1 |
Sung, C.S. and S.H. Yoon, "Minimizing Total Weighted Completion Time at a Preassembly Stage Composed of Two Feeding Machines," International Journal of Production Economics, Vol.54(1998), pp.247-255
DOI
ScienceOn
|
2 |
Yang, J. and M.E. Posner, "Scheduling Parallel Machines for the Customer Order Problem," Journal of Scheduling, Vol.8(2005), pp.49-74
DOI
|
3 |
Yoon, S.H. and C.S. Sung, "Fixed Pre-assembly Scheduling on Multiple Fabrication Machines," International Journal of Production Economics, Vol.96(2005), pp.109-118
DOI
ScienceOn
|
4 |
Leung, J.Y. T., H. Li, and M. Pinedo, "Order Scheduling Models with Applications in Practice, "Proceedings of the First Multidisciplinary International Conference on Scheduling:Theory and Applications(MISTA), Nottigham(2003), pp.2-10
|
5 |
Wang, G. and T.C.E. Cheng, "Customer Order Scheduling to Minimize Total Weighted Completion Time," to appear in Omega (2006)
|
6 |
Baker, K.R., "Heuristic Procedures for Scheduling Job Families with Setups and the Due Dates," Naval Research Logistics, Vol.46(1999), pp.978-991
DOI
ScienceOn
|
7 |
Leung, J.Y. T., H. Li, and M. Pinedo, "Approximation Algorithms for Minimizing Total Weighted Completion Time of Orders on Identical Machines in Parallel," Naval Research Logistics, Vol.53(2006), pp.243-260
DOI
ScienceOn
|
8 |
Maheswaran, R. and S.G. Ponnambalam, "An Investication on Single Machine Total Weighted Tardiness Scheduling Problems," International Journal of Advanced Manufacturing Technology, Vol.22(2003), pp.243-248
DOI
|
9 |
Peterkofsky, R.L. and C.F. Daganzo, "A Branch and Bound Solution for the Crane Scheduling Problem," Transportation Research, Vol.24B(1990), pp.159-172
|
10 |
Yang, J., Scheduling with Batch Objectives, Ph.D. Thesis, Industrial and Systems Engineering Graduate Program, The Ohio State University (1998)
|
11 |
Leung, J.Y. T., H. Li, and M. Pinedo, "Scheduling Orders for Multiple Product Types with Due Date Related Objectives," European Journal of Operational Research, Vol.168(2006), pp.370-389
DOI
ScienceOn
|
12 |
Ahmadi, R., U. Bagchi, and T.A. Roemer, "Coordinated Scheduling of Customer Orders for Quick Response," Naval Research Logistics, Vol.52(2005), pp.493-512
DOI
ScienceOn
|
13 |
Huegler, P.A. and F.J. Vasko, "A Performance Comparison of Heuristics for the Total Weighted Tardiness Problem," Computers and I.E., Vol.32(1997), pp.753-767
DOI
ScienceOn
|
14 |
Leung, J.Y. T., H. Li, and M. Pinedo, "Order Scheduling in an Environment with Dedicated Resources in Parallel," Journal of Scheduling, Vol.8(2005), pp.355-386
DOI
|
15 |
Pinedo, M., Scheduling:Theory, Algorithms, and Systems, Prentice Hall, Englewood Cliffs, NJ, 1995
|
16 |
Kanet, J.J. and X. Li, "A Weighted Modified Due Date Rule for Sequencing to Minimize Weighted Tardiness," Journal of Scheduling, Vol.7(2004), pp.261-276
DOI
ScienceOn
|
17 |
Kim, Y.-D., "Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness," Journal of the Operational Research Society, Vol.44(1993), pp.19-28
DOI
|