Dependent Position-Based Learning Effects (작업별 위치기반 지수학습 효과를 갖는 2-에이전트 스케줄링 문제를 위한 시뮬레이티드 어닐링)

  • Choi, Jin Young
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.4
    • /
    • pp.77-88
    • /
    • 2015
  • In this paper, we consider a two-agent single-machine scheduling problem with exponential job-dependent position-based learning effects. The objective is to minimize the total weighted completion time of one agent with the restriction that the makespan of the other agent cannot exceed an upper bound. First, we propose a branch-and-bound algorithm by developing some dominance /feasibility properties and a lower bound to find an optimal solution. Second, we design an efficient simulated annealing (SA) algorithm to search a near optimal solution by considering six different SAs to generate initial solutions. We show the performance superiority of the suggested SA using a numerical experiment. Specifically, we verify that there is no significant difference in the performance of %errors between different considered SAs using the paired t-test. Furthermore, we testify that random generation method is better than the others for agent A, whereas the initial solution method for agent B did not affect the performance of %errors.

Postoperative Complications and Their Risk Factors of Completion Total Gastrectomy for Remnant Gastric Cancer Following an Initial Gastrectomy for Cancer

  • Park, Sin Hye;Eom, Sang Soo;Eom, Bang Wool;Yoon, Hong Man;Kim, Young-Woo;Ryu, Keun Won
    • Journal of Gastric Cancer
    • /
    • v.22 no.3
    • /
    • pp.210-219
    • /
    • 2022
  • Purpose: Completion total gastrectomy (CTG) for remnant gastric cancer (RGC) is a technically demanding procedure and associated with increased morbidity. The present study aimed to evaluate postoperative complications and their risk factors following surgery for RGC after initial partial gastrectomy due to gastric cancer excluding peptic ulcer. Materials and Methods: We retrospectively reviewed the data of 107 patients who had previously undergone an initial gastric cancer surgery and subsequently underwent CTG for RGC between March 2002 and December 2020. The postoperative complications were graded using the Clavien-Dindo classification. Logistic regression analyses were used to determine the risk factors for complications. Results: Postoperative complications occurred in 34.6% (37/107) of the patients. Intra-abdominal abscess was the most common complication. The significant risk factors for overall complications were multi-visceral resections, longer operation time, and high estimated blood loss in the univariate analysis. The independent risk factors were multi-visceral resection (odds ratio [OR], 2.832; 95% confidence interval [CI], 1.094-7.333; P=0.032) and longer operation time (OR, 1.005; 95% CI, 1.001-1.011; P=0.036) in the multivariate analysis. Previous reconstruction type, minimally invasive approach, and current stage were not associated with the overall complications. Conclusions: Multi-visceral resection and long operation time were significant risk factors for the occurrence of complications following CTG rather than the RGC stage or surgical approach. When multi-visceral resection is required, a more meticulous surgical procedure is warranted to improve the postoperative complications during CTG for RGC after an initial gastric cancer surgery.

Project Time-Cost Tradeoff Problem with Milestones under an Uncertain Processing Time (불확실한 환경 하에서 중간 평가가 있는 시간-비용 프로젝트 문제)

  • Choi, Byung-Cheon;Chung, Jibok
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.38 no.2
    • /
    • pp.25-42
    • /
    • 2013
  • We consider a project time-cost tradeoff problem with two milestones, where one of the jobs has an uncertain processing time. Unless each milestone is completed on time, some penalty cost may be imposed. However, the penalty costs can be avoided by compressing the processing times of some jobs, which requires additional resources or costs. The objective is to minimize the expected total costs subject to the constraint on the expected project completion time. We show that the problem can be solved in polynomial time if the precedence graph of a project is a chain.

Uniform Parallel Machine Scheduling (병렬기계에서의 스케쥴링에 관한 연구)

  • Kim, Dae-Cheol
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.29 no.2
    • /
    • pp.7-12
    • /
    • 2006
  • This study considers the problem of scheduling jobs on uniform parallel machines with a common due date. The objective is to minimize the total absolute deviation of job completion times about the common due date. This problem is motivated by the fact that a certain phase of printed circuit board manufacturing is bottleneck and the processing speeds of parallel machines in this phase are uniformly different for all jobs. Optimal properties are proved and a simple polynomial time optimal algorithm is developed.