• 제목/요약/키워드: time schedule

검색결과 1,363건 처리시간 0.031초

SW 공학수준과 SW 프로젝트 납기성과와의 관계 (Evaluation on the Relationship between Software Engineering Level and Schedule Deviation in Software Development)

  • 김승권;고병선
    • 한국IT서비스학회지
    • /
    • 제10권4호
    • /
    • pp.191-204
    • /
    • 2011
  • Recently, many software companies are trying to improve the software quality and project outcome with more costs and efforts in development time. In the software convergence and integration environments, it is required efforts to gain high quality of software. In other words, it is required to utilize software engineering knowledge and technology for higher software quality and better software project productivity. The Software development productivity can be varied by software process capability according to building a framework for software development, selection and use of appropriate technology, human resource management. Software process capability will influence software project outcome which is the general opinion. This study provides empirical evidence about software engineering efforts and investment approach to lead software project performance. We measured the software engineering efforts by SW engineering level and analyzed the corelation between software engineering level and schedule deviation. And, we verified that this performance is affected by the size of software company. As a result, software process capability is important to build a infrastructure and develop systematically software project. The higher software engineering level can lead to improved software project performance.

Effect of Initial (Reference) Welding Current for Adaptive Control and It's Optimization to Secure Proper Weld Properties in Resistance Spot Welding

  • Ashadudzzaman, Md.;Choi, Il-Dong;Kim, Jae-Won;Nam, Dae-Geun;Park, Yeong-Do
    • Journal of Welding and Joining
    • /
    • 제33권6호
    • /
    • pp.13-20
    • /
    • 2015
  • Many automotive companies are endeavoring to improve the quality of resistance spot welding by updating body-in-white (BIW) production line with adaptive control spot welding system to compensate the process disturbances such as gap, electrode wear, oxidized surfaces, poor fit up and adhesive etc. Most of the commercial adaptive weld controllers require proper "Initial Welding Schedule" or "Reference weld" to achieve compensation in welding parameters during real time welding. In this study, the compensation of a commercial adaptive weld controller had been observed and analyzed thoroughly for various process disturbances to find optimal initial welding schedule. It was observed that 90 percent of the expulsion current in constant current control as reference welding schedule conferred the maximum button diameter in adaptive control welding. Finally, effects of each disturbance in combined field disturbances system with adaptive control had also been confirmed with the design of experiment (DOE) by minitab(R)16 for combined disturbances situation and suitability of optimum initial weld current had also established with real body part validation test.

항공기 엔진 정비 일정 수립을 위한 동적 계획 모델 개발 (Developing a dynamic programming model for aircraft-engine maintenance scheduling)

  • 주성종;신상헌
    • 경영과학
    • /
    • 제13권3호
    • /
    • pp.163-172
    • /
    • 1996
  • According to flying hours, aircraft engines require regular overhaul for preventive maintenance. Because of hostile defense environment of Republic of Korea, the aircraft of republic of Korea Air Force(ROKAF) have been operated at the maximum level of availability and have similar overhaul schedule in several months. The concentration of overhaul schedule in a short period demands additional spare engines far exceeding the spare engines for corrective maintenance. If ROKAF decides to purchase extra engines for the preventive maintenance, the extra engines will be used only for the preventive maintenance and will be excess inventory for the most of aircraft life ccle. Also, the procurement of extra engines is significant investment for ROKAF. To help ROKAF schedule the preventive maintenance without significant spending, this study develops a dynamic programming model that is solvable using an integer programming algorithm. The model provides the number of engines that should be overhauled for a month for multiple periods under given constraints. ROKAF actually used this model to solve a T-59 engine overhaul problem and saved about three billion won at one time. ROKAF plans to use this model continuously for T-59 and other weapon systems. Thus, saving for long term will be significant to ROKAF. Finally, with minor modification, this model can be applied to deciding the minimum number of spare engines for preventive maintenance.

  • PDF

흑판모델을 이용한 일정계획 전문가 시스템 (A Blackboard-Based Scheduling Expert System)

  • 박지형;강무진;이교일
    • 대한기계학회논문집A
    • /
    • 제20권1호
    • /
    • pp.14-23
    • /
    • 1996
  • Scheduling jobs effectively under consideration of actual loads on machines is one of the most complicated tasks in production control. The complexity of the finite capacity scheduling often makes the conventional methods of industrial engineering fail. As an alternative, Knowledge-based approaches to job-shop scheduling have been evolved recently. This paper presents a blackboard- based scheduling expert system which combines knowledge-based scheduling with interactive scheduling. It is shown to be possible to generate the feasible schedule within a reasonable time. Flexible reaction management is also possible while keeping the changes in the generated schedule to the minimal and adjusting the schedule to tardy operations or working environmental changes. The system is equipped with a rule base with heuristics for handling conflicted event. A case study applying the implemented system is described.

Barriers of Last Planner System: A Survey in Vietnam Construction Industry

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제3권4호
    • /
    • pp.5-11
    • /
    • 2013
  • Construction industry is overwhelmed by delay and often has suffered cost and time overrun. In this context, Last Planner System (LPS) has been considered as a very useful tool for the management of the construction process. Many previous studies have reported its effectiveness in construction performance. This study aims to evaluate the level of importance of the Last Planner processes in the Vietnam construction industry (VCI), and analyze the existing barriers when implementing these processes in construction management. These barriers were collected based on previous studies from International Group for Lean Construction (IGLC). A survey was carried out through questionnaire. The respondents are been experienced people in construction project management. There are four processes of LPS that were investigated including master schedule, phase schedule, lookahead plan, and weekly work plan. The results showed that master schedule is the most important item when performing a construction project in the VCI. The highest degree of agreement belongs to 'owner - contractor' pair with 77.1% importance indices; whereas the lowest belongs to 'consultants - contractors' pair with 63.8% importance indices. Eventually, three barrier factors were extracted from factor analysis technique with 62.2% of variance explained.

사과 겹무늬썩음병의 효과적 방제를 위한 약제살포 체계의 수립 1. 사과의 생육시기별 보호살균제의 선택 원칙 (Establishment of Fungicidal Spray Schedule for Effective Control of Apple White Rot 1. Guiding Principles for Selecting Protective Fungicides in Accordance with Apple Growing Season)

  • 정미혜;김대희;엄재열
    • 한국식물병리학회지
    • /
    • 제10권4호
    • /
    • pp.284-291
    • /
    • 1994
  • In order to establish an appropriate spray schedule to reduce the infection, 11 kinds of chemicals were tested for their properties on the inhibition of spore germination at the surface of apple fruits and the duration of the inhibitory effect after spray of each chemical was examined from late June to early September with basically 10 day intervals. Actual control efficacy of each chemical by the 8 successive spray and the patterns of waterborne spore dispersals during that periods were also examined. Combining those results with the meteorological observation data, actual control efficacy of each chemical in the given periods could be estimated. It was revealed that folpet, Brodeaux mixture, mancozeb, oxine copper and imminoctadine-triacetate could be used at any time during the possible infection periods. Captan and dithianon could also be used except the rainy season due to the short duration of inhibitory efficacy against spore germination under heavy rain. However, the usefulness of propineb, benomyl and chlorothalonil against the apple white rot could not be demonstrated in this experiment. Thiram, even though has not been used for apple white rot, can also be used before or after the rainy season to control not only white rot but also alternaria blotch.

  • PDF

User context conjecture system using location and schedule information

  • Ogasawara, Naohito;Sato, Kiwamu;Nunokawa, Hiroshi;Shiratori, Norio;Noguchi, Shoichi
    • 한국감성과학회:학술대회논문집
    • /
    • 한국감성과학회 2002년도 춘계학술대회 논문집
    • /
    • pp.152-155
    • /
    • 2002
  • In recent years, with the spread of communication media, such as a cellular phone and E-mail, we are able to communicate with others without any restriction of position or time. However, complexity of communicative context has increased so that user has to guess a partner user's situation and status in order to use various medias efficiently. This problem will grow larger as new media are brought in the expanding communications network. To solve this problem, we propose the system that guesses the context in communication by a user's media from the position information on PHS (Personal Handy phone System) and schedule information from schedule application. In this system a user's agent guesses automatically the context that owner has set, and answers the demand of the context from a partner user. Moreover, the agent decides a suitable answer, when there is a demand of communication by the media, which cannot be used.

  • PDF

다중프로세서에서 비순환 타스크 그래프의 최적 스케쥴링에 관한 연구 (A Study on Optimal Scheduling with Directed Acyclic Graphs Task onto Multiprocessors)

  • 조민환
    • 한국컴퓨터정보학회논문지
    • /
    • 제4권4호
    • /
    • pp.40-46
    • /
    • 1999
  • 병렬 처리시스템 환경에서 효율적인 타스크 스케줄링에 관한 연구로서 타스크 전체 수행 시간을 단축시는데 목적을 두고 있다. 멀티프로세서 시스템에서 선행 조건 을 갖는 타스크 그래프의 타스크 스케쥴링은 시스템 처리시간에 많은 영향을 준다. 이 문제는 NP-hard로 알려져 있으며, 많은 사람들이 heuristic 방법으로 최적해에 접근하려고 노력 하고 있다. 우리는 기존 여러 방법들 (swapping, MH, DL)과 개선된 critical path schedule 방법과 상호 비교하였다. 다수개의 root와 다수개의 terminate를 가지는 방향성 비순환 그래프(Directed Acyclic Graph : DAG)를 Random 생성하여 시뮬례이션 한 결과 프로세서 수를 증가한 경우 개선된 Critical Path알고리즘이 실행 타스크의 탐색 시간 개선에 더 우수한 것으로 판명되었다.

  • PDF

디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축 (Construction of Scheduling Support System for Panel Lines by Digital Manufacturing Simulation)

  • 이광국;최동환;한상동;박주용;신종계
    • 대한조선학회논문집
    • /
    • 제43권2호
    • /
    • pp.228-235
    • /
    • 2006
  • Nowadays, digital manufacturing has been known to be very effective method in manufacturing fields. It is aimed to estimate process time, to improve operation efficiency, and to prevent bottleneck processes in advance of real manufacturing. This paper addresses a scheduling support system for panel hues in a shipyard through digital manufacturing simulation. The proposed system supports operators to make better decisions on the shop-floor scheduling in panel lines. It ,would provide a complete schedule that is at least as good as any schedule currently obtained. Furthermore, it can evaluate the operator's schedule by simulating it with 3-dimensional models before the work orders and schedules are released.

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF