• Title/Summary/Keyword: torricellis' theorem

Search Result 2, Processing Time 0.018 seconds

A Study of a Dike Design Considering a Leakage Velocity at an Opening Hole in Case of a Leakage Accident (누출사고 시 저장탱크 위험물 누출속도를 고려한 방유제 설계에 관한 연구)

  • Lee, Jae Yeol;Kim, Dong Hyun;Ban, Soon Hee;Lee, Chang Jun
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.6
    • /
    • pp.40-45
    • /
    • 2017
  • Chemical accidents generated during maintenance, repair, and normal operation, such as dispersion, fire, and explosions, can cause massive losses like a 2012 hydro fluorine leak in Gumi, South Korea. Since this accident, many researches have studied physical mitigation systems. However, due to many difficulties including potential costs and lack time, it is really hard for many companies to install mitigation systems without prior knowledge. Thus, the efficacy of mitigation system should be evaluated. This study assesses a dike design considering the fluid velocity at an open hole when a leakage accident occurs. It is assumed that leakage materials follow a free fall motion. Throughout case studies, a current KOSHA guide for a dike design was evaluated and new guidelines handling various conditions were proposed.

A Study of the Distance between a Tank and a Dike Considering a Leakage Velocity at an Opening Hole in case of a Leakage Accident (누출사고 시 저장탱크 위험물 누출속도를 고려한 탱크와 방유제 사이 간격에 관한 연구)

  • Lee, Jae Yeol;Kim, Dong Hyun;Ban, Soon Hee;Lee, Chang Jun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.5
    • /
    • pp.35-41
    • /
    • 2018
  • Chemical accidents generated during maintenance, repair, and normal operation, such as dispersion, fire, and explosions, can cause massive losses like a 2012 hydro fluorine leak in Gumi, South Korea. Since this accident, many researches have studied physical mitigation systems. However, due to the lack of potential costs and time, it is really hard for many companies to install mitigation systems without prior knowledge. Thus, the efficacy of mitigation system should be evaluated. This study assesses a dike design considering the fluid velocity at an open hole when a leakage accident occurs. It is assumed that leakage materials follow a free fall motion. Throughout case studies, a current KOSHA guide for a dike design was evaluated and new guidelines handling various conditions were proposed.