1 |
Bell, J., "Beauty is in the eye of the beholder : Establishing a fair and equitable value for embryonic high-tech enterprises," Venture Capital Journal, Vol.40(2000), pp.33-34.
|
2 |
Ben-Tal, A. and A. Nemirovski, "A robust optimizatioin-Methodelogy and applications," Mathematical Programming, Vol.92(2002), pp.86-100.
|
3 |
Bowman, R.A., "Stochastic gradient-based time-cost tradeoffs in pert networks using simulation," Annals of Operations Research, Vol.53(1994), pp.533-551.
DOI
|
4 |
Cohen, I., B. Golany, and A. Shtub, "The stochastic time-cost tradeoff problem : A robust optimization approach," Networks, Vol.49(2007) pp.175-188.
DOI
ScienceOn
|
5 |
De, P., J. Dunne, J.B. Ghosh, and C.E. Wells, "Complexity of the discrete time-cost trade-off problem for project networks," Operations Research, Vol.45(1997), pp.302-306.
DOI
ScienceOn
|
6 |
Fulkerson, D.R. "A network flow computation for project cost curves," Management Science, Vol.7(1961), pp.167-178.
DOI
ScienceOn
|
7 |
Garey, M.R. and D.S. Johnson, Computers and intractability : A guide to the theory of NP-completeness W.H. Freeman, 1979.
|
8 |
Gutjahr, W.J., C. Strauss, and E. Wagner, "A stochastic branch-and-bound approach to activity crashing in project management," Informs Journal on Computing, Vol.12(2000), pp.125-135.
DOI
ScienceOn
|
9 |
Hagstrom, J.N., "Computational complexity of pert problems," Networks, Vol.1(1988), pp. 139-147.
|
10 |
Hazir, O., M. Haouari, and E. Erel, "Robust scheduling and robustness measures for the discrete time-cost trade-off problem," European Journal of Operational Research, Vol. 207(2010), pp.633-643.
DOI
ScienceOn
|
11 |
Hillier, F.S. and G.J. Lieberman, Introduction to Operations Research, newblock McGraw-Hill, New York, NY, 2001.
|
12 |
Kelley, J.E., "Critical path planning and scheduling : Mathematical basis," Operations Research, Vol.9(1961), pp.296-320.
DOI
ScienceOn
|
13 |
Leu, S.S., A.T. Chen, and C.H. Yang, "A GA-based fuzzy optimal model for construction time-cost trade-off," International Journal of Project Management, Vol.19(2001), pp. 47-58.
DOI
ScienceOn
|
14 |
Mokhtari, H., A. Aghaie, J. Rahimi, and A. Mozdgir, "Project time-cost trade-off scheduling : a hybid optimization approach," International Journal of Advanced Manufacturing Technology, Vol.50(2010), pp.811-822.
DOI
|
15 |
Roemer, T. and R. Ahmadi, "Concurrent crashing and overlapping in product development," Operations Research, Vol.52(2004), pp.606-622.
DOI
ScienceOn
|
16 |
Sahlmann, W.A., "Insights from the ventures capital model of project governance," Business Economics, Vol.29(1994), pp.35-41.
|
17 |
Shtub, A., J.F. Bard, and S. Globerson, Project Managemnet : Engineering, Technology and Implementation, Prince Hall, Englewood Cliff, NJ. (1994).
|
18 |
Skutella, M., "Approximation algorithms for the discrete time-cost tradeoff problem," Proceedings of the Eighth Annual ACM-SIAM Symposium on Discrete Algorithms, New Orleans, L.A. (1997), pp.501-508.
|
19 |
Weglarz, J., J. Jozefowska, M. Mika, and G. Waligora, "Project scheduling with finite or infinite number of activity processing modes -a survey," European Journal of Operational Research, Vol.208(2011), pp.177-205.
DOI
ScienceOn
|
20 |
Wollmer, R.D., "Critical path planning under uncertainty," Mathematical Programming Study, Vol.25(1985), pp.164-171.
DOI
|